NJ TRANSIT Adding 8 More Bombardier Locomotives
The new dual-power locomotives will meet current EPA Tier IV requirements, reducing emissions when operating in diesel mode and running emission-free when operating in electric mode.

Over the years, Bombardier has provided more than 100 electric and dual-power locomotives, hundreds of push-pull commuter coaches and 429 MultiLevel I and II vehicles to NJ TRANSIT.
Bombardier
New Jersey Transit Corp. (NJ TRANSIT) exercised an option for eight additional Bombardier ALP-45 dual-power locomotives. This is NJ TRANSIT’s fourth order for this locomotive type and is based on a contract signed in 2008. NJ TRANSIT will now own 60 of these locomotives.
The new dual-power locomotives will meet current EPA Tier IV requirements, reducing emissions when operating in diesel mode and running emission-free when operating in electric mode. They will also offer a significant increase in horsepower, acceleration, and available head-end power over the units they will be replacing. The units can operate under both diesel power and alternating current electric power from overhead lines. Their flexible power system enables the locomotives to operate across the entire NJ TRANSIT rail system, which includes both electrified and non-electrified lines, thus allowing passengers to travel between New Jersey and New York City’s Penn Station without having to change trains. Deliveries are scheduled for 2022.
Over the years, Bombardier has provided more than 100 electric and dual-power locomotives, hundreds of push-pull commuter coaches and 429 MultiLevel I and II vehicles to NJ TRANSIT. Last year, NJ TRANSIT awarded Bombardier a contract for 113 MultiLevel III commuter railcars, the latest generation of these popular vehicles, featuring new amenities designed to enhance the customer experience. In addition, Bombardier was a member of the consortium that designed and built NJ TRANSIT’s turnkey River LINE light rail system between Camden and Trenton, N.J., and now operates and maintains the system under a contract with NJ TRANSIT.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →