METRO Magazine Logo
MenuMENU
SearchSEARCH

GO Transit approved for phased electrification of rail corridors

The year-long study recently completed by Metrolinx revealed important transportation benefits associated with electrification, and these benefits would increase over time and as service levels increase. These benefits include shorter travel times for riders and lower operating costs.

January 27, 2011
GO Transit approved for phased electrification of rail corridors

Photo courtesy of Metrolinx.

2 min to read


[IMAGE]GO-Transit-train-full-3.jpg[/IMAGE]The board of Toronto-based Metrolinx approved the staff recommendation to begin electrification of the Lakeshore and Georgetown GO Transit rail corridors, with the new Air Rail Link (ARL) as the first phase.

"Electrification will provide important transportation benefits to our current and future riders," said Metrolinx Chair Rob Prichard. "Electrification is an essential step toward the long-term vision of Express Rail laid out in The Big Move." 

The year-long study recently completed by Metrolinx revealed important transportation benefits associated with electrification, and these benefits would increase over time and as service levels increase. These benefits include shorter travel times for riders and lower operating costs.

The Air Rail Link between Union Station and Pearson International Airport was recommended as the first phase as Metrolinx already owns the corridor, it would not require the electrification of the Union Station train shed area, and it will operate as a distinct service from GO Transit. 

The staff recommendation and study's final report were released on Jan. 19, 2011 and presented to the board at a special public meeting.

The final report, appendices and staff recommendation is available online.

Metrolinx is the province's regional transportation agency for the  Greater Toronto and Hamilton Area.

GO Transit is the Province of Ontario's regional public transit service linking Toronto with the surrounding regions of the GTHA. GO carries over 55 million passengers a year in an extensive network of train and bus services that spans over 10,000 square kilometres. GO Transit is a division of Metrolinx.

More Rail

Graphic from Amtrak promoting the B&P Tunnel Replacement and Frederick Douglass Tunnel project, featuring the Amtrak logo, project title and an illustration of a high-speed train near the West Baltimore MARC Station.
Railby News/Media ReleaseMarch 17, 2026

Amtrak Announces Community Grants for Projects Near Baltimore’s New Frederick Douglass Tunnel

Amtrak will open grant applications March 23 for community projects near the Frederick Douglass Tunnel alignment in Baltimore as part of a $50 million investment tied to the B&P Tunnel Replacement Program.

Read More →
Amtrak train with logo
Railby StaffMarch 16, 2026

Amtrak Marks Restoration of Two South Carolina Stations

The Denmark Station $2.3 million construction investment project includes a new 280-foot concrete boarding platform, built eight inches above the top of rail, for improved accessibility for passengers with disabilities and families with small children and much more.

Read More →
A view looking down the rail across the new Portal North Bridge.
Railby Staff and News ReportsMarch 13, 2026

NJ Transit, Amtrak Prepare to Open First Track on New Portal North Bridge

The new bridge will begin carrying passenger trains on March 16, replacing a 116-year-old swing bridge that has long caused delays.

Read More →
Ad Loading...
Caltrain trains on tracks
Railby StaffMarch 6, 2026

Caltrain Adopts Corridor-Wide Right-of-Way Safety Strategy

Caltrain and its partners have implemented safety improvements at specific locations in response to known risk conditions, operational needs, and available funding since the agency’s founding.

Read More →
A photo of rail tracks in Ottawa, Canada

Building a National Framework for Transit Safety and Consistency

On a recent episode of METROspectives, METRO Magazine’s Executive Editor Alex Roman sat down with Ana-Maria Tomlinson, Director of Strategic & Cross-Sector Programs at the CSA Group, to explore a bold initiative aimed at addressing those challenges: the development of a National Code for Transit and Passenger Rail Systems in Canada.

Read More →
Stairs in a New York rail station with text reading "USDOT Invests $686 Million to Modernize Aging Rail Stations."
Railby StaffMarch 2, 2026

FTA Invests $686M to Modernize Aging Rail Stations

Competitive FTA grants will support accessibility upgrades, family-friendly improvements, and cost-efficient capital projects at some of the nation’s oldest and busiest transit hubs.

Read More →
Ad Loading...
A purple MBTA train at a Mansfield Station platform.
Railby StaffFebruary 27, 2026

MBTA Updates Rail Modernization Plan to Expand Reliability and Accessibility

The strategy outlines near- and long-term upgrades to ease congestion, support housing growth, and advance statewide climate goals.

Read More →
LA Metro underground station with vehicle
Railby StaffFebruary 27, 2026

LA Metro Sets D Line Subway Extension Launch Date

The 3.92-mile addition will soon take riders west beyond its current Wilshire and Western station in Koreatown, continuing under Wilshire Boulevard through neighborhoods and communities including Hancock Park, Windsor Square, the Fairfax District, and Carthay Circle into Beverly Hills.

Read More →
MBTA railcars
Railby StaffFebruary 26, 2026

Boston's MBTA Marks Progress in Regional Rail Modernization

The procurement advances the agency's broader efforts to modernize its rail fleet and position Regional Rail for long-term improvement.

Read More →
Ad Loading...
An Amtrak Acela
Railby StaffFebruary 26, 2026

Amtrak Sets New Course for Long-Distance Fleet Renewal

Under the plan, all long-distance routes will transition to a universal single-level fleet, replacing today’s mix of bi-level and single-level equipment.

Read More →