METRO Magazine Logo
MenuMENU
SearchSEARCH

Chicago Transit to install LED signs at bus shelters

The signs will be strategically placed at bus stops, with at least one in each ward and where higher numbers of boardings occur, and also at busy transfer and connection locations.

May 11, 2011
2 min to read


The Chicago Transit Authority's (CTA) board approved the purchase of 160 light emitting diode (LED) signs to be installed at select bus shelters throughout the city. The LED signs will display Bus Tracker estimated arrival time information.

The signs will be strategically placed at bus stops, with at least one in each ward and where higher numbers of boardings occur, and also at busy transfer and connection locations.

Ad Loading...

"LED displays are yet another method by which customers can get estimated bus arrival times," said CTA President Richard L. Rodriguez. "Currently, Bus Tracker times are available on desktop computers and Web-enabled mobile devices. Thanks to RTA and FTA grants, the agency can now expand its reach to those who do not have computers or smartphones."

The signs will display four lines of text with arrival information specific to the location of the bus shelter. The LED signs will be placed throughout the city to serve as many riders as possible.

Luminator Holding LP was awarded the competitively bid contract to manufacture the signs. The contract length is for one year for just over $1 million for the initial purchase. A separate contract to install, maintain and remove the LED signs was awarded to JC Decaux in the amount of $687,300.

The funds were made available through a Regional Transit Authority grant and a Federal Transit Administration, Congestion Mitigation and Quality (CMAQ) grant. CTA has the option to purchase up to 2,050 LED signs for up to five years from the date of the contract.

 

More Bus

Passengers boarding a PRT bus
Busby StaffMarch 2, 2026

Pittsburgh Unveils 'Bus Line Refresh' Plan

Originally introduced in 2023 as the Bus Line Redesign, the effort has evolved into a more targeted update that maintains familiar routes while improving reliability, frequency, evening and weekend service, and connections across Allegheny County.

Read More →
Stickers and a paper bus for S3 bus line
Busby StaffMarch 2, 2026

Seattle's Sound Transit Breaks Ground on S3 Bus Line

S3 will connect communities along SR 522 with fast, reliable, battery-electric bus service from Shoreline South Station to Bothell via Kenmore and Lake Forest Park. 

Read More →
PRT bus stop with articulated bus.
Busby StaffFebruary 20, 2026

Pittsburgh Regional Transit Announces All-Door Boarding on the University Line

All-door boarding will allow passengers to pay while entering the front, middle, or rear doors of the University Line’s 60-foot articulated buses.

Read More →
Ad Loading...
Patrick Scully, president at Complete Coach Works.
Managementby StaffFebruary 18, 2026

Complete Coach Works Names Patrick Scully President

He succeeds the company founder, Dale Carson, who remains chairman of the board. 

Read More →
A MARTA articulated bus.
Busby StaffFebruary 13, 2026

Atlanta's MARTA Sets Date for 'A-Line' BRT Launch

The five-mile Rapid A-Line connects Downtown Atlanta to Capitol Gateway, Summerhill, Peoplestown, and the Beltline’s Southside Trail.

Read More →
A Picture of Ster Seating's Parent/Child transit seating product.
Technologyby StaffFebruary 10, 2026

Ster Seating, Maryland Transit Launch First Parent/Child Transit Seat in North America

The configuration uses Ster Seating's Gemini seat platform to create a family-friendly floor layout specifically engineered to accommodate parents traveling with young children.

Read More →
Ad Loading...
Rendering of Sound Transit's Renton Transit Center
Busby StaffFebruary 5, 2026

Seattle’s Sound Transit Breaks Ground on New Transit Center

The Renton Transit Center project will relocate and rebuild the Renton Transit Center to better serve the regional Stride S1 line, local King County Metro services, and the future RapidRide I Line.

Read More →
David Carol, Baker Alloush, and Jesse Lazarus from METRO's People Movement February 4 edition.
Managementby Staff and News ReportsFebruary 4, 2026

New Rolling Stock Strategy Lead at New York MTA and More in People Movement

In this edition, we cover recent appointments and announcements at HDR, NCTD, STV, and more, showcasing the individuals helping to shape the future of transportation.

Read More →
Railby StaffFebruary 2, 2026

Chicago Region Transit Ridership Grows in 2025

The region’s fixed-route system finished out the year with a total of 373.5 million rides. Adding 12.3 million rides over 2024 represents an increase that is equal to the annual transit ridership of Kansas City.

Read More →
Ad Loading...
King County Metro electric buses made by GILLIG.
Busby StaffJanuary 30, 2026

Seattle's King County Metro Introduces New Battery-Electric Buses

Rolling out in electric yellow and seafoam blue, the first battery-electric buses purchased from GILLIG will begin serving riders in south King County on February 2.

Read More →