GO Transit to install defibrillators
About 100 Mikey defibrillators are being installed on the accessible car of every GO Train, as well as at GO stations along the Lakeshore line, the end stations on each of GO's other six lines, Union Station,and all layover facilities.
GO Transit, in partnership with The Mikey Network and the Toronto EMSCardiac Safe City program, is installing public access defibrillators, called Mikeys, on GO Trains and at stations.
About 100 Mikey defibrillators are being installed on the accessible car of every GO train, as well as at GO stations along the Lakeshore line, the end stations on each of GO's other six lines, Union Station and all layover facilities. GO is the first transit system in the GTA to equip its vehicles and facilities with Mikey defibrillators.
A Mikey is a public-access defibrillator - an electronic device that delivers an electronic shock to the heart through the chest wall in order to restore the heart to its normal rhythm.
As part of GO's standard safety procedures and to ensure the well being of its customers, all frontline staff are trained in CPR and first aid. With the installation of the Mikeys, all GO personnel on board GO Trains and at train stations with a Mikey unit have been trained by Toronto EMS on how to use the defibrillator device.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →