METRO Magazine Logo
MenuMENU
SearchSEARCH

NTSB releases Disney monorail accident info

At about 2 a.m. on July 5th, a Walt Disney World monorail train, designated the Pink train, backed into another monorail train, designated the Purple train, near the Ticket and Transportation Center monorail station. The operator of the Purple train was fatally injured; the six passengers on that train were treated at the scene.

July 9, 2009
2 min to read


The National Transportation Safety Board (NTSB) developed the following factual information from its investigation of the collision of two trains on the monorail system at Walt Disney World in Lake Buena Vista, Florida, that occurred early Sunday morning:

At about 2 a.m. on July 5th, a Walt Disney World monorail train, designated the Pink train, backed into another monorail train, designated the Purple train, near the Ticket and Transportation Center (TTC) monorail station. The operator of the Purple train was fatally injured; the six passengers on that train were treated at the scene. The operator of the Pink train, who was transported to the hospital, treated and released, was the only one aboard that train at the time of the collision.

Ad Loading...

Prior to the accident, the Pink train had been instructed to detrain all passengers at the TTC station and then to operate without passengers past the station and a switch to a point where the train could be backed through the track switch from the Epcot loop over to the Magic Kingdom loop. The operator of the Pink train moved the train past the track switch and stopped.

The Pink train was then instructed to back through the track switch, towards the Magic Kingdom loop. At about the same time, the Purple train, which was inbound to the TTC station, was instructed to stop at the station to detrain passengers. For undetermined reasons that are currently under investigation, the switch had not changed position needed to allow the Pink train to be routed to the Magic Kingdom loop, which resulted in the Pink train backing down the same track it had just come from, putting it on a collision course with the Purple train. The Pink train passed through the TTC station and struck the Purple train while it was outside the station.

There are indications that the operator of the Purple train had brought the train to a stop and had attempted to put the train in reverse prior to the collision. To this point in the investigation, no anomalies or malfunctions have been found with the automatic train stop system or with any mechanical components of the switch or with either of the trains.

The on-scene phase of the investigation is expected to continue for several days.

The parties to the investigation are Walt Disney World, the Occupational Safety and Health Administration, the Orange County (Fla.) Sherriff's Office, and the Transportation and Communications International Union.

 

More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →