METRO Magazine Logo
MenuMENU
SearchSEARCH

Q'Straint unveils 3-point wheelchair securement station

The Q’UBE 3-Point Securement Station features an innovative sliding bumper that provides critical stabilization and tip-over prevention that the ADA requires for 3-Point securement.

September 11, 2013
2 min to read


Q’Straint announced today the availability of a new Q’UBE 3-Point Securement Station that features an innovative sliding bumper that provides critical stabilization and tip-over prevention that the ADA requires for 3-Point Securement. It was designed for transit operators that need to maintain maximum passenger seating capacities in 2+2 seating layouts: A 2-passenger forward facing flip seat combined with a 2-passenger aisle facing flip seat.
 
The Q’UBE 3-Point was designed as a fully adaptable, complete bolt-in solution that can be mounted for many vehicle applications without the need to run cables or wires. The user-friendly design helps operators maintain schedules and reduce dwell times on fixed-route buses by integrating a single-motion mechanical delay release that significantly reduces wheelchair securement time and effort. A wide assortment of brackets and occupant solutions were developed to ensure that Q’UBE 3-Point is adaptable to virtually any fleet.
 
“Our goal with the Q’UBE 3-Point was efficiency: preserving seating capacities with a minimum footprint, easy installation and offering a cost-effective solution,” said Bob Joseph, Q’Straint VP of business development. “It required some clever new patent-worthy engineering to achieve an ADA approved 3-point securement in such a compact space.”
 
With 3-passenger aisle-facing securements (such as the Q’POD), there is sufficient length for Q’Straint’s patented stabilization bumper — a proven design that acts as the fourth contact point and prevents tip-overs. In 2-Flip seats, it was necessary to develop a sliding bumper that can be extended beyond the width of the seats to assure proper securements, yet stows out of the way when not in use. A front tensioner features a J-hook and scooter ring that combine to safely secure the wheeled mobility device against the bumper. This cost-effective system simplifies installation and optimizes seating capacity.
 
“Several transit properties that had selected Q’POD for all their new vehicles were looking for a solution that could be retrofitted into existing buses running high-capacity routes,” said Q’Straint Sales Director Jim Reaume. “By trickling down some of our high-end technology to this modular retrofit, we are able to provide a system that satisfies the customer needs of cost and space efficiency.”
 
The Q’UBE 3-Point features include:
-       A sliding bumper that is either hand or foot operated reducing operator bending and injury potential
-       Heavy-duty stainless steel construction that is durable and corrosion resistant
-       Rubber surfaced stabilization bumper that securely grips the wheels of mobility devices
-       A popup hand lever that stores out of the way when not in use
-       Recirculating ball bearing design for heavy-duty strength and smooth operation
-       Automatic return of the sliding bumper to the storage position with a touch of the release lever

More Paratransit

MTA Advances Accessibility Improvements in Brooklyn
Paratransitby StaffJune 17, 2026

New York MTA Leverages Zoning Program to Advance Station Accessibility

Accessibility enhancements at Nevins St Station will be financed through a development agreement tied to the MTA's Zoning for Accessibility initiative.

Read More →
A maintenance person with a tablet.
ManagementJune 5, 2026

Reinventing Fleet Maintenance with Real-time Visibility and AI

Transit leaders need to know what needs fixing, where to look, who is responsible, when work is completed, and what it costs without having to chase information across disconnected systems.

Read More →
SamTrans planning for ballot measure
Managementby StaffJune 4, 2026

SamTrans Sets Priorities for Potential Connect Bay Area Revenue

The board-approved framework allocates future funding to maintaining service, rider improvements, equity initiatives, and infrastructure repairs.

Read More →
Ad Loading...
Managementby StaffJune 1, 2026

Chicago's NITA Act Moves Into Next Phase as Service Improvements Begin

Rider-focused improvements will begin rolling out across the system immediately as CTA, Metra, and Pace increase service this summer in the six-county region.

Read More →
thumbnail for 2026 METRO Buyer’s Guide & Directory
SponsoredMay 27, 2026

2026 METRO Buyer’s Guide & Directory

Searching for the right vehicles, technology, equipment, or services for your public transit or motorcoach operation? This industry guide brings together manufacturers and suppliers from across the transportation market — all in one place. Download it to connect with the companies that help agencies and operators improve mobility, enhance operations, and move their organizations forward.

Read More →
Emily DeVito and her children
Managementby Alex RomanMay 26, 2026

Rays the Mark Foundation to Honor CDTA’s Emily DeVito at October Fundraiser

Event at Chicago-area Ravisloe Country Club will support DeVito, a transit employee and mother of twins battling kidney failure and awaiting a transplant.

Read More →
Ad Loading...
A Heliox charger on KC Metro property

King County Test Heliox Chargers, Keolis Lands California Contract Top Biz Briefs

Stay informed with these quick takes on the projects and companies driving progress across the transportation landscape.

Read More →
Spare logo for Fixed Route Platform
Technologyby StaffMay 19, 2026

Spare Expands AI-Native Operations Platform With Fixed-Route Capabilities

The launch marks a major milestone in Spare’s vision for unified transit operations.

Read More →
Trinity Metro On Demand Vehicle
Technologyby StaffMay 19, 2026

Via Announces Scheduling and Supply Studio

The Scheduling and Supply Studio provides the world’s first fully integrated platform for optimizing vehicle and driver availability to rider demand, said company officials.

Read More →
Ad Loading...
MBTA Green Line Construction
Railby StaffMay 18, 2026

Boston's MBTA Completes Latest Green Line Work

The work took place during 12 consecutive days of shuttle bus service replacement between Kenmore and Cleveland Circle. 

Read More →