AeCON Group to refurbish GO Transit
Under the contract, AeCON will refurbish Union Station’s 360,000 square-foot train shed covering 13 tracks and 23 platforms, replacing the existing roof with a new steel roof and a glass atrium that reaches 50 feet above the platform level.
On Thursday, Toronto-based AeCON Group Inc. announced that its buildings division was awarded a contract by GO Transit, a division of Metrolinx for the $196 million refurbishment of the Union Station train shed.
Under the contract, AeCON will refurbish Union Station’s 360,000 square-foot train shed covering 13 tracks and 23 platforms, replacing the existing roof with a new steel roof and a glass atrium that reaches 50-feet above the platform level. Fifty new stair access points and nine new passenger elevators will be built to help move passengers from the existing concourse level to the newly-refurbished platforms.
The project also involves the removal and repair of approximately 4,374 yards of existing track beds, as well as electrical and mechanical work including communication systems, signals, a new roof drainage system and a snow melting system.
The existing station is subject to a heritage easement administered by Parks Canada and, will therefore, undergo preservation and restoration to reinstate it to its original condition wherever possible. The refurbishment will be completed in eleven stages with each stage involving the closure of two tracks and two platforms. The project is scheduled for completion in November of 2014.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →