METRO Magazine Logo
MenuMENU
SearchSEARCH

LIRR safety fixes 'virtually eliminated' motorists turning onto tracks

The FRA recommends other railroads review program, which uses flexible delineators at railroad crossings and enhanced GPS alerts.

November 27, 2019
LIRR safety fixes 'virtually eliminated' motorists turning onto tracks

The FRA is recommending other railroads across the country review research on the LIRR program and consider making similar upgrades at problematic areas.

Adam E. Moreira

2 min to read


The FRA is recommending other railroads across the country review research on the LIRR program and consider making similar upgrades at problematic areas. Adam E. Moreira

The Federal Railroad Administration (FRA) recognized the MTA’s Long Island Rail Road (LIRR) for a nation-leading program that dramatically improved railroad safety using flexible delineators at railroad crossings and enhanced GPS alerts. The delineators and a partnership with Google/Waze have in their first year virtually eliminated the problem of motorists inadvertently turning onto tracks, which until last year had been happening with increased frequency — 21 times a year.

The FRA is recommending other railroads across the country review research on the LIRR program and consider making similar upgrades at problematic areas.

Ad Loading...

In June 2018 as part of the LIRR Forward initiative, the railroad installed flexible, four-foot high reflective delineators, as well as extended roadway markings and additional reflective devices to better alert drivers, who may become confused by GPS directions while driving in darkness or inclement weather, that they should not make a turn onto the tracks. To further those safety efforts, the LIRR began a groundbreaking partnership with the GPS navigation app Waze, with a first-of-its-kind feature to debut on the app alerting motorists that they are approaching a grade crossing.

At the time, the LIRR had 296 grade crossings throughout system where the safety markers were installed. Since that time, two grade crossings, one at Urban Ave. in New Cassel and one at Covert Ave. in New Hyde Park, have been removed as part of the LIRR Expansion Project, which includes the elimination of six more LIRR grade crossings.

Last month, the Volpe National Transportation Systems Center included the LIRR’s implementation of delineators, road striping, and reflective markings at grade crossings as part of their published research for the FRA into grade crossing right-of-way incursion treatments. To view the report, click here.

Volpe compared delays, reports of cars on tracks entering through the grade crossing due to mistakenly turning onto the tracks, and actual collisions with trains for a period one year before, June 2017 through May 2018 and one year after the installations, June 2018 through May 2019. The study concluded that there was an 85% reduction in vehicles mistakenly turning onto the track at LIRR grade crossings. The study also points to an 86% reduction in the number of trains delayed due to reports of vehicles on tracks.

More Rail

Railby StaffFebruary 2, 2026

Chicago Region Transit Ridership Grows in 2025

The region’s fixed-route system finished out the year with a total of 373.5 million rides. Adding 12.3 million rides over 2024 represents an increase that is equal to the annual transit ridership of Kansas City.

Read More →
Managementby StaffJanuary 29, 2026

Valley Metro Sees Strong Ridership Growth in 2025

The agency ranked top five among mid-sized U.S. transit systems, defined as agencies with 15 million to 50 million annual trips.

Read More →
Busby StaffJanuary 29, 2026

Subway Customer Satisfaction Reaches Record High, New York MTA Says

The subway system saw increases across all key metrics, with 62% of subway riders reporting they feel satisfied with the system overall.

Read More →
Ad Loading...
Managementby StaffJanuary 27, 2026

Keolis Retains Virginia Railway Express Contract

The new contract for Keolis and VRE will commence in July 2026, with the potential to expand to 15 years.

Read More →
Busby StaffJanuary 27, 2026

California's OCTA Advances 2026 Initiatives Centered on Balance and Sustainability

The priorities are outlined in the 2026 Board and CEO Initiatives and Action Plan, which serves as a roadmap to guide the agency’s work throughout the year and ensure continued progress and accountability on voter-approved transportation investments and essential mobility services.

Read More →
Railby Staff and News ReportsJanuary 26, 2026

People Movement: Virginia's DRPT Names New Director and More

In this edition, we cover recent appointments and announcements at HDR, MCTS, and more, showcasing the individuals helping to shape the future of transportation.

Read More →
Ad Loading...
ManagementJanuary 23, 2026

Seattle Sound Transit Sets Launch Date for Crosslake Connection

This final component of the 2 Line will cross Lake Washington and connect with the 1 Line at International District/Chinatown Station, creating a fully integrated regional light rail system.

Read More →
A blue and white graphic with a map of the proposed study area for the Sepulveda Transit Corridor and text reading "LA Metro Approves Underground Rail for Sepulveda Transit Corridor."
RailJanuary 23, 2026

LA Metro Approves Underground Rail for Sepulveda Transit Corridor

The agency’s selection aims to slash travel times from the San Fernando Valley to the Westside to under 20 minutes.

Read More →
TechnologyJanuary 21, 2026

Florida's Tri-Rail Taps Siemens Mobility for Modern Locomotive Procurement

Expected to enter service in 2029, these locomotives support the agency’s commitment to offer reliable and efficient rail transportation across South Florida.

Read More →
Ad Loading...
Rendering of an Austin Light Rail station.
RailJanuary 20, 2026

Austin Transit Partnership Advances Federal Funding Process for Light Rail Project

See how the agency’s transit project completed a Final Environmental Impact Statement within the federal two-year guideline.

Read More →