CTA opens rehabbed station, lauds ridership
Ridership has seen some if its sharpest increases during the tenure of Mayor Emanuel. From June 2011-June 2012, ridership rose 4.3%, about 22 million rides, compared to the same time period in 2010-2011.
The Chicago Transit Authority (CTA) opened its newly rehabilitated Morse Red Line station — one of seven stations included in the $86 million Red North Interim Improvement project and a component of Mayor Emanuel’s Building a New Chicago program, which is updating infrastructure that's critical to the city.
The Morse station was temporarily closed for six weeks to allow crews to perform approximately $11 million in repairs to the station house, adjacent retail spaces and surrounding infrastructure.
The Morse station is the second of seven stations to undergo rehabilitation and re-open as part of the Red North Interim Improvement project. Work requiring the temporary closure of the remaining five stations — Thorndale, Argyle, Berwyn, Lawrence and Jarvis — is expected to be complete by the end of 2012, with all remaining station and track work to be completed by early 2013.
At the launch, Mayor Rahm Emanuel and CTA President Forrest Claypool also announced that ridership on CTA’s bus and rail services is up over the first six months of 2012, marking 16 consecutive months of growth on the system.
Combined bus and rail ridership is up 4% for the first half of 2012 with nearly 10.5 million more rides than the same time period in 2011. The increase follows a similar ridership jump in 2011, when CTA reached the highest ridership total in 20 years — more than 532 million.
“These numbers demonstrate that a firm commitment to improving our infrastructure will help improve quality of life for all Chicagoans,” said Mayor Emanuel. “Our residents are taking the CTA now more than ever and as we improve the stations and the infrastructure of the system as a whole, these trends will continue, creating jobs throughout Chicago and improving the prospects of Chicagoans from every neighborhood.”
Ridership has seen some if its sharpest increases during the tenure of Mayor Emanuel. From June 2011-June 2012, ridership rose 4.3%, about 22 million rides, compared to the same time period in 2010-2011.
Impressively, the number of recorded rides on the rail system has seen 51 months of consecutive growth. For the first half of 2012, there were nearly 114 million rides taken on CTA trains — an increase of 6.2%.
From January-June 2012, bus ridership is 2.6% higher than the same period last year, and increase of 3.9 million rides.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →