
Trinity Metro Breaks Ground on $270M TEXRail Extension
The 2.1-mile extension will connect Fort Worth’s Medical District and Near Southside to downtown, surrounding communities, and Dallas-Fort Worth International Airport.
Read More →
The 2.1-mile extension will connect Fort Worth’s Medical District and Near Southside to downtown, surrounding communities, and Dallas-Fort Worth International Airport.
Read More →
One of Kiley’s most enduring legacies was the removal of graffiti — a potent symbol of disorder — throughout New York City’s subway system.
Read More →
Time lapse showing an Elizabeth line train being build at Bombardier in Derby, England. The full-length trains will be able to accommodate 1,500 passengers.
Read More →
The solicitation is part of a larger corporate program focused on innovative strategies for sustainable financial performance and infrastructure reinvestment.
Read More →
Following the derailment at East Falls Church, Wiedefeld ordered a new round of inspections for all interlockings conducted by rail maintenance supervisors with track engineers participating.
Read More →
Supporters want to build on the momentum from the 2.2-mile starter line that launched in May and go south about 3.75 miles.
Read More →
Sustained effort to keep the tracks clean includes two-week track cleaning blitz at all 469 subway stations and new cleaning equipment.
Read More →
The report includes findings from FTA’s spring 2016 “Safety Blitz” assessment of Metrorail and details systemic deficiencies in the inspection, maintenance and repair of track that have contributed to or could have resulted in train derailments and other track-related incidents.
Read More →
The agency does anticipate, however, picking up a Virginia Railway Express option to purchase 21 railcars from Japanese rolling stock manufacturer Nippon Sharyo at an estimated cost of $2.5 million per car.
Read More →
The train derailed at an interlocking about 50 feet from the East Falls Church station platform. Approximately 75 passengers were evacuated to the wayside and onto the station platform. The trailing truck of the fourth railcar and the leading truck from the fifth railcar derailed.
Read More →
Also expects to have at least 40 railcars leased from other agencies, which should allow it to return to a regular schedule in about two months.
Read More →