Read More: FRA Grants $38.3M to L.A. Metro for Project to Improve Safety
FRA Awards $16.4B for Passenger Rail Projects
Projects were selected through the Bipartisan Infrastructure Law’s Federal-State Partnership for Intercity Passenger Rail Program (Fed-State NEC).

The latest investment will overhaul infrastructure that outdates 99% of all living Americans by replacing or upgrading 12 major bridges and tunnels that are over 100 years old.
Photo: FRA
The U.S. Department of Transportation’s Federal Railroad Administration (FRA) today announced it has awarded $16.4 billion for 25 passenger rail projects along the Northeast Corridor (NEC), a railroad line running between Boston and Washington, D.C.
This particular line is one of the highest-volume passenger rail corridors in the world and the busiest in the U.S., with hundreds of thousands of daily riders. It also supports billions of dollars in annual economic activity.
Projects were selected through the Bipartisan Infrastructure Law’s Federal-State Partnership for Intercity Passenger Rail Program (Fed-State NEC).
This rail announcement, which will support over 100,000 good-paying construction jobs and advance Gateway Program projects, is a step forward as President Biden advances a vision for passenger rail. It is also the latest in a series of rail investments made under the Biden-Harris Administration.
The latest investment will overhaul infrastructure that outdates 99% of all living Americans by replacing or upgrading 12 major bridges and tunnels that are over 100 years old.
Taken together, these investments will upgrade tunnels, bridges, tracks, power systems, signals, stations, and more, allowing for increased speeds, reduced travel time, and a more reliable experience for riders.
“Under President Biden, we are finally delivering the generational investments in passenger rail that Americans have wanted for years, including modernizing the busiest rail corridor in the country,” said U.S. Transportation Secretary Pete Buttigieg. “These investments will make our busiest passenger railroad safer, faster, and more reliable, which means fewer delays and shorter commutes for the 800,000 passengers who rely on the Northeast Corridor every day.”
Funding for Fed-State NEC Projects
Examples of major Fed-State NEC projects moving forward with new funding include:
New Jersey/New York – Gateway Program: Hudson Tunnel Project Systems and Fit Out (Up to $3,799,999,820) The project includes the final design and construction of the Hudson River Tunnel project and rehabilitation of the existing 113-year-old North River tunnels. Construction will include the installation of track, signals, traction power, ventilation, fire and life safety systems, and other necessary systems work in the new Tunnel. As matching funds, the Gateway Development Commission (GDC) will provide approximately $950 million as part of a financing package through DOT’s Railroad Rehabilitation and Improvement Financing (RRIF) loan program. For the larger Hudson Tunnel Project: FRA has committed an additional $912 million through Amtrak; FTA has determined a contribution of up to $6.88 billion under their Capital Investment Grants program; USDOT has provided $25 million through the Rebuilding American Infrastructure with Sustainability and Equity (RAISE) program; and GDC will provide additional RRIF funds as part of the financing package.
Maryland – B&P Tunnel Replacement Program: Frederick Douglass Tunnel (Up to $4,707,571,556)The proposed project includes the final design and construction of the Baltimore and Potomac tunnel replacement, to be known as the Frederick Douglass Tunnel. The project constructs a new two-track tunnel for passenger rail use, three ventilation facilities, and an approach track. The project also reconstructs associated railroad and roadway bridges in the project area and rebuilds the West Baltimore commuter station to accommodate the new railroad alignment and upgrade the station to fully accessible high-level platforms. Upon completion, speeds along this segment will increase from 30 mph to 110 mph, eliminating the slowest section of the mainline track between Washington, D.C., and New York City. The tunnel is used by Amtrak’s intercity services and Maryland Area Regional Commuter Penn Line service.
Maryland – Susquehanna River Bridge Replacement Program (Up to $2,081,215,100) The project includes final design and construction for two new fixed, two-track bridges over the Susquehanna River between Havre De Grace and Perryville, Maryland, replacing the current 117-year-old, two-track structure that is beyond its useful life. The new spans will improve upon the 90-mph speed on the current structure, with one span designed for 125-mph operation and the other for up to 160-mph operation, reducing travel time for thousands of daily passengers along the NEC. Amtrak’s intercity services, Maryland Area Regional Commuter service, and freight service use the crossing. The project will improve the state of good repair and provide additional capacity to meet future growth. Amtrak and the State of Maryland will collectively provide $520 million in matching funds.
Connecticut – Connecticut River Bridge Replacement (Up to $826,645,100) The project includes construction to replace the existing Connecticut River bridge between Old Saybrook and Old Lyme, Connecticut, with a modern and resilient moveable bridge immediately to the south of the existing structure. The existing Amtrak-owned 116-year-old bridge poses a risk of long-term major disruption on the NEC due to its age and condition. The replacement bridge would maintain the two-track configuration and existing channel location and provide a bascule moveable span with additional vertical clearance for maritime traffic. The bridge serves the NEC main line and is used by Amtrak’s intercity services, Connecticut Shore Line East commuter service, and freight operators. The new structure will improve safety, and reliability, and increase operating speed for all operators. Amtrak will provide $148 million, and Connecticut will provide $58 million in matching funds.
New York – East River Tunnel Rehabilitation (Up to $1,261,851,977) The project includes the final design and construction of the East River Tunnels in New York City. The tunnels are used by Amtrak’s NEC services, Long Island Rail Road, and New Jersey Transit for a total of more than 400 daily trains. The 100-plus-year-old structure has four tracks, and this project will fund the full rehabilitation of tracks 1 and 2, with the installation of a new direct fixation track, traction power, drainage systems, signals, communication systems, and fire and life safety upgrades throughout the tunnel. Damage to the tunnels from Superstorm Sandy will be fully remediated, returning tracks 1 and 2 to a state of good repair and preparing the tunnels to accommodate future growth. Amtrak is contributing $55 million, the New York Metropolitan Transportation Authority is contributing $175 million, and New Jersey Transit is contributing $85 million in matching funds.
More Rail

FTA Ends Direct Oversight of MBTA Safety Actions
The federal agency closed its remaining special directive to the Massachusetts Department of Public Utilities following a safety review that began in 2022.
Read More →
Amtrak, CN Reach Agreements to Strengthen Passenger Rail Service, Safety
The agreement resolves a more than decade-long proceeding before the Surface Transportation Board concerning the terms and conditions for Amtrak services, such as the City of New Orleans, Illini/Saluki, and Wolverine.
Read More →
New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →