METRO Magazine Logo
MenuMENU
SearchSEARCH

Thermo King unveils new split system solution at BusCon

The BE-550 lightweight bulkhead evaporator is ideal for small- to mid-size bus users such as transit authorities, airport shuttle services and school bus fleets. Three-speed blowers provide optimal pull-down on the evaporator to maximize passenger comfort.

September 10, 2012
Thermo King unveils new split system solution at BusCon

 

3 min to read


Thermo King is unveiling the new BE-550 lightweight bulkhead evaporator for small- to mid-size shuttle and school bus applications to help ensure passenger comfort in vehicles where headroom clearance is an issue.

Thermo King, a manufacturer of transport temperature control systems for a variety of mobile applications and a brand of Ingersoll Rand, is introducing this solution at BusCon 2012, in booth 1006. It will be available to original equipment manufacturer installers in the first quarter of 2013.

The new bulkhead evaporator is a split system solution that can be mounted in the front, rear, or both bulkhead areas of a vehicle. In general, this unit offers advantages over similar industry solutions that include:

•    Approximately 40% smaller by volume and more than 20% lighter in weight;

•    Approximate airflow improvement of more than 5%; and,

•    Approximately 20% greater in capacity.

“The updated evaporator responds to customer requests for an HVAC system that keeps passengers comfortable in ambient conditions, while not intruding into the cabin space to avoid headroom clearance issues,” said Doug Lenz, director of product management and marketing for Thermo King. “Thermo King engineers concentrated on reducing the unit footprint and weight, while increasing the airflow and cooling performance to produce a lightweight solution that maximizes performance.”

The new bulkhead evaporator is ideal for small- to mid-size bus users such as transit authorities, airport shuttle services and school bus fleets. Three-speed blowers provide optimal pull-down on the evaporator to maximize passenger comfort. The blowers and the return-air filter are easily accessible to allow for efficient maintenance.

The evaporator can accommodate either right-side or left-side refrigeration and electrical connections. It features a flexible mounting arrangement and is compatible with skirt-mount and roof condensers.

Thermo King will also feature the SA-600 skirt-mounted condenser and evaporator solution in its booth that was introduced at BusCon last year. The solution is now available in two new offerings: the SA-400 skirt-mounted condenser and evaporator, designed for smaller shuttle bus applications and the SA-800 evaporator, designed for the largest shuttle bus applications.

The SA-800 evaporator features dual refrigeration circuits, providing a redundant air conditioning loop to maximize uptime.

The SA series of systems was designed to significantly reduce maintenance time while offering increased performance and energy efficiency. The condensers feature micro-channel coils in lieu of standard fin-and-tube designs for increased performance and a refrigerant charge which is 66% lower than previous versions offered by Thermo King.

The total system charge reduction for the units is estimated at 30% due to the micro-channel condensers. The height of the skirt-mounted condensers is reduced by approximately 17%, which allows for increased ground clearance.

The condenser designs provide optimized fan placement for improved airflow through the coils. The filter/drier in the condensers is mounted in an easy-to-access location. The evaporator blowers can be replaced quickly without having to remove the entire unit cover or blower frame assemblies. The return air filter is located at the rear of the evaporator section in a swing-out frame for replacement in seconds.

All of these systems are compatible with the slim-line condenser system which was released last year. The condenser provides the industry’s most compact solution and the lowest profile, measuring just six inches above the roof.

Rooftop placement of the condenser reduces installation time and lessens refrigerant charge because it can be installed directly above the evaporator toward the rear of the vehicle. Reduced hose and harness lengths and the solution’s modular design also contribute to reduced installation time. Placing the condenser on the rooftop instead of in the traditional skirt location also removes it from exposure to road heat and debris, and reduces the chance of collision damage.

All SLR, SA and BE series systems are available with three different controllers: Standard, the ClimaAire 1D with diagnostics, and the Intelligaire III microprocessor with advanced diagnostics and J1939 CANBus communication capability. The SA-400, SA-600, SA-800, and BE-550 are all manufactured in the United States to allow for a minimal lead-time and to ensure that they meet all Buy America requirements.

More Bus

paratransit bus
SponsoredMarch 16, 2026

Measuring the True Cost of Paratransit Fleets

What truly drives the cost of a paratransit fleet? Beyond the purchase price, seven operational factors quietly determine maintenance frequency, downtime, and long-term service reliability. This whitepaper explores how these factors shape lifecycle cost and what agencies should evaluate when selecting paratransit vehicles.

Read More →
Cover photo for METROspectives with The Bus Coalition
Busby Alex RomanMarch 13, 2026

Inside The Bus Coalition’s Push for Stronger Federal Transit Investment

In this conversation, TBC’s Executive Director Ed Redfern, President Corey Aldridge, and Washington Representative Joel Rubin outline the coalition’s key policy priorities, the challenges facing transit agencies, and how industry stakeholders can work together to strengthen the voice of bus transit at the federal level.

Read More →
Cover photo for Biz Briefs dated March 6, 2026
Technologyby Staff and News ReportsMarch 6, 2026

Biz Briefs: Tolar Manufacturing Supports PSTA Spark Service and More

Stay informed with these quick takes on the projects and companies driving progress across the transportation landscape.

Read More →
Ad Loading...
Passengers boarding a PRT bus
Busby StaffMarch 2, 2026

Pittsburgh Unveils 'Bus Line Refresh' Plan

Originally introduced in 2023 as the Bus Line Redesign, the effort has evolved into a more targeted update that maintains familiar routes while improving reliability, frequency, evening and weekend service, and connections across Allegheny County.

Read More →
Stickers and a paper bus for S3 bus line
Busby StaffMarch 2, 2026

Seattle's Sound Transit Breaks Ground on S3 Bus Line

S3 will connect communities along SR 522 with fast, reliable, battery-electric bus service from Shoreline South Station to Bothell via Kenmore and Lake Forest Park. 

Read More →
PRT bus stop with articulated bus.
Busby StaffFebruary 20, 2026

Pittsburgh Regional Transit Announces All-Door Boarding on the University Line

All-door boarding will allow passengers to pay while entering the front, middle, or rear doors of the University Line’s 60-foot articulated buses.

Read More →
Ad Loading...
Patrick Scully, president at Complete Coach Works.
Managementby StaffFebruary 18, 2026

Complete Coach Works Names Patrick Scully President

He succeeds the company founder, Dale Carson, who remains chairman of the board. 

Read More →
A MARTA articulated bus.
Busby StaffFebruary 13, 2026

Atlanta's MARTA Sets Date for 'A-Line' BRT Launch

The five-mile Rapid A-Line connects Downtown Atlanta to Capitol Gateway, Summerhill, Peoplestown, and the Beltline’s Southside Trail.

Read More →
A Picture of Ster Seating's Parent/Child transit seating product.
Technologyby StaffFebruary 10, 2026

Ster Seating, Maryland Transit Launch First Parent/Child Transit Seat in North America

The configuration uses Ster Seating's Gemini seat platform to create a family-friendly floor layout specifically engineered to accommodate parents traveling with young children.

Read More →
Ad Loading...
Rendering of Sound Transit's Renton Transit Center
Busby StaffFebruary 5, 2026

Seattle’s Sound Transit Breaks Ground on New Transit Center

The Renton Transit Center project will relocate and rebuild the Renton Transit Center to better serve the regional Stride S1 line, local King County Metro services, and the future RapidRide I Line.

Read More →