METRO Magazine Logo
MenuMENU
SearchSEARCH

NJ Transit unveils new rail safety system

The “Another Train Coming” rail safety device is designed to enhance pedestrian safety around the tracks. The warning system consists of active signs in all four quadrants of the rail crossing, with an LED text message that reads, “DANGER, Another Train Coming,” as well as an audio component that repeatedly sounds the message.

September 26, 2012
3 min to read


NJ Transit unveiled its new rail safety device, “Another Train Coming,” which is designed to enhance pedestrian safety around the tracks. The installation is part of an ongoing effort to ramp up rail safety across the state through recommendations from the agency's rail safety committee.

The New Jersey Department of Transportation (NJDOT) and NJ Transit recently installed the “Another Train Coming” warning system at the Outwater Lane grade crossing, adjacent to the Plauderville rail station.

The system consists of active signs in all four quadrants of the rail crossing, with an LED text message that reads, “DANGER, Another Train Coming,” as well as an audio component that repeatedly sounds the same message. The “Another Train Coming” warning system is activated whenever two trains are in the immediate vicinity of the crossing. For example, if one train is already in the station, and another is approaching on the other track (out of view), the system will provide a warning to pedestrians who might consider crossing the tracks illegally with the gates in the down position.

The system reinforces the fact that just because one train is leaving the station does not mean it is “safe” to walk around the downed crossing gates. The system is designed to provide an additional warning to pedestrians to remain behind the crossing gates even after the one train they may be aware of has left the station.

NJDOT and NJ Transit implemented the “Another Train Coming” warning system as part of a pilot program recommended by the NJ Safety at Railroad Crossings Leadership Oversight Committee, comprised of representatives from the Federal Railroad Administration, Federal Highway Administration, National Highway Traffic Safety Administration, NJ Department of Education, State Police, Motor Vehicle Commission and NJ Division of Highway Traffic Safety, NJ Transit Police, NJDOT, NJ Transit and Operation Lifesaver. 

Ad Loading...

Transportation Commissioner and NJ Transit Board Chairman James Simpson convened the committee in the wake of two separate incidents in October 2011 that claimed the lives of three teenagers on NJ Transit tracks.   

At the direction of Commissioner Simpson, the committee was tasked with developing strategies in the areas of Engineering, Enforcement and Education in order to ramp up safety across the state’s rail network, particularly in areas where trains travel through densely populated neighborhoods, with the goal of reducing overall fatalities and accidents at railroad grade crossings.

NJDOT and NJ Transit are conducting the “Another Train Coming” pilot program at Plauderville Station to test the effectiveness of the signs and determine whether this type of system may be used on other grade crossings in its rail system. The Volpe Center, part of the U.S. Department of Transportation, is participating in the evaluation and analysis of the warning sign’s effectiveness under an agreement with the FRA.

In addition to the “Another Train Coming” signs, NJDOT and NJ Transit made several other enhancements to the Outwater Lane grade crossing, including an additional pedestrian gate, a delineated sidewalk and 300 feet of additional fencing along the railroad right of way.

More Rail

Caltrain trains on tracks
Railby StaffMarch 6, 2026

Caltrain Adopts Corridor-Wide Right-of-Way Safety Strategy

Caltrain and its partners have implemented safety improvements at specific locations in response to known risk conditions, operational needs, and available funding since the agency’s founding.

Read More →
A photo of rail tracks in Ottawa, Canada

Building a National Framework for Transit Safety and Consistency

On a recent episode of METROspectives, METRO Magazine’s Executive Editor Alex Roman sat down with Ana-Maria Tomlinson, Director of Strategic & Cross-Sector Programs at the CSA Group, to explore a bold initiative aimed at addressing those challenges: the development of a National Code for Transit and Passenger Rail Systems in Canada.

Read More →
Stairs in a New York rail station with text reading "USDOT Invests $686 Million to Modernize Aging Rail Stations."
Railby StaffMarch 2, 2026

FTA Invests $686M to Modernize Aging Rail Stations

Competitive FTA grants will support accessibility upgrades, family-friendly improvements, and cost-efficient capital projects at some of the nation’s oldest and busiest transit hubs.

Read More →
Ad Loading...
A purple MBTA train at a Mansfield Station platform.
Railby StaffFebruary 27, 2026

MBTA Updates Rail Modernization Plan to Expand Reliability and Accessibility

The strategy outlines near- and long-term upgrades to ease congestion, support housing growth, and advance statewide climate goals.

Read More →
LA Metro underground station with vehicle
Railby StaffFebruary 27, 2026

LA Metro Sets D Line Subway Extension Launch Date

The 3.92-mile addition will soon take riders west beyond its current Wilshire and Western station in Koreatown, continuing under Wilshire Boulevard through neighborhoods and communities including Hancock Park, Windsor Square, the Fairfax District, and Carthay Circle into Beverly Hills.

Read More →
MBTA railcars
Railby StaffFebruary 26, 2026

Boston's MBTA Marks Progress in Regional Rail Modernization

The procurement advances the agency's broader efforts to modernize its rail fleet and position Regional Rail for long-term improvement.

Read More →
Ad Loading...
An Amtrak Acela
Railby StaffFebruary 26, 2026

Amtrak Sets New Course for Long-Distance Fleet Renewal

Under the plan, all long-distance routes will transition to a universal single-level fleet, replacing today’s mix of bi-level and single-level equipment.

Read More →
A TriMet MAX Light Rail vehicle overhead shot
Railby StaffFebruary 24, 2026

STV Finalizes Design for First Phase of TriMet MAX Blue Line Substation Upgrades

The milestone is a significant step toward modernizing the MAX Blue Line’s power infrastructure, one of the oldest components of the region’s light rail system.

Read More →
HDR rendering of LA to Coachella Valley Rail Project
Railby StaffFebruary 20, 2026

HDR Selected to Advance LA–Coachella Valley Rail Corridor Project

The firm will lead the Tier 2 environmental review program for the Coachella Valley Rail Corridor, including the conceptual and preliminary engineering needed to develop project-level environmental clearance.

Read More →
Ad Loading...
Rendering of Austin Transit Partnership's light rail line.
Railby StaffFebruary 19, 2026

Contractor Chosen to Help Build Austin Light Rail

The ATP board’s approval of ARC enables ATP to begin pre-construction activities and advance final design for Austin Light Rail under the first phase of what will be a multibillion-dollar contract.

Read More →