METRO Magazine Logo
MenuMENU
SearchSEARCH

New England Wheels' low-floor minibus aces Altoona testing

The 22-foot, 15-passenger true low-floor Frontrunner achieved a score of 91 on the new pass/fail test implemented in 2017.

June 26, 2018
New England Wheels' low-floor minibus aces Altoona testing

The multi-patented design and construction utilizes the Ram Promaster 3500 cutaway for the drive-train and is joined to a purpose built lowered-floor platform made from high strength lightweight steel.

New England Wheels

3 min to read


The multi-patented design and construction utilizes the Ram Promaster 3500 cutaway for the drive-train and is joined to a purpose built lowered-floor platform made from high strength lightweight steel. New England Wheels

New England Wheels Inc. announced the Federal Transit Administration (FTA) issued its official report for the company’s next generation lowered-floor minibus — the Frontrunner. The 22-foot, 15-passenger true low floor achieved a score of 91 on the new pass/fail test implemented in 2017.

“The test validates the design goal that a front wheel drive sub 10,000 GVWR low floor can be lightweight, fuel efficient, user friendly, and durable to address the growing demand for low-floor accessibility in this size class” said Paul LaRose, president/CEO of New England Wheels.

Ad Loading...

While the pass/fail test at Altoona allowed for 125 hours of downtime due to mechanical failure, the Frontrunner was charged with only one hour, explaining its high score in the most demanding portion of the durability test. “We had no failures in our air suspension and no structural issues with our high strength lightweight steel frame during the test,” said LaRose. “The Frontrunner really proved it is ‘The Little Bus That Could.’”

The multi-patented design and construction utilizes the Ram Promaster 3500 cutaway for the drive-train and is joined to a purpose built lowered-floor platform made from high strength lightweight steel. The entire lowered floor chassis is fully galvanized for superior corrosion resistance and longevity. The bus structure utilizes a patented composite wall structure for superior strength and durability.

“The front-wheel drive platform allowed us to build a lowered floor bus that is truly flat at the entrance unlike the rear wheel drive alternatives that rely on a sloped floor to clear the rear wheel drive components” remarked LaRose. “In addition, a simple fold-out ramp and full width transit door makes the Frontrunner the only lowered floor minibus in its size class built in the true likeness and utility of a larger 40-foot transit bus.”

“We are looking at an electric version of the Frontrunner” added LaRose. “Right now, the Frontrunner offers a much greener, fuel efficient, user friendly alternative to technologies that are still in the development phase but have been released because of what they promise to offer. Compared to a traditional cutaway powered by large inefficient V-8’s, three difficult steps to enter, and a side mounted lift, the Frontrunner is a more economical choice when looking at the total cost of ownership and the rider experience.”

The Frontrunner meets or exceeds all applicable FMVSS standards, is Buy America compliant, and is represented by a growing national network of dealers. It has also been approved by the GSA under its 23V-New Technology program for purchase by government agencies. New England Wheels has been structurally modifying vans for over three decades. “We’ve taken the feedback from our customers, the knowledge we’ve gained over the years, our experience with troublesome wheelchair lifts, and built the next generation of lowered floor non-CDL commercial transportation in a smaller vehicle” remarked LaRose.

More Bus

The groundbreaking event for St. Cloud, Minnesota's Metro Bus facility.
Busby StaffMay 13, 2026

Minnesota's Metro Bus Breaks Ground on New Transit Facility

The new facility will augment the current Metro Bus Transit Center and overall system as part of new routes and service improvements known as Metro Bus Forward.

Read More →
An NJ TRANSIT bus.
Managementby StaffMay 13, 2026

NJ TRANSIT to Expand Cleanliness, Safety, and Accessibility Under New Action Plan

The plan includes investments in cleaner vehicles and upgraded stations, NJT LiveView to provide real-time GPS tracking of train and light rail service, enhanced safety initiatives through a new Real Time Crime Center, and the debut of a redesigned NJ TRANSIT mobile app.

Read More →
Mayor Tim Keller in front of an ABQ RIDE microtransit vehicle
New Mobilityby StaffMay 12, 2026

ABQ RIDE Forward's Next Phase Sets Target Date

ABQ RIDE Forward is the first transit system overhaul in more than 25 years. This latest phase marks 15% completion of the 16-phase rollout, which will continue over the next several years.

Read More →
Ad Loading...
METRO Biz Briefs cover photo

STV Launches Power Practice and More in Biz Briefs

In METRO's latest installment, we take a look at the latest news from SilverRide, Complete Coach Works, and more.

Read More →
Cover for Part 2 with AC Transit's Cecil Blandon
ManagementMay 8, 2026

Bus Tech Talk: Part 2 with AC Transit's Cecil Blandon

In Part 2 of a two-part conversation, AC Transit’s director of maintenance joins co-hosts Alex Roman and Mark Hollenbeck to discuss his maintenance team’s work with various types of vehicle, training, augmented reality, and more.

Read More →
Maintenance officials examining a vehicle on a lift.
Managementby Alex RomanMay 8, 2026

Avoiding Mid-Season Breakdowns: A Fleet Readiness Q&A

John Hatman, COO of Master’s Transportation, breaks down the priorities, warning signs and common mistakes fleet managers should address now to stay ahead of summer demand.

Read More →
Ad Loading...
SEPTA's advertisement for multi-rider feature.
Technologyby StaffMay 7, 2026

Philadelphia's SEPTA Introduces Multi-Rider Feature for Contactless Payments

Up until now, this feature was only available when using a SEPTA Key card.

Read More →
Rendering of the upgraded Derby-Shelton Train Station
Busby StaffMay 4, 2026

CTDOT Launches Four-Station Upgrades on Waterbury Line

Construction on all four stations is beginning now and is anticipated to be completed by spring 2028.

Read More →
East Colfax BRT
Busby StaffMay 4, 2026

Denver RTD breaks ground on Aurora segment of East Colfax BRT

The beginning of the final BRT segment advances construction across all five segments, reflecting steady progress toward shorter travel times, improved accessibility, and a more dependable connection to jobs, businesses, and community destinations.

Read More →
Ad Loading...
A VIA bus
Busby StaffMay 1, 2026

San Antonio's VIA Launches Next Round of Bus Improvements

The changes are designed to reduce overall travel time, shorten wait times, and get customers to their destinations more quickly.

Read More →