METRO Magazine Logo
MenuMENU
SearchSEARCH

San Diego MTS Approves New All-Electric Bus Route

Service is anticipated to begin as early as this fall.

San Diego MTS Approves New All-Electric Bus Route

Rapid 227 will provide a battery-electric operated Rapid service in San Diego’s South Bay.

Photo: San Diego MTS

2 min to read


The Metropolitan Transit System (MTS) announced its board of directors approved Rapid 227 (Iris Rapid) as part of the region’s growing Bus Rapid Transit (BRT) network. 

Service is anticipated to begin as early as this fall, according to MTS' news release.

Ad Loading...

Rapid 227 will provide a battery-electric operated Rapid service in San Diego’s South Bay, linking the Otay Mesa Transit Center to neighborhoods along the Imperial Beach shores. The future route will also connect riders with the UC San Diego Blue Line Trolley at the Iris Avenue Transit Center.

“The beginning of the region’s first electric Rapid route is a huge leap forward towards a greener future, environmental justice, sustainability, and better air quality,” said Nathan Fletcher, MTS Board chair. “When Iris Rapid is in full operation, MTS will have 25 electric buses operating in its fleet, with hundreds more on the way. This will be a great milestone to reach as we transition to an all-zero emissions bus fleet by 2040.”

Powering Rapid 227 are 12 60-foot battery-electric buses provided by New Flyer of America Inc. (New Flyer). New Flyer has supplied more than 600 buses to MTS in the past 30 years. The new battery-electric buses are currently in various stages of production and will soon begin arriving in San Diego.

“Our binational region will benefit greatly with the addition of Iris Rapid,” said Vivian Moreno, MTS Board member. “In 2021, 2.1 million pedestrians crossed the border northbound at the Otay Mesa Port of Entry. Thousands of those commuters use our bus system daily to get to jobs and education opportunities. Iris Rapid will reduce emissions, speed up trips, offer better amenities, and provide longer spans of service. This is the type of bus service that both South Bay and Baja residents deserve.”

The new electric buses serving Rapid 227 will be stationed out of the agency’s bus facility in Chula Vista. At this bus division, MTS is finalizing construction of a new $8.5 million overhead gantry charging system capable of charging 24 battery-electric buses at a time and will be expandable to add more charging capacity as MTS transitions to an all-electric fleet in the coming years.

Ad Loading...

The total cost of the Rapid 227 project is $37 million to purchase the 12 battery-electric buses and add the necessary infrastructure. Funding came from a mix of California Transit and Intercity Rail Capital Program and Low Carbon Transit Operations Program grants, and MTS’s Capital Improvement Program.

More Bus

Rendering of the upgraded Derby-Shelton Train Station
Busby StaffMay 4, 2026

CTDOT Launches Four-Station Upgrades on Waterbury Line

Construction on all four stations is beginning now and is anticipated to be completed by spring 2028.

Read More →
East Colfax BRT
Busby StaffMay 4, 2026

Denver RTD breaks ground on Aurora segment of East Colfax BRT

The beginning of the final BRT segment advances construction across all five segments, reflecting steady progress toward shorter travel times, improved accessibility, and a more dependable connection to jobs, businesses, and community destinations.

Read More →
A VIA bus
Busby StaffMay 1, 2026

San Antonio's VIA Launches Next Round of Bus Improvements

The changes are designed to reduce overall travel time, shorten wait times, and get customers to their destinations more quickly.

Read More →
Ad Loading...
Federal Reserve Bank visiting ENC
Busby StaffMay 1, 2026

Fed Leaders Highlight Growth, U.S. Manufacturing at ENC

The visit is part of the SF Fed's ongoing engagement with major employers and industries across Southern California and, more broadly, the western U.S. to better understand regional economic conditions and business outlooks.

Read More →
A person working on a bus
ManagementMay 1, 2026

Data-Driven Maintenance: Focusing Effort Where It Matters Most

Advances in data and analytics are giving transit agencies new opportunities to refine maintenance practices, improve efficiency and make more informed decisions about asset performance.

Read More →
frontrunner bus
SponsoredMay 1, 2026

ADA Compliant Transit: Easier, More Dignified Travel for Every Passenger

Today’s riders—and the communities you serve—expect more from public transit. While ADA compliance is required, leading transit agencies know that true accessibility also means delivering dignity, efficiency, and a better rider experience. This whitepaper reveals why forward thinking agencies nationwide choose the Low Floor Frontrunner as their first choice for ADA compliant vehicles—setting a new standard with passenger first design, faster boarding, improved safety, and unmatched operational performance.

Read More →
Ad Loading...
Cover photo for Part 2 with Cecil Blandon
Managementby Alex RomanApril 30, 2026

Bus Tech Talk: Part 2 with AC Transit’s Cecil Blandon

In Part 2 of a two-part conversation, AC Transit’s director of maintenance joins co-hosts Alex Roman and Mark Hollenbeck to discuss his maintenance team’s work with various types of vehicle, training, augmented reality, and more.

Read More →
A Valley Metro bus
Managementby StaffApril 28, 2026

Keolis Contract Extended for Valley Metro's East Valley Fixed-Route Bus Service

Under this extension, Keolis will continue to manage and operate fixed-route bus service across the East Valley, serving communities including Tempe, Mesa, Chandler, Scottsdale, the town of Gilbert, parts of Phoenix, and the Gila River Indian Community.

Read More →
A Des Moines DART bus
Busby StaffApril 28, 2026

Iowa DART Prepares for June Bus Network Launch

The new network reflects extensive input from riders and the community through Reimagine DART on what matters most in public transit — and those priorities are reflected in the changes ahead.

Read More →
Ad Loading...
A Route 8 bus travels on Denny Way in congested traffic.
Busby StaffApril 24, 2026

Seattle Speeds up Service on Denny Way

A new bus lane project aims to improve reliability on one of King County Metro’s busiest and most congestion-prone corridors.

Read More →