Read More: CTA Ridership Hits Post-Pandemic Record
CTA's New ADA Fare Gates Enhances Rail Station Access
Work to replace existing Special Access Gates (SAGs) across the rail system will continue through early 2024.

Currently, 24 of the new ADA doors have already been installed at rail stations across the system.
Photo: CTA
The Chicago Transit Authority (CTA) announced it is installing new and improved fare gates at rail stations across the system that are compliant with the Americans with Disabilities Act (ADA).
Work to replace existing Special Access Gates (SAGs) across the rail system will continue through early 2024.
“The installation of these new ADA fare gates balance the agency’s goal of enhancing accessibility throughout the rail system, while also addressing concerns around individuals entering rail stations with the intent to disrupt our service or other riders,” said CTA President Dorval R. Carter, Jr.
Details of the New Fare Gates
The new doors include an improved locking mechanism with more reliable hardware and will operate in the same manner as the existing gates.
To help reduce fare evasion, the doors are taller, and the exit button will be more difficult to reach from the unpaid side.
The new ADA fare gates are designed to improve accessible entrances at CTA rail stations and address fare evasion concerns, including those entrances that may not be staffed with a Customer Service Representative (CSR).
“As a wheelchair user myself, I am glad that these new doors will be more reliable and durable for those who cannot use turnstiles and are dependent on these gates functioning properly,” said CTA ADA Compliance Programs Manager, Irma Gomez-Fierro. “In addition, these new fare gates will serve as an added safety measure, helping deter individuals from misusing the doors and preventing the wrong riders from utilizing an accessible entrance.”
CTA’s investment follows similar rail gate infrastructure improvement projects by transit agencies across the country to address fare evasion concerns, including Washington Metropolitan Transit Authority (WMATA), Bay Area Rapid Transit (BART), and Southeastern Pennsylvania Transportation Authority (SEPTA).
Currently, 24 of the new ADA doors have already been installed at rail stations across the system. They will replace the remaining 119 SAGs located throughout the CTA rail system by early 2024.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →