METRO Magazine Logo
MenuMENU
SearchSEARCH

MCTS CONNECT Enters Final Construction Stage

The BRT line, called MCTS CONNECT, begins service on June 4, 2023.

MCTS CONNECT Enters Final Construction Stage

The dedicated bus lanes, a collaboration between MCTS and the City of Milwaukee, are a component of the modernized transit route.

Photo: MCTS

3 min to read


Milwaukee County’s first Bus Rapid Transit (BRT) line enters the final construction stage with the painting of dedicated lane stripes, according to MCTS's news release. 

The dedicated bus lanes, a collaboration between MCTS and the City of Milwaukee, are a component of the modernized transit route.

Ad Loading...

MCTS battery-electric buses will deliver service, with 10-minute headways at peak times along the route.

The BRT line, called MCTS CONNECT, begins service on June 4, 2023.

The CONNECT 1’s nine-mile route is nearly an even 50/50 split between dedicated lanes and mixed traffic from Downtown Milwaukee to the Milwaukee Regional Medical Complex in Wauwatosa.

The dedicated bus lanes are along the right travel lane of the eastern portion of the route, on Wisconsin Avenue from Hawley Road to 8th Street and Plankinton Avenue to Cass Street.

“Modernizing public transit through the BRT has taken nearly five years to achieve,” said Denise Wandke, MCTS president and interim managing director. “We’re excited to introduce Milwaukee County to this enhanced travel experience. Dedicated bus lanes are proven to increase safety for not only buses and cars but for pedestrians and cyclists, too.” 

Ad Loading...

Lane installation begins this Tuesday, weather permitting, and will continue for three to four weeks.

The lanes will be designated using pavement markings and permanent signage. Access will be maintained to parallel parking and driveways. After yielding to buses, motorists will be permitted to enter the dedicated bus lane for right turns and parallel park in designated areas. Motorists are not allowed to travel in the dedicated bus lanes, but cyclists are.

How to Use Dedicated Bus Lanes

To keep traffic running smoothly, MCTS said motorists, cyclists, and pedestrians should follow these guidelines:

For motorists:

  • After yielding to the bus, motorists may access the dedicated bus lanes to access driveways and designated parallel parking.

  • After yielding to the bus and obeying pavement markings (dashed striping), motorists may access the dedicated bus lanes to make right turns at intersections.

  • When parking in designated parking areas, make sure your entire vehicle, including side mirrors, is inside the parking lane, and use caution when opening doors as buses, bikes, and vehicles could be approaching from behind you.

  • Never park your vehicle in the bus-only lane, even temporarily.

Ad Loading...

For pedestrians: 

  • Only cross the dedicated bus lanes at designated crosswalks, wait for the appropriate signals, and look in all directions before crossing the dedicated bus lanes.

  • Never cross or run in front of an approaching bus and avoid entering the dedicated bus lane from between two parked vehicles.

  • Take a break from your electronic devices. Remove your headphones so you can hear traffic in the dedicated bus lane, and don’t walk and text when crossing the BRT route.

For cyclists: 

  • Cyclists are allowed to travel in the dedicated bus lane.

  • Be aware of approaching vehicles.

  • Use hand signals to indicate turning.

Topics:MCTSBRTBus

More Bus

A MARTA articulated bus.
Busby StaffFebruary 13, 2026

Atlanta's MARTA Sets Date for 'A-Line' BRT Launch

The five-mile Rapid A-Line connects Downtown Atlanta to Capitol Gateway, Summerhill, Peoplestown, and the Beltline’s Southside Trail.

Read More →
A Picture of Ster Seating's Parent/Child transit seating product.
Technologyby StaffFebruary 10, 2026

Ster Seating, Maryland Transit Launch First Parent/Child Transit Seat in North America

The configuration uses Ster Seating's Gemini seat platform to create a family-friendly floor layout specifically engineered to accommodate parents traveling with young children.

Read More →
Rendering of Sound Transit's Renton Transit Center
Busby StaffFebruary 5, 2026

Seattle’s Sound Transit Breaks Ground on New Transit Center

The Renton Transit Center project will relocate and rebuild the Renton Transit Center to better serve the regional Stride S1 line, local King County Metro services, and the future RapidRide I Line.

Read More →
Ad Loading...
David Carol, Baker Alloush, and Jesse Lazarus from METRO's People Movement February 4 edition.
Managementby Staff and News ReportsFebruary 4, 2026

New Rolling Stock Strategy Lead at New York MTA and More in People Movement

In this edition, we cover recent appointments and announcements at HDR, NCTD, STV, and more, showcasing the individuals helping to shape the future of transportation.

Read More →
Railby StaffFebruary 2, 2026

Chicago Region Transit Ridership Grows in 2025

The region’s fixed-route system finished out the year with a total of 373.5 million rides. Adding 12.3 million rides over 2024 represents an increase that is equal to the annual transit ridership of Kansas City.

Read More →
King County Metro electric buses made by GILLIG.
Busby StaffJanuary 30, 2026

Seattle's King County Metro Introduces New Battery-Electric Buses

Rolling out in electric yellow and seafoam blue, the first battery-electric buses purchased from GILLIG will begin serving riders in south King County on February 2.

Read More →
Ad Loading...
Managementby StaffJanuary 29, 2026

Valley Metro Sees Strong Ridership Growth in 2025

The agency ranked top five among mid-sized U.S. transit systems, defined as agencies with 15 million to 50 million annual trips.

Read More →
Busby StaffJanuary 29, 2026

Subway Customer Satisfaction Reaches Record High, New York MTA Says

The subway system saw increases across all key metrics, with 62% of subway riders reporting they feel satisfied with the system overall.

Read More →
Busby StaffJanuary 28, 2026

New Orleans RTA Reaches Agreement with ATU

The agreement provides competitive wages and reflects strong labor-management collaboration, positive working relationships, and a shared commitment to building a world-class transit system for the community, said RTA CEO Lona Edwards Hankins.

Read More →
Ad Loading...
Two ABQ RIDE busses at an intersection by Gold street in front of a parking structure.
Busby StaffJanuary 27, 2026

ABQ RIDE Launches Campaign to Bring Riders Back to the Bus

A new citywide campaign highlights free fares, improved service, and major upgrades to Albuquerque’s bus system.

Read More →