METRO Magazine Logo
MenuMENU
SearchSEARCH

STV, SMART Open New Station and Rail Extension in California

The 3.2-mile addition advances SMART’s 70-mile corridor, with STV providing full-service design for stations, bridges, pathways, and safety infrastructure.

A SMART (Sonoma-Marin Area Rail Transit) train stopped at a platform during a station opening event, with people standing beside the train and signage posted near the edge of the platform.

Officials mark the opening of SMART’s new 3.2-mile rail extension, part of the agency’s ongoing effort to complete its 70-mile regional corridor.

Photo: STV

2 min to read


STV joined California’s Sonoma-Marin Area Rail Transit (SMART) to celebrate the opening of the new Windsor commuter rail station and a 3.2-mile extension of its passenger rail line.

The milestone event marks a significant advancement in SMART’s mission to expand sustainable, multimodal transportation throughout California’s North Bay region.

Ad Loading...

The New Windsor Station

As SMART’s design partner, STV provided comprehensive design services for the Windsor extension. The scope included rail, civil, and structural engineering; station architecture; bridge and roadway design; and the integration of a non-motorized pathway alongside the track.

The extension adds 3.2 miles of reconstructed railroad track from the existing Sonoma County Airport Station to downtown Windsor. Highlights of the project include:

  • A newly constructed passenger station in Windsor.

  • Five rebuilt rail bridges span regional streambeds.

  • Two pedestrian bridges.

  • A pedestrian underpass.

  • A new parking facility.

  • Upgraded railroad grade crossings with modern safety features.

  • An adjacent non-motorized pathway to enhance walkability and bike access.

“The opening of the New Windsor Station marks a significant step toward completing a regional rail vision more than 30 years in the making,” said Andrew Sokol, vice president and engineering director at STV. “STV is proud of our long-standing partnership with SMART, and we are excited to help them bring newer, safer, and more resilient regional rail options to the North Bay communities.”

SMART Marking Milestones

The Windsor extension is a key milestone in SMART’s broader plan to establish a 70-mile passenger rail corridor connecting Larkspur to Cloverdale, with 16 total stations along the route.

Ad Loading...

The project aims to support local tourism, improve regional connectivity, and reduce environmental impacts by promoting transit-oriented development.

STV has played a central role in the corridor’s development, having designed 45 of the 48 miles of SMART’s rail line. This work includes the design of 11 stations, more than 30 bridges, and 80 grade crossings.

Similar News: Phoenix's Valley Metro Taps STV to Assess Rail System Environmental Design 

More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →