METRO Magazine Logo
MenuMENU
SearchSEARCH

Cleveland RTA unveils new Little Italy-University Circle Station

The new $17.5 million Red Line station, which replaces an old and functionally obsolete facility, is RTA’s first new Red Line station in 46 years.

August 12, 2015
Cleveland RTA unveils new Little Italy-University Circle Station

Photo: GCRTA

3 min to read


Photo: GCRTA

The Greater Cleveland Regional Transit Authority (RTA) unveiled its new $17.5 million Little Italy-University Circle Station during a ribbon-cutting ceremony on August 11.

The new Red Line station, located on Mayfield Road at East 119th Street, replaces an old and functionally obsolete facility at Euclid Avenue and East 120th Street – about 0.3 miles away. This is RTA’s first new Red Line station in 46 years.

The opening came just in time for the more than 100,000 visitors who attended the annual Feast of the Assumption Festival in the historic Little Italy neighborhood Aug. 13-17.

Ad Loading...
Rendering courtesy: GCRTA

“The impact of this new rail station on the neighborhood has been large, positive and immediate. Located in the heart of Little Italy, the station significantly alleviated a long-term major parking issue, and attracted even more people to this great annual event,” said RTA CEO/GM Joe Calabrese.

Although there is no designated parking at the station, it is an easy walk to residential areas, merchants and restaurants located in this historic neighborhood. A growing housing market is nearby for professionals who live in University Circle, as well as the flourishing Uptown development, which stretches along Euclid Avenue, between Mayfield Road and East 117th Street.

Photo: GCRTA

Talk of a new station began in 2008, when local institutions helped with a study on transit-oriented development in the area. Included were: the Cleveland Foundation, the Northeast Ohio Areawide Coordinating Agency (NOACA), Little Italy, University Hospitals, the Cleveland Clinic, Case Western Reserve University and University Circle Inc.

“The opening of the Little Italy-University Circle Red Line Station is incredibly exciting for University Circle. A connector between University Circle, Little Italy, Downtown and the Cleveland Hopkins International Airport, this new station will improve transit access to our neighborhood and is an important step towards building University Circle as a complete neighborhood,” said Chris Ronayne, president, University Circle Inc.

That neighborhood includes the Cleveland Museum of Art, Severance Hall (home of the Cleveland Orchestra), Case Western Reserve University, University Hospitals, and the nearby Cleveland Clinic.

“The Federal Transit Administration is proud to partner with the RTA to bring a new transit station to this vibrant neighborhood,” said Therese McMillan, Acting Administrator for the FTA, which contributed $12.5 million in federal funding for the project.

“In Cleveland, and across America, investments like this one are helping to revitalize neighborhoods, spur new development and offer residents an attractive and convenient travel option for getting to work, school and other important destinations,” McMillan said.

The station includes:

  • A single platform headhouse and entrance plaza that are ADA-accessible.

Ad Loading...
  • A heavy-duty elevator and stairway from the street level to the platform and waiting areas.

  • New concrete sidewalks, landscaping, lighting and bridge abutment repairs.

  • Rehabilitation of two transit track bridges.

  • Reuse of old vault under the railroad bridges as the lobby area. The vault was built in the 1920s as a potential commuter rail station by the Van Sweringen brothers, who built the Terminal Tower and the Shaker Rapid.

  • Artistic lighting of the bridges lead  ing to the station.

Ad Loading...
  • Installation of a terrazzo flooring with a leaf pattern design by local artist Susie Frazier.

  • Chandelier sculpture elements in the headhouse designed by artist Jennifer Cecere.

  • Italian poetry engraved into the lobby steps by artist Gabriella Mileti.

[Timelapse Video] From March 24-27, 2014, crews dismantled a bridge over Mayfield Road that needed to be removed to allow for construction of RTA's new Little Italy - University Circle Rapid Station. 

Construction began on the Little Italy-University Circle Station in October 2013. The station was designed by City Architecture, and the construction contractor was McTech Corp.

On hand at the ceremony were Valarie J. McCall, RTA Board Member, APTA Vice Chair,  APTA Chair of the Transit Board Members Committee, and Cleveland’s Chief of Government & International Affairs; Sony Nardi, RTA Board Member; Joe Calabrese, RTA CEO/GM; Cleveland Mayor Frank G. Jackson.

Ad Loading...

More details can be found at RTA’s Little Italy page at: http://www.riderta.com/majorprojects/littleitalyuc.

More Rail

A picture of a San Diego MTS railcar and bus at a transit station.
Managementby StaffApril 17, 2026

San Diego Transit Agencies Propose Fare Hike to Close Budget Gaps

The agencies, San Diego MTS and NCTD - San Diego Railroad, which share a fare system (PRONTO), proposed the changes to help address their respective financial sustainability strategies.

Read More →
An overhead rendering of the Austin Transit Partnership rail system.
Railby StaffApril 16, 2026

Austin Transit Partnership Names Contractor for Light Rail Operations Facility

The ATP board’s approval of the KAP team enables ATP to begin pre-construction activities, including advancing design, initiating permitting, and preparing the site for future construction.

Read More →
A Coach USA Van Hool CX 45 delivered by ABC Companies.
Busby StaffApril 15, 2026

ABC Delivers Van Hools to Coach USA and More in Biz Briefs

In METRO's latest installment, we take a look at the latest news from suppliers including Moovit, CAF, and more.

Read More →
Ad Loading...
A photo of an Amtrak train with a logo
Technologyby StaffApril 15, 2026

Amtrak Advances Plan for New Long-Distance Fleet

The railroad has issued a formal request for proposals to manufacturers for more than 800 new passenger railcars that will serve 14 long-distance routes nationwide.

Read More →
A headshot of Inez Evans Benson
Busby Alex RomanApril 15, 2026

Inez Evans Benson on Rethinking Transit Through Customer Experience

The WSP leader discusses why agencies must look beyond satisfaction metrics and take a more holistic, community-driven approach to service.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Technologyby StaffApril 14, 2026

Alstom Delivers First Multilevel III NJ TRANSIT Commuter Railcar

The delivery marks the first car in a 374‑vehicle order and begins the arrival of a new generation of higher‑capacity, more reliable, and more comfortable trains for one of the country’s busiest commuter rail systems.

Read More →
Ad Loading...
A BART train on the tracks.
Railby StaffApril 13, 2026

San Francisco's BART Breaks Multiple Records for Post-Pandemic Ridership in March

BART recorded 5,403,140 exits in March, making it the highest monthly ridership since the pandemic and surpassing the previous high set in October 2025 (5,346,890 exits).

Read More →
Ribbon cutting photo celebrating SEPTA's new Ardmore Station
Railby StaffApril 13, 2026

Philadelphia's SEPTA Celebrates New Ardmore Station

The station was rebuilt as part of SEPTA’s Station Accessibility Program, making it fully ADA accessible with new elevators, ramps, and high-level platforms.

Read More →
Two Metra locomotives on rail tracks.
Railby StaffApril 10, 2026

Metra Reaches New 10-Year Agreement with BNSF

The announcement highlights the long-standing partnership between the Class I railroad and the commuter rail system, dating back to Metra's creation in 1983.

Read More →
Ad Loading...
Ribbon cutting at Siemens' new North Carolina facility.
Railby StaffApril 9, 2026

Siemens Opens North Carolina Railcar Manufacturing Facility

Site construction is complete, production is underway, and the first locally built passenger coaches are on track for delivery in Summer 2026.

Read More →