METRO Magazine Logo
MenuMENU
SearchSEARCH

Alstom, Partners Launch 1st REM Segment in Montreal

Upon completion, REM will be one of the world's largest automated transport networks — approximately 42 miles long with 26 stations — connecting downtown Montreal to the South Shore, the North Shore, the West Island, and Pierre Elliott Trudeau International Airport.

Alstom, Partners Launch 1st REM Segment in Montreal

Groupe PMM provided REM with a complete driverless, automated metro system, including rolling stock and signaling, and will operate and maintain the entire 42-mile system for 30 years.

Photo: Alstom

2 min to read


The consortium led by Alstom, Groupe des partenaires pour la mobilité des Montréalais (Groupe PMM), participated in the inauguration hosted by its customer, CDPQ Infra, of the first segment of Réseau express métropolitain (REM), a new automated urban rail system, which connects Brossard on Montreal’s South Shore with Montreal’s Central Station.

Upon completion, REM will be one of the world's largest automated transport networks — approximately 42 miles long with 26 stations — connecting downtown Montreal to the South Shore, the North Shore, the West Island, and Pierre Elliott Trudeau International Airport, it will provide rapid service with trains arriving every three minutes 45 seconds during peak hours and operate 20 hours a day.

Ad Loading...

Alstom’s Participation

Groupe PMM provided REM with a complete driverless, automated metro system, including rolling stock and signaling, and will operate and maintain the entire 42-mile system for 30 years. The first segment, between Brossard and Montreal’s Central Station, spans 10.5 miles and includes five stations equipped with a system of platform screen doors installed by Alstom, a first in Quebec. Eighty Metropolis metro cars will be operated on this segment, which will enter commercial service on July 31.

“We are extremely proud today with our partners to participate in the inauguration of the REM in Montreal,” says Henri Poupart-Lafarge, Chairman and CEO of Alstom. “This project is a great showcase for demonstrating Alstom’s leadership to serve its customers from A to Z, bringing together its undisputable integrated turnkey and services leadership and expertise.”

Under the terms of the contract, Groupe PMM will supply 212 Alstom Metropolis metro cars (106 two-car trainsets), Alstom’s Urbalis GoA4 (Grade of Automation 4) driverless and automated communications-based train control (CBTC) solution, and Alstom’s Iconis control center solution, as well as platform screen doors, Wi-Fi connectivity, cybersecurity, depot equipment and 30 years of operations and maintenance services, including HealthHub for predictive maintenance and fleet management. Groupe PMM is also responsible for train and system integration tests.

More Rail

Coastal railroad tracks run between a steep bluff and the Pacific Ocean in San Clemente, California, with rock barriers protecting portions of the shoreline.
Rail•by Elora Haynes•October 1, 2026

OCTA Declares Emergency to Protect Rail Corridor From Coastal Erosion

The California agency is accelerating shoreline protection and plans to place approximately 690,000 cubic yards of sand along the San Clemente coast to protect a key passenger and freight rail link.

Read More →
DRPA interns with program swag.
Management•by Alex Roman•October 1, 2026

More Than a Summer Job: Building the Next Generation of Transit Talent

The Delaware River Port Authority and PATCO have transformed their internship program into a hands-on professional development experience that introduces students to the breadth of transportation careers — and creates a pipeline for future employees.

Read More →
An Amtrak Airo trainset on the Cascades line
Rail•by Alex Roman•September 30, 2026

Airo Trains Make Their Amtrak Cascades Debut in the Pacific Northwest

Effective immediately, two cutting-edge Airo trainsets will join the Amtrak Cascades route, operating four daily trips between Vancouver, B.C., Seattle, Portland, and Eugene, Oregon, marking the first introduction of Airo trains into passenger service anywhere in the country.

Read More →
Ad Loading...
Rail•by Alex Roman•September 29, 2026

Florida's Brightline Announces Financial Restructuring

Brightline Florida says train operations will continue as normal as certain parent entities enter Chapter 11 and financial stakeholders provide $490 million in new long-term capital.

Read More →
Bus manufacturing image from ENC
Technology•by Alex Roman•September 25, 2026

ENC Lands MATA Contract and More in Biz Briefs

In this edition of Biz Briefs, we spotlight the latest developments shaping the future of mobility.

Read More →
Turning transit data into better decisions
Management•by Alex Roman•September 23, 2026

Strada360’s Steve Lassey on Turning Transit Data Into Better Decisions

From breaking down data silos to preparing for AI, Strada360 CEO Steve Lassey discusses how transit agencies can use technology to improve operations, customer information, and long-term decision-making.

Read More →
Ad Loading...
SEPTA Accelerate press conference
Management•by Staff and News Reports•September 23, 2026

SEPTA Details Accelerate Vision for Transit System

The plan outlines investments in trolley modernization, new Metro and Regional Rail vehicles, accessible stations, and more frequent bus and rail service.

Read More →
Two MBTA railcars in station.

FTA Ends Direct Oversight of MBTA Safety Actions

The federal agency closed its remaining special directive to the Massachusetts Department of Public Utilities following a safety review that began in 2022.

Read More →
A photo of an Amtrak train with a logo
Rail•by Staff and News Reports•September 17, 2026

Amtrak, CN Reach Agreements to Strengthen Passenger Rail Service, Safety

The agreement resolves a more than decade-long proceeding before the Surface Transportation Board concerning the terms and conditions for Amtrak services, such as the City of New Orleans, Illini/Saluki, and Wolverine.

Read More →
Ad Loading...
A New York MTA subway car with an open gangway
Rail•by Staff and News Reports•September 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →