Siemens has presented its new Inspiro type metro vehicle for the world's biggest mass transit project in the Saudi Arabian city of Riyadh, which includes six lines and a total route length of approximately 108 miles.
The Siemens order includes the metro trains, electrification system, and signaling and communication equipment for driverless operation on Lines 1 and 2. Siemens was awarded the order in 2013 by the High Commission for Urban Development.
Ad Loading...
"Our project teams in Vienna and Saudi Arabia poured all their heart and soul into the development and completion of the first train which is specially equipped for the extreme climatic conditions in Riyadh. So we are especially proud to be the first of the three consortia to present our vehicle to the public," says Jochen Eickholt, CEO of Siemens Mobility.
The first train is currently being tested for extreme conditions in the climatic wind tunnel at Rail Tec Arsenal in Vienna. In spring 2016, dynamic testing will commence at the Siemens Test and Validation Center in Wildenrath, Germany.
Siemens is to supply 74 Inspiro type metro trains. These trains with their all-aluminum car bodies are designed to run on standard-gauge track at a top speed of about 55 miles per hour. The two- and four-car train configurations have been designed with the region's climate in mind. One such feature is a more powerful air conditioning system, capable of delivering sufficient cooling capacity even in extreme heat. In addition, the bogies, traction drive, brakes and doors have been fitted with special elements in order to prevent the ingress of sand.
Siemens is also responsible for integration of the railway systems on these two lines. This investment in the city's infrastructure is meant to alleviate the local traffic problems. A fast growing city, the population of Riyadh has doubled to more than six million people since 1990.
Amtrak will open grant applications March 23 for community projects near the Frederick Douglass Tunnel alignment in Baltimore as part of a $50 million investment tied to the B&P Tunnel Replacement Program.
The Denmark Station $2.3 million construction investment project includes a new 280-foot concrete boarding platform, built eight inches above the top of rail, for improved accessibility for passengers with disabilities and families with small children and much more.
Caltrain and its partners have implemented safety improvements at specific locations in response to known risk conditions, operational needs, and available funding since the agency’s founding.
On a recent episode of METROspectives, METRO Magazine’s Executive Editor Alex Roman sat down with Ana-Maria Tomlinson, Director of Strategic & Cross-Sector Programs at the CSA Group, to explore a bold initiative aimed at addressing those challenges: the development of a National Code for Transit and Passenger Rail Systems in Canada.
Competitive FTA grants will support accessibility upgrades, family-friendly improvements, and cost-efficient capital projects at some of the nation’s oldest and busiest transit hubs.
The 3.92-mile addition will soon take riders west beyond its current Wilshire and Western station in Koreatown, continuing under Wilshire Boulevard through neighborhoods and communities including Hancock Park, Windsor Square, the Fairfax District, and Carthay Circle into Beverly Hills.
Under the plan, all long-distance routes will transition to a universal single-level fleet, replacing today’s mix of bi-level and single-level equipment.