METRO Magazine Logo
MenuMENU
SearchSEARCH

Grand River Transit expands BRT fleet with an order from New Flyer

The 39 buses have been delivered to GRT, with the remaining 9 BRT buses scheduled for delivery in 2018.

December 21, 2017
Grand River Transit expands BRT fleet with an order from New Flyer

 

1 min to read


New Flyer Industries Canada ULC announced that Grand River Transit (GRT) has awarded New Flyer with a contract for 39 Xcelsior® clean diesel 40-foot, heavy-duty transit buses, and nine Xcelsior® clean diesel 40-foot, bus rapid transit (BR) style heavy-duty transit buses. The order, which incorporated nine new BRT-style buses, converted 39 buses from the option backlog to the firm order backlog.

The purchase, supporting scheduled vehicle replacement, also supports the construction and expansion of GRT’s rapid transit network consisting of ION (which means “going” in Greek) light rail and ION bus rapid transit. Public Transit Infrastructure Funds were used to support the purchase. The 39 buses have been delivered to GRT, with the remaining 9 BRT buses scheduled for delivery in 2018.

Ad Loading...

Formed in 2000, Grand River Transit provides transit service in Kitchener, Waterloo, Cambridge, Elmira, St. Jacobs and New Hamburg, operating conventional buses, an express bus network, busPLUS service for community routes, and door-to-door transit service for riders with disabilities using specialized vehicles. It operates 70 routes covering more than 16 million kilometres and supporting a ridership of nearly 20 million each year.

More Bus

Cover Photo for Bus Tech Talk
ManagementApril 9, 2026

Bus Tech Talk: AC Transit’s Cecil Blandon on Leadership, Mentorship, and a Career in Transit

In Part 1, Blandon shares his journey from the U.S. Marines to a leadership role in public transit, along with insights on mentorship and professional growth within the industry.

Read More →
A blurry TransLink R2 rapid bus
Managementby StaffApril 8, 2026

Vancouver's TransLink Fast-Tracks RapidBus Line to Metrotown

Funded through the 2025 Investment Plan, the new R2 Marine–Willingdon RapidBus is expected to begin service in September, more than three months ahead of schedule.

Read More →
Complete Parts logo
Busby StaffApril 1, 2026

Complete Coach Works Unveils Reimagined Parts Department with Expanded Capabilities

Complete Parts features new branding with a new logo, a new contact telephone number, a dedicated order desk, enhanced processes and inventory, all designed to provide the parts bus operations need.  

Read More →
Ad Loading...
frontrunner bus
SponsoredApril 1, 2026

Breaking Accessibility Barriers with the Low Floor Frontrunner Minibus

Accessible transit isn’t a feature—it’s a responsibility. This whitepaper explores how the Low-Floor Frontrunner is redefining mobility with a breakthrough design that removes barriers, empowers riders, and delivers measurable operational advantages for agencies. Discover why this next generation minibus is setting a new standard for inclusive transportation.

Read More →
A shot of ENC's manufacturing facility
Busby StaffMarch 31, 2026

ENC Named 'Partner of Choice' to Support Philadelphia SEPTA’s $43M FTA Grant

SEPTA was awarded $43 million in competitive grant funding from the FTA's FY25 Low and No Emission and Bus and Bus Facilities grant programs to support this procurement.

Read More →
Cover photo for Bus Tech Talk with Cecil Blandon
Managementby Alex RomanMarch 27, 2026

AC Transit’s Cecil Blandon on Leadership, Mentorship, and a Career in Transit

In part 1 of a two-part conversation, AC Transit’s director of maintenance joins co-hosts Alex Roman and Mark Hollenbeck to discuss his journey from the U.S. Marines to public transit and the role mentorship plays in developing the next generation of industry leaders.

Read More →
Ad Loading...
An MBTA bus with a passenger boarding at shelter.
Busby StaffMarch 27, 2026

MBTA Confirms Funding for Upgraded Arborway Bus Facility

When construction is complete, battery-electric buses will operate from the Arborway facility on Day One, providing cleaner, quieter, and more reliable service for riders, the MBTA said. After completion, the old facility will be demolished, and the land will be made available for redevelopment.

Read More →
Nadine S. Lee
Managementby StaffMarch 26, 2026

DART's President/CEO Announces Departure from Agency

Nadine S. Lee, who has served as president/CEO since July 2021, said the decision comes after careful reflection on the agency’s progress and its path forward.

Read More →
Assemblywoman Castillo and ENC officials at California facility.
Busby StaffMarch 23, 2026

ENC Hosts California Assemblywoman, Celebrates American Manufacturing and Economic Growth

The visit underscored ENC's role as a major employer in Assembly District 58 and its commitment to American manufacturing and skilled local jobs.

Read More →
Ad Loading...
Cover of METROspectives episode with The Bus Coalition
BusMarch 20, 2026

Inside The Bus Coalition’s Push for Stronger Federal Transit Investment

In this conversation, TBC’s Executive Director Ed Redfern, President Corey Aldridge, and Washington Representative Joel Rubin outline the coalition’s key policy priorities, the challenges facing transit agencies, and how industry stakeholders can work together to strengthen the voice of bus transit at the federal level.

Read More →