The average speed of drivers on Gatineau and Ottawa routes was approximately 15 miles per hour, and the resulting distance the BYD bus could travel at this average speed was approximately 155 miles. The bus now heads to Montreal
The first phase of a 10-month trial for a zero-emissions, 40-foot, all-electric BYD bus was completed in Gatineau, Quebec and Ottawa, Ontario in December.
The evaluation was performed by the Société de transport de l'Outaouais (STO) in conjunction with AVT (the Société de gestion et d'acquisition de véhicules de transport), with partial findings presented at the 2013 EV/VE Conference and Tradeshow in Gatineau-Ottawa by Salah Barj, director, planning and development at STO.
Ad Loading...
The battery-electric bus was supplied by BYD under a service agreement and continues its evaluations in partnership with the Société de transport de Montreal (STM) until spring of 2014.
STO found that the average speed of drivers on Gatineau and Ottawa routes was approximately 15 miles per hour, and the resulting distance the BYD bus could travel at this average speed was approximately 155 miles — the equivalent of 1.3 kWh/ Km without air-conditioning on and 1.5 kWh/ Km with air-conditioning and full passenger loads.
In this conversation, TBC’s Executive Director Ed Redfern, President Corey Aldridge, and Washington Representative Joel Rubin outline the coalition’s key policy priorities, the challenges facing transit agencies, and how industry stakeholders can work together to strengthen the voice of bus transit at the federal level.
What truly drives the cost of a paratransit fleet? Beyond the purchase price, seven operational factors quietly determine maintenance frequency, downtime, and long-term service reliability. This whitepaper explores how these factors shape lifecycle cost and what agencies should evaluate when selecting paratransit vehicles.
In this conversation, TBC’s Executive Director Ed Redfern, President Corey Aldridge, and Washington Representative Joel Rubin outline the coalition’s key policy priorities, the challenges facing transit agencies, and how industry stakeholders can work together to strengthen the voice of bus transit at the federal level.
Originally introduced in 2023 as the Bus Line Redesign, the effort has evolved into a more targeted update that maintains familiar routes while improving reliability, frequency, evening and weekend service, and connections across Allegheny County.
S3 will connect communities along SR 522 with fast, reliable, battery-electric bus service from Shoreline South Station to Bothell via Kenmore and Lake Forest Park.