APTA members serve the public interest by providing safe, efficient and economical transit services and products.
BART
2 min to read
APTA members serve the public interest by providing safe, efficient and economical transit services and products.
BART
The Bay Area Rapid Transit (BART) team consisting of Joshua Vining, Justin Strong, Gary Crandall, Steven Dore, and Erroll Luciano, won the prestigious Rail Transit Team Achievement Award at the 27th annual American Public Transportation Association (APTA) International Rail Rodeo.
The Rodeo was held June 21-22 in conjunction with the 2019 APTA Rail Conference in Toronto, ON. The Rail Transit Team Achievement Award is given to the system with the highest rail operator and maintainer team combined score.
The Operators Competition measures professional skills, including train operation, knowledge of safety regulations, train equipment, and track right-of-way rules and procedures.
Logan Packer and Michelle Smith, on behalf of Utah Transit Authority (Salt Lake City, UT), won first place in the Operators Competition while Joshua Vining and Justin Strong of BART placed second. The team of Earleke Kidd and Eugene Metts of MDOT Maryland Transit Administration (Baltimore, MD) took third-place honors.
In the Maintainers Competition, participants are evaluated on their ability to troubleshoot maintenance problems. The BART team of Gary Crandall, Steven Dore, and Erroll Luciano were named winners in this category. The LA Metro team of Marcos Martinez, Paker Rounds, and Calvin Wong placed second. The RTD maintainer team of Michael Hubbard, Randall Lovegrove, and George Sweeney won third place.
The APTA International Rail Rodeo Competition encourages excellence and professionalism in rail transit operations. This years’ competition included 19 teams of operators and 15 mechanic teams from the United States, Canada, and Japan.
Amtrak will open grant applications March 23 for community projects near the Frederick Douglass Tunnel alignment in Baltimore as part of a $50 million investment tied to the B&P Tunnel Replacement Program.
The Denmark Station $2.3 million construction investment project includes a new 280-foot concrete boarding platform, built eight inches above the top of rail, for improved accessibility for passengers with disabilities and families with small children and much more.
Caltrain and its partners have implemented safety improvements at specific locations in response to known risk conditions, operational needs, and available funding since the agency’s founding.
On a recent episode of METROspectives, METRO Magazine’s Executive Editor Alex Roman sat down with Ana-Maria Tomlinson, Director of Strategic & Cross-Sector Programs at the CSA Group, to explore a bold initiative aimed at addressing those challenges: the development of a National Code for Transit and Passenger Rail Systems in Canada.
Competitive FTA grants will support accessibility upgrades, family-friendly improvements, and cost-efficient capital projects at some of the nation’s oldest and busiest transit hubs.
The 3.92-mile addition will soon take riders west beyond its current Wilshire and Western station in Koreatown, continuing under Wilshire Boulevard through neighborhoods and communities including Hancock Park, Windsor Square, the Fairfax District, and Carthay Circle into Beverly Hills.
Under the plan, all long-distance routes will transition to a universal single-level fleet, replacing today’s mix of bi-level and single-level equipment.