METRO Magazine Logo
MenuMENU
SearchSEARCH

Honolulu begins train maintenance facility construction

Along with the train system control center, the facility will house a maintenance building for track inspection and repairs; a train vehicle wash facility; and train wheel repair center.

August 8, 2012
1 min to read


Construction begins this week on the Honolulu rail transit system's train Maintenance and Storage Facility (MSF) in Waipahu, the Honolulu Authority for Rapid Transportation (HART) announced.

The train maintenance facility will be located on a 43-acre site off Farrington Highway between Leeward Community College and Waipahu High School. The site will also house the train control center that will operate the 20-mile elevated rail system from East Kapolei to Ala Moana.

Ad Loading...

"This facility will house the 'brains and trains' of the rail system in which the driverless trains and other rail operations will be controlled from this location," HART CEO/Executive Director Dan Grabauskas said. "This latest construction under way shows the rail project continues moving forward and is on the right track."

Along with the train system control center, the facility will house a maintenance building for track inspection and repairs; a train vehicle wash facility; and train wheel repair center.

The facility will be environmentally-friendly and meet Leadership in Energy and Environmental Design (LEED) Silver Certification, with sustainable features including natural lighting and ventilation in buildings; use of recycled construction materials wherever possible; and water-efficient landscaping.

Kiewit/Kobayashi, a joint venture, was awarded the $195 million contract in 2010 to design and build the facility.

More Rail

Railby StaffFebruary 2, 2026

Chicago Region Transit Ridership Grows in 2025

The region’s fixed-route system finished out the year with a total of 373.5 million rides. Adding 12.3 million rides over 2024 represents an increase that is equal to the annual transit ridership of Kansas City.

Read More →
Managementby StaffJanuary 29, 2026

Valley Metro Sees Strong Ridership Growth in 2025

The agency ranked top five among mid-sized U.S. transit systems, defined as agencies with 15 million to 50 million annual trips.

Read More →
Busby StaffJanuary 29, 2026

Subway Customer Satisfaction Reaches Record High, New York MTA Says

The subway system saw increases across all key metrics, with 62% of subway riders reporting they feel satisfied with the system overall.

Read More →
Ad Loading...
Managementby StaffJanuary 27, 2026

Keolis Retains Virginia Railway Express Contract

The new contract for Keolis and VRE will commence in July 2026, with the potential to expand to 15 years.

Read More →
Busby StaffJanuary 27, 2026

California's OCTA Advances 2026 Initiatives Centered on Balance and Sustainability

The priorities are outlined in the 2026 Board and CEO Initiatives and Action Plan, which serves as a roadmap to guide the agency’s work throughout the year and ensure continued progress and accountability on voter-approved transportation investments and essential mobility services.

Read More →
Railby Staff and News ReportsJanuary 26, 2026

People Movement: Virginia's DRPT Names New Director and More

In this edition, we cover recent appointments and announcements at HDR, MCTS, and more, showcasing the individuals helping to shape the future of transportation.

Read More →
Ad Loading...
ManagementJanuary 23, 2026

Seattle Sound Transit Sets Launch Date for Crosslake Connection

This final component of the 2 Line will cross Lake Washington and connect with the 1 Line at International District/Chinatown Station, creating a fully integrated regional light rail system.

Read More →
A blue and white graphic with a map of the proposed study area for the Sepulveda Transit Corridor and text reading "LA Metro Approves Underground Rail for Sepulveda Transit Corridor."
RailJanuary 23, 2026

LA Metro Approves Underground Rail for Sepulveda Transit Corridor

The agency’s selection aims to slash travel times from the San Fernando Valley to the Westside to under 20 minutes.

Read More →
TechnologyJanuary 21, 2026

Florida's Tri-Rail Taps Siemens Mobility for Modern Locomotive Procurement

Expected to enter service in 2029, these locomotives support the agency’s commitment to offer reliable and efficient rail transportation across South Florida.

Read More →
Ad Loading...
Rendering of an Austin Light Rail station.
RailJanuary 20, 2026

Austin Transit Partnership Advances Federal Funding Process for Light Rail Project

See how the agency’s transit project completed a Final Environmental Impact Statement within the federal two-year guideline.

Read More →