METRO Magazine Logo
MenuMENU
SearchSEARCH

Bombardier to supply 90 railcars to Germany

The order for the electric multiple units of the 430 series, from DB Regio AG, totals $648 million.

December 27, 2011
Bombardier to supply 90 railcars to Germany

 

2 min to read


Bombardier Transportation received an order for 90 electric multiple units of the 430 series from DB Regio AG. The order value totals $648 million. To date 87 trains of the same series 430 have already been ordered for the Stuttgart region and production of these is under way.

DB Regio won a European-wide tender from the Rhein-Main-Verkersverbund (RMV) in November 2011, securing the transportation contract for the Rhein-Main rapid transit network. The new 90 four-car electric multiple units of the 430 series are to be used in the suburban-network Kleyer, covering more than 4.5 million train miles a year, from December 2014 onward. The trains are able to accelerate rapidly and can reach speeds of up to 87 mph during operation.

The electric multiple units of the 430 series have 24 electric swivel-sliding doors, enabling easier and more rapid passenger flow. The trains will also provide a spacious multi-purpose area to ensure greater convenience for passengers traveling with bicycles. Energy-saving indirect LED lighting integrated in the luggage racks enhances the interior ambience. All coaches are joined together by convenient walkways. Information on connecting trains is displayed in real time via a modern passenger information system with a monitor in each of the entrance areas.

Video monitoring cameras, combined with an open layout, which allows a clear view of the train interior over its entire length, help increase safety and security for all passengers. The vehicles will be built in Germany by Bombardier and by Alstom prior to final delivery in 2014.

More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →