METRO Magazine Logo
MenuMENU
SearchSEARCH

Innovative Solutions Awards: Clean Technology

CTA built one of the few terminals in North America that uniquely utilizes SAE J3105 overhead charging systems to maximize in-service time and performance of its Proterra electric bus fleet.

by Alex Roman
October 15, 2020
Innovative Solutions Awards: Clean Technology

CTA and Proterra thoughtfully planned and designed the Austin Terminal to be able to hold additional charger capacity.

Credit:

Proterra

3 min to read


With COVID-19 basically canceling the trade show and awards season, METRO Magazine decided to honor our 2020 Innovative Solutions Award winners here in print.

Now in its sixth year, the Innovative Solutions Awards honors bus operations and their supplier partners who have implemented initiatives that helped them save money, run more efficiently, streamline operations, increase safety, improve customer satisfaction, increase ridership, and more. This year, we categorized our winners into six categories: Technology, Safety, Passenger Experience, Operations, Clean Tech, and Mobility.

Ad Loading...

The Chicago Transit Authority (CTA) recently completed an innovative turnkey infrastructure project for the Austin Boulevard/Chicago Avenue Terminal (Austin Terminal). The project began mid-2019 and is now completed, with bus service beginning as soon as late-2020.

CTA built one of the few terminals in North America that uniquely utilizes SAE J3105 overhead charging systems to maximize in-service time and performance of its electric bus fleet. Thanks to the set-up of the overhead charging systems, CTA’s Proterra 40-foot electric buses could run 24 hours to meet the demands of CTA’s around-the-clock bus services. The J3105 charging systems utilize standardized technology and are compatible with other electric vehicles.

There was a tremendous amount of planning and design work behind the new Austin Terminal. The project was designed as a collaboration between Proterra and CTA, and the new Austin Terminal was built by Proterra in conjunction with Mortenson Co. The terminal houses two 450kWh Heliox overhead fast chargers, with a third charger planning to be installed later. Buses serving the heavily traveled #65 Grand and #66 Chicago routes will pull into the new terminal loop to drop off and pick up passengers, and at the same time receive a 10-minute fast charge from either of the two overhead inverted pantograph chargers. The fast charge will add enough energy for an additional 20-plus miles of range back into the battery packs. The on-route fast charging allows for a much more efficient and cost effective fueling system.

The building was also designed with expansion capabilities to allow CTA to continue to grow their electric bus fleet and flexibly install corresponding charging infrastructure to meet its needs. To do that, a concrete equipment pad, underground duct banks, and mast foundation were placed in preparation for a third overhead fast charging system. CTA and Proterra thoughtfully planned and designed the terminal to be able to hold additional charger capacity, and by incorporating it in the original design, saved costs and time compared to breaking ground on an expansion later. The terminal also had the necessary energy infrastructure upgrades to meet the demand of an electric bus fleet now and in the future. Conduit and cables were upsized to support up to 1.5 MW chargers.

Chicago presents a lot of weather-related challenges, which were taken into consideration for the planning and design of the terminal. The new terminal is a two-story hurricane proof brick building with a temperature-controlled interior. There is a weather shield surrounding the pantograph overhead chargers. Additionally, chargers are liquid cooled, and the building has forced ventilation.

Ad Loading...

“Proterra Energy, which has extensive experience managing industrial electrical projects and working with utility providers, partnered with CTA to determine the best infrastructure setup for their needs and helped manage their charger installation from start to finish,” explains officials at Proterra. “This type of collaboration and partnership can serve as a model for other transit agencies looking to electrify their transit fleets.

Subscribe to Our Newsletter

More Zero Emissions

An OCTA ZEB
Technologyby Alex RomanJuly 31, 2026

Biz Briefs: OCTA Taps Clean Energy for Hydrogen Station, Stadler to Supply Via Rail Vehicles, and More

From manufacturers and suppliers to transit agencies and motorcoach operators, these updates offer a snapshot of the projects, partnerships and business moves driving the industry forward.

Read More →
Maintenance Leadership for a Changing Industry
Managementby Alex RomanJuly 22, 2026

AC Transit’s Cecil Blandon on Building the Next Generation of Transit Maintenance Leaders

The agency’s maintenance chief discusses leadership, workforce development, zero-emission technology, and preparing technicians for the future of public transportation.

Read More →
STV Advances CTDOT Fleet Electrification
Busby Staff and News ReportsJuly 8, 2026

CTDOT Taps STV for Electric Bus Facility Design

The firm will work with CTDOT and RVT to define the facility layout, operational requirements, and long-term flexibility for RVT’s growing electric fleet.

Read More →
Ad Loading...
A group of people with confetti cannons and a Pace transit bus.
Zero Emissionsby News/Media ReleaseJune 25, 2026

Chicago’s Pace Deploys 24 Hybrid-Electric Buses in Will County

The new buses reduce emissions and fuel consumption while advancing the agency's long-term goal of transitioning to a fully zero-emission fleet.

Read More →
Shovels standing in dirt with a zero emissions bus in the background.

DASH Breaks Ground on First On-Route Electric Bus Chargers in D.C. Region

The fast-charging infrastructure will help extend electric bus range, improve fleet utilization, and support DASH's goal of transitioning to a fully zero-emission fleet.

Read More →
A Nova LFSe+ electric bus for STM
Technologyby Staff and News ReportsJune 18, 2026

Biz Briefs: Montréal Debuts Nova Electric Buses and More

In this edition of Biz Briefs, we spotlight the latest developments shaping the future of mobility.

Read More →
Ad Loading...
thumbnail for 2026 METRO Buyer’s Guide & Directory
SponsoredMay 27, 2026

2026 METRO Buyer’s Guide & Directory

Searching for the right vehicles, technology, equipment, or services for your public transit or motorcoach operation? This industry guide brings together manufacturers and suppliers from across the transportation market — all in one place. Download it to connect with the companies that help agencies and operators improve mobility, enhance operations, and move their organizations forward.

Read More →
A Heliox charger on KC Metro property

King County Test Heliox Chargers, Keolis Lands California Contract Top Biz Briefs

Stay informed with these quick takes on the projects and companies driving progress across the transportation landscape.

Read More →
ENC's Manufacturing facility
Busby Alex RomanMay 18, 2026

ENC Builds on Legacy with Major Investment, Strategic Reset

Following its 2024 acquisition, ENC is upgrading operations, expanding capacity, and aligning its approach to meet agency demand for reliability and on-time delivery. METRO spoke to John Obert, vice president of transit sales, to find out more.

Read More →
Ad Loading...
King County Metro's bus depot with Schunk Transit pantograph charging infrastructure.

Biz Briefs: King County Metro Taps Schunk Transit Systems for Charging and More

Stay informed with these quick takes on the projects and companies driving progress across the transportation landscape.

Read More →