METRO Magazine Logo
MenuMENU
SearchSEARCH

San Diego transit rolls out Siemens trolleys, station upgrades

The low-floor cars, which cost $233 million, are part of the $620 million Trolley Renewal Project made possible by a combination of TransNet, state and federal dollars. Blue and Orange Line stations are being reconstructed to raise platforms and add modern amenities for passengers, including next arrival signage and new shelters.

September 30, 2011
2 min to read


The San Diego Metropolitan Transit System (MTS) received the first six of a 57-vehicle order of the new trolleys. On Oct. 3, two of these cars will begin service on the Green Line with the first trip out of Old Town to Santee at 5 a.m. By 2014 the new fleet will operate on the Blue Line in Downtown and South Bay and on the Orange Line in East County.

The low-floor cars, which cost $233 million, are part of the $620 million Trolley Renewal Project made possible by a combination of TransNet, state and federal dollars.

The 57 new low-floor cars are replacing older vehicles that have operated on the trolley since the 1980s. The new cars were manufactured in Sacramento by Siemens. The shorter vehicle length is one of the primary differences between these vehicles and the 11 low-floor cars MTS already operates. The newer, shorter cars will allow three-car trains to operate in downtown without encroaching on pedestrian crosswalks. A new seat configuration provides the same capacity as the longer vehicles.

To make all the trolley stations compatible for low-floor trolleys, Blue and Orange Line stations are being reconstructed to raise platforms and add modern amenities for passengers, including next arrival signage and new shelters.

“These new cars – and the overall renewal of the trolley system – are part of a larger vision for the future of transportation in the region,” said Imperial Beach Mayor Jim Janney, second vice chair of the San Diego Association of Governments. “Our plans call for continuing to expand the trolley system, introducing bus rapid transit throughout the region, and creating multimodal transportation corridors to give travelers more choices.”

Trolley Renewal construction at downtown stations has begun. In mid-October, work to replace overhead electrical wire, platforms, and tracks, is expected to start at other downtown and near downtown stations, impacting Trolley service.

More Rail

A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →
Ray Melleady and industry leaders on Capitol Hill
Managementby Alex RomanAugust 24, 2026

The Business Voice Behind Public Transportation

As chair of APTA’s Business Members Board of Governors, Ray Melleady explains how more than 850 business members are partnering with transit agencies to advance funding, innovation, and industry-wide collaboration.

Read More →
An Amtrak Cascades Airo Trainset at a station.
Railby Alex RomanAugust 14, 2026

FRA Announces $5.3B in Rail Investments, Including $2B for Amtrak

Funding will support grade-crossing improvements, infrastructure upgrades, and new Amtrak equipment in 23 states.

Read More →
Ad Loading...
Finding the Right Balance: Optimizing Transit Maintenance
ManagementAugust 14, 2026

Finding the ‘Happy Medium’: Optimizing Maintenance Without Sacrificing Reliability

The key to maintenance optimization isn’t doing less work—it’s doing the right work at the right time on the right assets.

Read More →