Calif. VTA may extend light rail
Would add 1.6 miles of track and be implemented in two phases based on funding availability.
The Santa Clara Valley Transportation Authority (VTA) is proposing to extend the existing Mountain View to Winchester light rail line by 1.6 miles by way of the Vasona Light Rail Extension Project. The extension would begin at the existing Winchester Station in Campbell and continue within the VTA right-of-way to the Town of Los Gatos.
VTA has prepared a Supplemental Draft Environmental Impact Report/Environmental Assessment (SEIR/EA) for public review. In accordance with current state and federal environmental laws and guidelines, the Draft SEIR/EA presents design changes to the project that were previously approved in 2000 while also disclosing the environmental impacts of those design changes.
The original Vasona Corridor Project proposed light rail service from downtown San Jose through the City of Campbell to the Town of Los Gatos. The first portion, downtown San Jose to the Winchester Station in Campbell, opened for revenue service on Oct. 1, 2005, adding 5.3 miles and eight stations to VTA’s 36.9-mile light rail system.
“As the fourth major light rail extension since 1999, the line to Campbell has provided a convenient and economical travel option for West Valley residents, given VTA customers direct access to the multi-modal San Jose Diridon transit hub, and doubled light rail service along North First Street in San Jose,” said Joe Pirzynski, Town of Los Gatos council member and VTA board vice chair.
The proposed extension will be implemented in two phases based on funding availability. Project features in Phase 1 include construction of a double set of light rail tracks at the Winchester Station; expansion of parking capacity at the Winchester Station; and a new Vasona Junction Station along with a park and ride lot.
Phase 2 would construct a new Hacienda Light Rail Station with an optional park and ride lot. The cost of the project is estimated to be $175 million.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →