Alstom consortium awarded London Crossrail contract
The joint venture will fit out the approximately 13 miles of twin tunnels that will stretch under London with the track and power equipment necessary for Crossrail trains to operate from 2018.

Entrance to Crossrail western tunnels. Each tunnel is 20 feet in diamter - significantly larger than existing London Underground tunnels. Photo courtesy Crossrail.

Entrance to Crossrail western tunnels. Each tunnel is 20 feet in diamter - significantly larger than existing London Underground tunnels. Photo courtesy Crossrail.
The ATC joint venture, consisting of Alstom, TSO and Costain, was awarded its first contract to fit out and commission the Crossrail tunnels currently being bored under the streets of London.
The contract is worth approximately $4.4 million and one of the largest that Crossrail intends to award. It will see the Alstom-led joint venture fitting out the approximately 13 miles of twin tunnels that will stretch under London with the track and power equipment necessary for Crossrail trains to operate from 2018.
ATC will be installing more than 24 miles of track, together with rigid overhead conductors, a system that is being used for the first time in the UK to power heavy mainline trains through tunnels.
More Rail

Biz Briefs: RIPTA Unveils New Frontrunners, Clevland RTA Adds New Siemens, and More
In METRO's latest installment, we take a look at recent news from Siemens, Prevost, Dodge, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →
The Business Voice Behind Public Transportation
As chair of APTA’s Business Members Board of Governors, Ray Melleady explains how more than 850 business members are partnering with transit agencies to advance funding, innovation, and industry-wide collaboration.
Read More →
FRA Announces $5.3B in Rail Investments, Including $2B for Amtrak
Funding will support grade-crossing improvements, infrastructure upgrades, and new Amtrak equipment in 23 states.
Read More →
Finding the ‘Happy Medium’: Optimizing Maintenance Without Sacrificing Reliability
The key to maintenance optimization isn’t doing less work—it’s doing the right work at the right time on the right assets.
Read More →
OKC Streetcar Makes Zero-Fare Service Permanent
Ridership increased an average of 71% compared with the same period a year earlier during the fare-free pilot.
Read More →