METRO Magazine Logo
MenuMENU
SearchSEARCH

Bombardier wireless electric bus charging to power Berlin fleet

The PRIMOVE system charges the Berlin buses' batteries at 200 kW in the very few minutes of dwell time spent at the end stations. This allows the e-buses to serve the nearly four-mile-long bus line back and forth - without additional stops or battery changing for an entire day.

March 31, 2015
Bombardier wireless electric bus charging to power Berlin fleet

PRIMOVE 12 m e -bus for Berlin – showing the components of PRIMOVE charging and battery syste.

3 min to read


PRIMOVE 12 m e -bus for Berlin – showing the components of PRIMOVE charging and battery syste.

Berlin will be the first capital city to turn a complete bus line into an eco-friendly route using e-buses with the wireless PRIMOVE charging system and the compact PRIMOVE battery system. Starting in summer 2015, passengers on the city centre bus line 204 will be able to enjoy a quiet and zero-emission ride through Berlin. The German Federal Ministry of Transport and Digital Infrastructure (BMVI) is supporting the project in the context of the "International Showcase Programme for E-mobility Berlin Brandenburg".

RELATED:German bus system to test Bombardier electric charging tech

Ad Loading...

On the occasion of the installation of the inductive charging pad at Berlin's first charging station the project partners Berliner Verkehrsbetriebe (BVG; Berlin public transport authority), Technical University (TU) Berlin and Bombardier Transportation invited representatives from the BMVI, the City of Berlin and media to inform them about the technical details of the wireless charging technology, the current project status and the further project milestones. At the event, guests had the rare opportunity to inspect the charging pad, which will be invisibly embedded under the ground in just a few days. The precast charging pad weighs seven tons, is 16 feet long, 6.5 feet wide and 10 inches thick.

Bombardier's innovative PRIMOVE system charges the Berlin buses' batteries at 200 kW in the very few minutes of dwell time spent at the end stations. This allows the e-buses to serve the nearly four-mile-long bus line back and forth - without additional stops or battery changing for an entire day. As with an electric toothbrush, charging works without a cable connection. As soon as the e-bus is positioned over the underground charging pad, the pick-up coil mounted on the underside of the vehicle lowers. The inductive energy transfer begins, generating an electromagnetic field. This poses no danger to drivers, passengers or pedestrians - or even to people with pacemakers. With the optimization of the transfer frequencies and advanced shielding, the charging system falls well below the very strict European limit values for electromagnetic emissions.

Starting in April 2015, additional PRIMOVE charging stations will be installed at the route's second end stop as well as at BVG's bus depot where the four e-buses will be based. The e-buses will be built this spring by the Polish manufacturer Solaris. The twelve meter long vehicles are nearly identical to the Urbino 12 electric bus equipped with PRIMOVE charging and batteries, which has been in successful passenger operations in Braunschweig, Germany, since March 2014. The delivery of the first e-bus to the Bombardier site in Mannheim, Germany, for final coordination of the technical components is planned for May 2015. Following this, the vehicles will be delivered to Berlin for approval and commissioning. In summer 2015, passenger operations on route 204 will commence.

Berlin's new fleet of e-buses will save around 260 tons of CO2 per year. In order to achieve the same affect, around 250 private cars in Berlin, on the basis of normal driving behaviour, would have to be switched to electric mode.

More Technology

A Nova LFSe+ electric bus for STM
Technologyby Staff and News ReportsJune 18, 2026

Biz Briefs: Montréal Debuts Nova Electric Buses and More

In this edition of Biz Briefs, we spotlight the latest developments shaping the future of mobility.

Read More →
Zero-emissions bus with FLEETWATCH technology
ManagementJune 17, 2026

The Hidden Cost of Fuel Data Inaccuracy in Public Transit Fleets

In today's transit environment, accurate fuel and mileage data are critical to reducing costs, minimizing downtime, and improving fleet performance.

Read More →
A user demonstrating Metrolink's contactless fare payment pilot.
Technologyby StaffJune 12, 2026

Southern California's Metrolink Debuts Contactless Fare Payment Pilot

Customers traveling between Redlands and Los Angeles can now tap their preferred payment method, including a credit or debit card, mobile wallet, or wearable device, at station validators before boarding and again while exiting.

Read More →
Ad Loading...
Driving Change Through Technology
Technologyby Alex RomanJune 12, 2026

METROspectives: CharterUP CEO Armir Harris on Modernizing Mobility

From digital transformation to evolving customer demands, CharterUP's CEO Armir Harris offers his perspective on the transportation industry's next chapter.

Read More →
An NJ TRANSIT River Line light rail vehicle.
Technologyby StaffJune 11, 2026

NJ TRANSIT Issues RFI for Unified Real-Time Customer Information Platform

The agency is seeking input from companies that provide real-time transit communications systems as part of an effort to enhance the customer experience and modernize how riders receive service alerts, travel information, and system status updates.

Read More →
A MARTA articulated BRT bus
Technologyby Staff and News ReportsJune 11, 2026

Mobile Apps and Passenger Information Top METRO's Business Briefs

In our latest installment, we take a look at recent news from Masabi, Axentia, Moovit, and more partnerships making headlines across the transportation sector.

Read More →
Ad Loading...

Biz Briefs: Masabi Partners with LANTA and More

In this edition, we spotlight the latest developments shaping the future of mobility.

Read More →
New MobilityJune 5, 2026

Joshua Schank on Transportation Innovation, Risk, and the Future of Mobility

In this edition of METROspectives, Joshua Schank discusses lessons from launching LA Metro’s Office of Extraordinary Innovation, the challenges of advancing new mobility technologies, and much more.

Read More →
A maintenance person with a tablet.
ManagementJune 5, 2026

Reinventing Fleet Maintenance with Real-time Visibility and AI

Transit leaders need to know what needs fixing, where to look, who is responsible, when work is completed, and what it costs without having to chase information across disconnected systems.

Read More →
Ad Loading...
Alstom purchasing site for Acela network manufacturing
Railby StaffJune 4, 2026

Alstom Acquires Delaware Site to Support Amtrak NextGen Acela Fleet

The company is investing more than $55 million to acquire and improve the property and will employ approximately 100 people at this site once it is operational.

Read More →