The 18.5 mile Red Line will be the longest corridor in the network and nearly doubles the footprint of the existing First Coast Flyer system, connecting more people to jobs, education, healthcare, and entertainment.
The First Coast Flyer Red Line will operate with 19 energy efficient CNG buses offering complimentary Wi-Fi, mobile ticketing with MyJTA, and bus arrival information with NextBus.
JTA
2 min to read
The First Coast Flyer Red Line will operate with 19 energy efficient CNG buses offering complimentary Wi-Fi, mobile ticketing with MyJTA, and bus arrival information with NextBus.
JTA
Fla.’s Jacksonville Transportation Authority (JTA) was awarded a $16.9 million Capital Investment Grant from the Federal Transit Administration (FTA) for the First Coast Flyer™ Bus Rapid Transit (BRT) East Corridor, or Red Line, which is the fourth segment of a five-phased First Coast Flyer system planned for the Jacksonville area.
The 18.5 mile Red Line will be the longest corridor in the network and nearly doubles the footprint of the existing First Coast Flyer system, connecting more people to jobs, education, healthcare, and entertainment.
Ad Loading...
“The signing of this Capital Investment Grant Agreement is another significant step in the First Coast Flyer program for the Jacksonville Transportation Authority,” said JTA CEO Nathaniel P. Ford Sr. “The First Coast Flyer initiative has already transformed travel in the Northeast Florida region with the Green and Blue Lines, which were launched in December 2015 and December 2016 respectively.”
The $33.9 million East Corridor project is funded by the FTA, Florida Department of Transportation, and the JTA and includes 21 branded stations, transit signal priority at 32 intersections (holds green lights, allowing buses to move through intersections without stopping), and off-board fare collection. The Flyer makes fewer stops and offers 10-minute frequency during weekday peak hours and 15-minute frequency in weekday off peak hours.
The First Coast Flyer Red Line will operate with 19 energy efficient CNG buses offering complimentary Wi-Fi, mobile ticketing with MyJTA, and bus arrival information with NextBus. The Red Line is scheduled to launch in December 2018 on the East Corridor. It will operate between Rosa Parks Transit Station and the Jacksonville Beach along the Arlington Expressway and Beach Boulevard with stops at major destinations, including Florida State College Jacksonville South and Downtown Campuses.
The Green and Blue lines comprise 20.5 miles and laid the foundation for a regional transportation network that has boosted our economy and enhanced the quality of life in the community. When completed, the First Coast Flyer will cover 57 miles of destination travel, and will be the largest bus rapid transit system of its kind in the Southeast.
In Part 1, Blandon shares his journey from the U.S. Marines to a leadership role in public transit, along with insights on mentorship and professional growth within the industry.
Funded through the 2025 Investment Plan, the new R2 Marine–Willingdon RapidBus is expected to begin service in September, more than three months ahead of schedule.
Complete Parts features new branding with a new logo, a new contact telephone number, a dedicated order desk, enhanced processes and inventory, all designed to provide the parts bus operations need.
Accessible transit isn’t a feature—it’s a responsibility. This whitepaper explores how the Low-Floor Frontrunner is redefining mobility with a breakthrough design that removes barriers, empowers riders, and delivers measurable operational advantages for agencies. Discover why this next generation minibus is setting a new standard for inclusive transportation.
SEPTA was awarded $43 million in competitive grant funding from the FTA's FY25 Low and No Emission and Bus and Bus Facilities grant programs to support this procurement.
In part 1 of a two-part conversation, AC Transit’s director of maintenance joins co-hosts Alex Roman and Mark Hollenbeck to discuss his journey from the U.S. Marines to public transit and the role mentorship plays in developing the next generation of industry leaders.
When construction is complete, battery-electric buses will operate from the Arborway facility on Day One, providing cleaner, quieter, and more reliable service for riders, the MBTA said. After completion, the old facility will be demolished, and the land will be made available for redevelopment.
Nadine S. Lee, who has served as president/CEO since July 2021, said the decision comes after careful reflection on the agency’s progress and its path forward.
In this conversation, TBC’s Executive Director Ed Redfern, President Corey Aldridge, and Washington Representative Joel Rubin outline the coalition’s key policy priorities, the challenges facing transit agencies, and how industry stakeholders can work together to strengthen the voice of bus transit at the federal level.