METRO Magazine Logo
MenuMENU
SearchSEARCH

VIA Announces Milestone for Advanced Rapid Transit

In the FTA’s approval letter, the federal agency notes that VIA has committed local dollars against the project, which is estimated to be about $446.3 million.

VIA Announces Milestone for Advanced Rapid Transit

The FTA's approval is an important step for transit agencies in the federal Capital Investment Grants (CIG) Program.

Photo: VIA

3 min to read


VIA Metropolitan Transit announced it has received approval from the Federal Transit Administration (FTA) to enter into final engineering on the VIA Advanced Rapid Transit North/South Corridor Project, known as the “VIA Rapid Green Line.”

The FTA also established the maximum federal contribution at 60% of the current project, which is an increase from the original federal contribution of about 50%.

Ad Loading...

In the FTA’s approval letter, the federal agency notes that VIA has committed local dollars against the project, which is estimated to be about $446.3 million. The federal contribution will be approximately $267.8 million. 

“The FTA’s approval that allows us to enter final engineering is a pivotal next step for VIA’s plan to deliver Advanced Rapid Transit to our community,” VIA President/CEO Jeffrey C. Arndt said. “Added to that, the acknowledgment that VIA may be awarded 60% of the project dollars from the FTA is welcomed news — and a testament to the strength of our project.”

The FTA's approval is an important step for transit agencies in the federal Capital Investment Grants (CIG) Program. The required engineering work will allow VIA to reach a final funding agreement with the FTA, potentially by the end of 2024.

What Happens During VIA's Engineering Phase

During the engineering phase, the FTA will continue to evaluate VIA’s project, ensuring that the agency has the technical, legal, and financial capability to deliver the Green Line.

With the approval to enter final engineering, VIA has also won automatic pre-award authority to procure vehicles, acquire property, and perform utility relocation because the National Environmental Policy Act review process has been completed.

Ad Loading...

The project must still progress through further steps in the FTA’s CIG program to be eligible for CIG funding.

More About the Green Line

The Green Line will run from near the San Antonio International Airport/North Star Mall area along San Pedro Avenue, through Downtown, and onto Steves Avenue, near Mission Concepcion.

It will be the region’s first Advanced Rapid Transit (ART) line, constituting a new type of mass transit in San Antonio that generally runs in dedicated lanes, outside of regular traffic, and includes elements designed to reduce trip times.

That includes off-board fare collection at stations along the corridor, level platform boarding, and bus-friendly traffic signals that will keep the Green Line running even during periods of peak traffic and congestion.

ART is an element in VIA’s Keep SA Moving plan that won voter approval in 2020 to fund transit improvements. It is designed to move more people faster and farther and connect them to more opportunities for education, employment, goods, and resources.

Ad Loading...

The service is designed to improve transportation options for the nearly 54,000 residents and 108,000 jobs located within the 12-mile corridor.

More Bus

paratransit bus
SponsoredMarch 16, 2026

Measuring the True Cost of Paratransit Fleets

What truly drives the cost of a paratransit fleet? Beyond the purchase price, seven operational factors quietly determine maintenance frequency, downtime, and long-term service reliability. This whitepaper explores how these factors shape lifecycle cost and what agencies should evaluate when selecting paratransit vehicles.

Read More →
Cover photo for METROspectives with The Bus Coalition
Busby Alex RomanMarch 13, 2026

Inside The Bus Coalition’s Push for Stronger Federal Transit Investment

In this conversation, TBC’s Executive Director Ed Redfern, President Corey Aldridge, and Washington Representative Joel Rubin outline the coalition’s key policy priorities, the challenges facing transit agencies, and how industry stakeholders can work together to strengthen the voice of bus transit at the federal level.

Read More →
Cover photo for Biz Briefs dated March 6, 2026
Technologyby Staff and News ReportsMarch 6, 2026

Biz Briefs: Tolar Manufacturing Supports PSTA Spark Service and More

Stay informed with these quick takes on the projects and companies driving progress across the transportation landscape.

Read More →
Ad Loading...
Passengers boarding a PRT bus
Busby StaffMarch 2, 2026

Pittsburgh Unveils 'Bus Line Refresh' Plan

Originally introduced in 2023 as the Bus Line Redesign, the effort has evolved into a more targeted update that maintains familiar routes while improving reliability, frequency, evening and weekend service, and connections across Allegheny County.

Read More →
Stickers and a paper bus for S3 bus line
Busby StaffMarch 2, 2026

Seattle's Sound Transit Breaks Ground on S3 Bus Line

S3 will connect communities along SR 522 with fast, reliable, battery-electric bus service from Shoreline South Station to Bothell via Kenmore and Lake Forest Park. 

Read More →
PRT bus stop with articulated bus.
Busby StaffFebruary 20, 2026

Pittsburgh Regional Transit Announces All-Door Boarding on the University Line

All-door boarding will allow passengers to pay while entering the front, middle, or rear doors of the University Line’s 60-foot articulated buses.

Read More →
Ad Loading...
Patrick Scully, president at Complete Coach Works.
Managementby StaffFebruary 18, 2026

Complete Coach Works Names Patrick Scully President

He succeeds the company founder, Dale Carson, who remains chairman of the board. 

Read More →
A MARTA articulated bus.
Busby StaffFebruary 13, 2026

Atlanta's MARTA Sets Date for 'A-Line' BRT Launch

The five-mile Rapid A-Line connects Downtown Atlanta to Capitol Gateway, Summerhill, Peoplestown, and the Beltline’s Southside Trail.

Read More →
A Picture of Ster Seating's Parent/Child transit seating product.
Technologyby StaffFebruary 10, 2026

Ster Seating, Maryland Transit Launch First Parent/Child Transit Seat in North America

The configuration uses Ster Seating's Gemini seat platform to create a family-friendly floor layout specifically engineered to accommodate parents traveling with young children.

Read More →
Ad Loading...
Rendering of Sound Transit's Renton Transit Center
Busby StaffFebruary 5, 2026

Seattle’s Sound Transit Breaks Ground on New Transit Center

The Renton Transit Center project will relocate and rebuild the Renton Transit Center to better serve the regional Stride S1 line, local King County Metro services, and the future RapidRide I Line.

Read More →