MARTA Board Approves Slate of Projects
Additionally, the board approved the purchase of several New Flyer battery-electric and CNG buses.

MARTA's five-year contract with New Flyer includes 198 buses: 63 battery electric and 135 compressed natural gas.
Photo: MARTA
The committees of the Metropolitan Atlanta Rapid Transit Authority (MARTA) board advanced several projects in the City of Atlanta and DeKalb County and awarded a $226 million contract to New Flyer for fixed-route and MARTA Rapid buses.
The five-year contract with New Flyer includes 198 buses: 63 battery electric and 135 compressed natural gas (CNG). The first six MARTA Rapid 60-foot articulated battery electric buses arrive next year and will be used for operations on the region’s first bus rapid transit (BRT) line in Summerhill when it opens in 2025.
Twelve additional articulated 60-foot battery-electric buses follow for Rapid lines on Campbellton Road and Clayton Southlake. Federal funds from Sen. Jon Ossoff and the Federal Transit Administration’s Low and No Emissions grant will support the electric bus purchases. The contract also includes an option to purchase fuel-cell powered buses as hydrogen is explored by regional leaders.
Moving Ahead with BRT
A board committee approved an amended locally preferred alternative (LPA) for Campbellton Corridor BRT that changes the route from an alignment south of Greenbrier Mall to a flyover over I-285 from Greenbriar Parkway to Barge Road Park & Ride. The flyover creates faster more direct access from future Greenbriar Mall Station to Barge Road Station, cutting travel time roughly in half from the current local bus service.
The amended LPA features bridges over Highway 154 and I-285 with ramps to the BRT stations, exclusive bus-only lanes, and a 10-foot multi-use path. The new flyover is expected to cost approximately $15 to $25 million and will remain within the overall project budget of $300 million. The project is one of the nine Tier 1 projects and is expected to open in 2028.
DeKalb County Projects
Two DeKalb County projects also advanced, including the Buford Highway arterial rapid transit (ART). Currently served by MARTA’s highest ridership route, Route 39, the 10-mile route on Buford Highway connects Lindbergh Center Station to Doraville Station. The project includes traffic signal priority for faster, more reliable service, and distinct shelters that include seating and real-time service information screens and is expected to begin operating in 2026.
The South DeKalb Transit Hub moves into final design with the approval of a solicitation of proposals for final design services. The transit hub will improve customers’ experience and bus-to-bus transfers in South DeKalb by providing a covered waiting area with seating, restrooms, a customer service kiosk, MPD area, and real-time bus arrival information.
The hub is designed to accommodate current and future high-capacity routes. The total project cost is $37 million, and the hub will be operational in 2026.
More Bus

Brian Dickson on Building Stronger, More Resilient Transportation Organizations
Bus Business Consultants Founder Brian Dickson discusses the leadership principles, operational discipline, and strategic planning that separate transportation companies positioned for long-term success from those stuck in survival mode.
Read More →
LA Metro Breaks Ground on Vermont BRT Project
The 12.4-mile corridor is projected to serve 66,200 daily riders, reduce travel times by up to 24%, and create the nation's busiest bus rapid transit corridor.
Read More →
Roman Cornell on ABC Companies’ Evolution and the Future of Passenger Transportation
The company’s CEO discusses carrying forward a third-generation family legacy, ABC’s continued evolution in passenger transportation, support for increasingly complex fleets, and how technology and continued investment could help operators improve uptime.
Read More →
VIA Bus Ridership Grows 10.1% Through August 2026
San Antonio's VIA Metropolitan Transit reported the highest bus ridership growth among major Texas transit systems. Federal Transit Administration data ranked it second among the nation's 50 largest transit systems.
Read More →
LA Metro September Ridership Climbs 3.9%, Led by Rail Growth
The agency recorded more than 27.2 million boardings, with rail ridership increasing 12.4% year over year and the D Line posting the largest gains.
Read More →
Frontrunner Bus Group Introduces XF Low-Floor Bus with Enhanced Accessibility
The new mid-sized bus features a full flat-floor design, eight-inch curbside step-in height, and zero-entry rear ramp to improve passenger access and operational flexibility.
Read More →
Scenes from APTA TRANSform & EXPO 2026
Transit leaders, manufacturers, and industry professionals gathered in Chicago to explore new technologies, share ideas, and discuss the future of public transportation.
Read More →
More Than a Summer Job: Building the Next Generation of Transit Talent
The Delaware River Port Authority and PATCO have transformed their internship program into a hands-on professional development experience that introduces students to the breadth of transportation careers — and creates a pipeline for future employees.
Read More →
LA Metro Board Awards 220 Battery-Electric Bus Contract to ENC
The contract, which is the largest base award of battery-electric buses by a U.S. transit agency, will be built in Southern California, sustaining good jobs as LA prepares to welcome the world in 2028
Read More →
Public Transit Conference Returning to GFX in 2027, Call for Papers Now Open
The Call for Papers is now open, allowing transit agency professionals and industry experts to help shape the PTC educational program by submitting session ideas for consideration.
Read More →