METRO Magazine Logo
MenuMENU
SearchSEARCH

SFMTA Issues RFQ for Next Phase of Mixed-Use Bus Yard

The first-in-the-nation mixed-use bus yard will not only store and maintain 213 buses, increasing capacity by approximately 50%, it will also include up to 575 rental units of housing with an initial affordability target of 50%.

by METRO Staff
August 24, 2020
SFMTA Issues RFQ for Next Phase of Mixed-Use Bus Yard

The innovative project will replace the obsolete bus facility and yard with a modern, three-story bus maintenance and storage garage, equipped to serve the SFMTA’s fleet as it grows and transitions to battery-electric vehicles.

Credit:

SFMTA

2 min to read


The San Francisco Municipal Transportation Agency (SFMTA) released the Request for Qualifications (RFQ) for the Potrero Yard Modernization Project — an innovative project that will replace the obsolete bus facility and yard with a modern, three-story bus maintenance and storage garage, equipped to serve the SFMTA’s fleet as it grows and transitions to battery-electric vehicles.

It will also enable more efficient trolley bus maintenance, enhance the agency’s resilience to climate change and natural disasters, and ensure that SFMTA staff are able to perform their work with enhanced safety and efficiency measures.

Ad Loading...

“Potrero Yard is our second oldest bus yard in the Muni system and prior to Covid-19 carried 14% of our total ridership,” said Director of Transportation Jeffrey Tumlin. “Rebuilding the yard is not only important for keeping our buses running now and into the future, but also for realizing an incredible opportunity to support the city’s housing and affordable housing goals above the yard.”

The first-in-the-nation mixed-use bus yard will not only store and maintain 213 buses, increasing capacity by approximately 50%, it will also include up to 575 rental units of housing with an initial affordability target of 50%. The city’s commitment to addressing a citywide shortage of affordable housing means this project also challenges potential developers to seek additional funds to maximize the affordability percentage, even up to 100% affordable.

The facility will include the following features:

  • LEED Gold Certification

  • Built to an elevated structural and seismic standard

  • Infrastructure for battery-electric buses

  • Centralized location for Street Operations — Muni’s “first responders”

  • Centralized, modern space for Muni operator training

  • Ground floor active uses on Bryant and possibly 17th streets

The RFQ initiates the process to select a developer partner to design and build the project. The RFQ process will evaluate the qualifications of proposed project teams and determine up to three top responders based on an evaluation of relevant experience and qualifications. The top responders will then be invited to submit a full proposal through a subsequent Request for Proposals (RFP) process that will be issued in early 2021. The city strongly encourages all potential respondents to elevate the participation and contribution of Black, Indigenous, and People of Color (BIPOC) and underrepresented voices as teams are formed. Respondent teams should reflect the racial and ethnic diversity of San Francisco and participation of underrepresented communities.

More Bus

A picture of a San Diego MTS railcar and bus at a transit station.
Managementby StaffApril 17, 2026

San Diego Transit Agencies Propose Fare Hike to Close Budget Gaps

The agencies, San Diego MTS and NCTD - San Diego Railroad, which share a fare system (PRONTO), proposed the changes to help address their respective financial sustainability strategies.

Read More →
A Fresno Area Express bus refurbished by Complete Coach Works.
Busby StaffApril 17, 2026

Complete Coach Works Completes 11 CNG Bus Refurbishment Project for Fresno Area Express

The project was awarded under the Washington State Contract, enabling FAX to streamline its procurement processes while ensuring value and quality from an experienced transit solutions provider, said officials.

Read More →
A MARTA 60-foot articulated bus.
Busby StaffApril 16, 2026

MARTA Set to Launch Next Gen Bus Network

The historic initiative represents the first time since MARTA began bus operations in the early 1970s that the entire system has been redrawn from scratch.

Read More →
Ad Loading...
A Coach USA Van Hool CX 45 delivered by ABC Companies.
Busby StaffApril 15, 2026

ABC Delivers Van Hools to Coach USA and More in Biz Briefs

In METRO's latest installment, we take a look at the latest news from suppliers including Moovit, CAF, and more.

Read More →
A headshot of Inez Evans Benson
Busby Alex RomanApril 15, 2026

Inez Evans Benson on Rethinking Transit Through Customer Experience

The WSP leader discusses why agencies must look beyond satisfaction metrics and take a more holistic, community-driven approach to service.

Read More →
FlixBus vehicles in a parking garage.
ManagementApril 13, 2026

Intercity Bus Industry Outlook: A Mix of Apprehension & Optimism

Industry leaders see both promise and peril ahead as intercity bus travel rebounds, but unpredictable market forces threaten to reshape the sector.

Read More →
Ad Loading...
Cover Photo for Bus Tech Talk
ManagementApril 9, 2026

Bus Tech Talk: AC Transit’s Cecil Blandon on Leadership, Mentorship, and a Career in Transit

In Part 1, Blandon shares his journey from the U.S. Marines to a leadership role in public transit, along with insights on mentorship and professional growth within the industry.

Read More →
A blurry TransLink R2 rapid bus
Managementby StaffApril 8, 2026

Vancouver's TransLink Fast-Tracks RapidBus Line to Metrotown

Funded through the 2025 Investment Plan, the new R2 Marine–Willingdon RapidBus is expected to begin service in September, more than three months ahead of schedule.

Read More →
Complete Parts logo
Busby StaffApril 1, 2026

Complete Coach Works Unveils Reimagined Parts Department with Expanded Capabilities

Complete Parts features new branding with a new logo, a new contact telephone number, a dedicated order desk, enhanced processes and inventory, all designed to provide the parts bus operations need.  

Read More →
Ad Loading...
frontrunner bus
SponsoredApril 1, 2026

Breaking Accessibility Barriers with the Low Floor Frontrunner Minibus

Accessible transit isn’t a feature—it’s a responsibility. This whitepaper explores how the Low-Floor Frontrunner is redefining mobility with a breakthrough design that removes barriers, empowers riders, and delivers measurable operational advantages for agencies. Discover why this next generation minibus is setting a new standard for inclusive transportation.

Read More →