METRO Magazine Logo
MenuMENU
SearchSEARCH

Siemens Launch New Siemens S700 Low-Floor Vehicles

The celebration marks a significant milestone in modernizing Sacramento’s transit system, enhancing accessibility, and improving the rider experience.

September 4, 2024
Siemens Launch New Siemens S700 Low-Floor Vehicles

The new light rail vehicles, manufactured by Siemens Mobility, feature a low-floor design that allows easier boarding for seniors, persons with disabilities, and those with strollers or bicycles.

Photo: SacRT

3 min to read


California’s Sacramento Regional Transit District (SacRT) celebrated the launch of its new fleet of S700 low-floor light rail vehicles at a community celebration and press conference.

The celebration marks a significant milestone in modernizing Sacramento’s transit system, enhancing accessibility, and improving the rider experience.

Ad Loading...

SacRT’s New Siemens Railcars

The new light rail vehicles, manufactured by Siemens Mobility, feature a low-floor design that allows easier boarding for seniors, persons with disabilities, and those with strollers or bicycles.

The first of the new S700 trains began service on the Gold Line on Sept. 1, and on the Green Line Sept. 3.

Speaking at the event, many federal, state, and local elected officials highlighted the importance of this investment for Sacramento’s future.

“This is a historic moment for SacRT and the Sacramento region,” said SacRT GM/CEO Henry Li. “The launch of our new S700 light rail vehicles reflects our dedication to delivering safe, reliable, and accessible transit options. I want to thank all our partners, elected officials, and the entire SacRT team for their commitment to making this day a reality.”

Siemens’ Role

Siemens Mobility also played a key role in the project, providing advanced technology and design for the new light rail vehicles.

Ad Loading...

“Congratulations to the entire SacRT team for their relentless efforts in making this service launch a reality,” said Michael Cahill, president, rolling stock, Siemens Mobility North America. “Built by Siemens Mobility and our team of more than 2,400 in Sacramento, these trains and the connection they bring are a gateway to a future where transportation is seamlessly connected, and where our city can thrive.”

Key Features of the S700 Light Rail Vehicles:

  • One train car can fit up to 187 people sitting and standing.

  • At-platform boarding and easy access for all riders.

  • Allows for riders in mobility devices to board using deployable ramps at the two center doors.

  • Temperature control for a comfortable ride.

  • Digital signs inside the trains show the next station and update when approaching stations.

  • Audio announcements announce approaching stations.


SacRT’s Fleet Mix

For the first couple of weeks, SacRT will operate a mixed fleet of new low-floor and legacy high-floor trains on the Gold and Green lines as we complete the final testing phase of the new trains.

On the Blue Line SacRT will continue to operate the current high-floor trains, which still require riders in mobility devices and those unable to climb stairs to use the mini-high ramps at the end of the station platforms.

Ad Loading...

SacRT will begin construction on Blue Line platforms to meet the height requirements of the new low-floor trains in late September 2024. with.

Siemens Mobility Inc. will begin production on an additional eight low-floor trains later this year, which are expected to be delivered to SacRT in late 2025.

To date, SacRT has received funding for a total of 45 new low-floor trains, with a contract to order up to 76 new vehicles.

More Rail

A rendering of Trinity Metro's future station at the Medical Center
Rail•by Alex Roman•October 30, 2026

Trinity Metro Breaks Ground on $270M TEXRail Extension

The 2.1-mile extension will connect Fort Worth’s Medical District and Near Southside to downtown, surrounding communities, and Dallas-Fort Worth International Airport.

Read More →
Austin Light Rail rendering from UT perspective
Rail•by Alex Roman•October 30, 2026

Bringing Austin’s First Light Rail System to Life

Austin Transit Partnership CEO Greg Canally discusses the city's nearly 10-mile light rail project, its collaborative approach to project delivery, the importance of community engagement, and the milestones ahead as construction approaches in 2027.

Read More →
Two Metra locomotives on rail tracks.
Rail•by Alex Roman•October 29, 2026

Metra Draft Plan Outlines Costs, Service Improvements for Regional Rail

The Systemwide Network Plan identifies infrastructure needs and potential investments to expand all-day, bidirectional rail service across the Chicago region.

Read More →
Ad Loading...
METRO Magazine graphic featuring railroad tracks and switches inside a dark tunnel with the headline “Amtrak Completes First Street Tunnel Upgrades, Restores Service.”
Rail•by Elora Haynes•October 29, 2026

Amtrak Completes First Street Tunnel Upgrades, Restores Service

The nine-day construction project included replacing aging track infrastructure and modernizing switch systems near Washington Union Station.

Read More →
FRA Invests $2.3B in Rail Projects Nationwide
Rail•by Alex Roman•October 28, 2026

FRA Announces $2.3B for Passenger, Freight Rail Projects Nationwide

The CRISI Grant Program funding will support rail infrastructure improvements, safety upgrades, and projects aimed at improving freight and passenger rail service across 45 states and Washington, D.C.

Read More →
A Caltrain electric railcar on the tracks
Rail•by Alex Roman•October 27, 2026

Caltrain’s Electrification Drives a New Era of Ridership Growth

The railroad’s shift to electric service has brought more frequent trains, stronger customer satisfaction, and increased ridership, earning it APTA’s Outstanding Public Transportation System award.

Read More →
Ad Loading...
METRO Magazine graphic featuring a dark blue background with abstract curved lines and the headline “FTA Advances $164M Broward County Commuter Rail Project.”
Rail•by Staff and News Reports•October 26, 2026

FTA Advances $164M Broward County Commuter Rail Project

The proposed 10.5-mile commuter rail extension would connect Fort Lauderdale and Aventura, expanding passenger rail options in South Florida.

Read More →
An A line MTA subway car near the soon to be replaced signaling system.
Rail•by Staff and News Reports•October 23, 2026

New York MTA Launches Historic $1.9B Signal, Track Modernization Project

Funded in part by congestion pricing revenue, the project will replace nearly century-old signals along the A and C lines in Brooklyn and Queens.

Read More →
The LA Metro San Fernando Valley light rail extension corridor
Rail•by Alex Roman•October 20, 2026

LA Metro Breaks Ground on East San Fernando Valley Light Rail Project

The 6.7-mile line will add 11 stations along Van Nuys Boulevard, expand access to jobs and regional transit connections, and support Metro’s broader efforts to improve mobility as rail ridership grows.

Read More →
Ad Loading...
New Standard Helps Transit Agencies Address Climate Risks
Security and Safety•by Alex Roman•October 19, 2026

CSA Group Releases Climate Resilience Standard for Transit, Passenger Rail

Developed with support from the Standards Council of Canada, CSA D700 guides assessing climate-related risks and planning adaptation measures for transit and passenger rail systems.

Read More →