METRO Magazine Logo
MenuMENU
SearchSEARCH

UTC fuel cell reaches durability milestone

Three of AC Transit’s buses are equipped with the fuel cell systems and have now traveled more than 213,000 miles, with an average fuel economy that is 65 percent better than the control fleet of diesel buses running the same routes and duty cycles.

January 13, 2010
1 min to read


On Wednesday, UTC Power, a United Technologies Corp. announced one of its latest generation PureMotion Model 120 fuel cell powerplants for hybrid-electric transit buses has surpassed 5,000 operating hours in real-world service with its original cell stacks and no cell replacements. This powerplant is aboard an Alameda-Contra Costa Transit District (AC Transit) bus operating in the Greater Oakland, Calif. area.

 

Three of AC Transit’s buses are equipped with the fuel cell systems and have now traveled more than 213,000 miles, with an average fuel economy that is 65 percent better than the control fleet of diesel buses running the same routes and duty cycles.

Ad Loading...

 

UTC Power has provided fuel cell power plants for fleet transportation since 1998 and its fuel cells have powered buses in the U.S., Spain, Italy and Belgium. The company’s latest-generation proton exchange membrane (PEM) fuel cell system has delivered more than 350,000 miles of commercial service for city transit bus fleets.

 

Topics:Bus

More Bus

FlixBus vehicles in a parking garage.
ManagementApril 13, 2026

Intercity Bus Industry Outlook: A Mix of Apprehension & Optimism

Industry leaders see both promise and peril ahead as intercity bus travel rebounds, but unpredictable market forces threaten to reshape the sector.

Read More →
Cover Photo for Bus Tech Talk
ManagementApril 9, 2026

Bus Tech Talk: AC Transit’s Cecil Blandon on Leadership, Mentorship, and a Career in Transit

In Part 1, Blandon shares his journey from the U.S. Marines to a leadership role in public transit, along with insights on mentorship and professional growth within the industry.

Read More →
A blurry TransLink R2 rapid bus
Managementby StaffApril 8, 2026

Vancouver's TransLink Fast-Tracks RapidBus Line to Metrotown

Funded through the 2025 Investment Plan, the new R2 Marine–Willingdon RapidBus is expected to begin service in September, more than three months ahead of schedule.

Read More →
Ad Loading...
Complete Parts logo
Busby StaffApril 1, 2026

Complete Coach Works Unveils Reimagined Parts Department with Expanded Capabilities

Complete Parts features new branding with a new logo, a new contact telephone number, a dedicated order desk, enhanced processes and inventory, all designed to provide the parts bus operations need.  

Read More →
frontrunner bus
SponsoredApril 1, 2026

Breaking Accessibility Barriers with the Low Floor Frontrunner Minibus

Accessible transit isn’t a feature—it’s a responsibility. This whitepaper explores how the Low-Floor Frontrunner is redefining mobility with a breakthrough design that removes barriers, empowers riders, and delivers measurable operational advantages for agencies. Discover why this next generation minibus is setting a new standard for inclusive transportation.

Read More →
A shot of ENC's manufacturing facility
Busby StaffMarch 31, 2026

ENC Named 'Partner of Choice' to Support Philadelphia SEPTA’s $43M FTA Grant

SEPTA was awarded $43 million in competitive grant funding from the FTA's FY25 Low and No Emission and Bus and Bus Facilities grant programs to support this procurement.

Read More →
Ad Loading...
Cover photo for Bus Tech Talk with Cecil Blandon
Managementby Alex RomanMarch 27, 2026

AC Transit’s Cecil Blandon on Leadership, Mentorship, and a Career in Transit

In part 1 of a two-part conversation, AC Transit’s director of maintenance joins co-hosts Alex Roman and Mark Hollenbeck to discuss his journey from the U.S. Marines to public transit and the role mentorship plays in developing the next generation of industry leaders.

Read More →
An MBTA bus with a passenger boarding at shelter.
Busby StaffMarch 27, 2026

MBTA Confirms Funding for Upgraded Arborway Bus Facility

When construction is complete, battery-electric buses will operate from the Arborway facility on Day One, providing cleaner, quieter, and more reliable service for riders, the MBTA said. After completion, the old facility will be demolished, and the land will be made available for redevelopment.

Read More →
Nadine S. Lee
Managementby StaffMarch 26, 2026

DART's President/CEO Announces Departure from Agency

Nadine S. Lee, who has served as president/CEO since July 2021, said the decision comes after careful reflection on the agency’s progress and its path forward.

Read More →
Ad Loading...
Assemblywoman Castillo and ENC officials at California facility.
Busby StaffMarch 23, 2026

ENC Hosts California Assemblywoman, Celebrates American Manufacturing and Economic Growth

The visit underscored ENC's role as a major employer in Assembly District 58 and its commitment to American manufacturing and skilled local jobs.

Read More →