MARTA Announces $100 Million Increase to Atlanta Affordable Housing, TOD
Wabtec to Improve MARTA Passenger Comfort
Wabtec will provide 336 HVAC units, as 224 will be installed in passenger cars and 112 units in driver cabins.

The MARTA rail network consists of four heavy rail lines.
Photo: MARTA
Wabtec Corporation announced a contract to supply heating, ventilation, and air conditioning (HVAC) units for 56 new Stadler trains that will be operated by the Metropolitan Atlanta Rapid Transit Authority (MARTA).
The systems will provide passengers with a comfortable commute.
“We are proud to be supporting the fleet renewal for Atlanta’s public transit system and expand our transit operations in the United States,” said Pino Cordini, Managing Director for Wabtec’s Transit segment. “Our service-proven HVAC system will improve the passenger experience by providing a comfortable cabin environment on MARTA trains regardless of extreme seasonal temperature.”
Under this contract, Wabtec will provide 336 HVAC units, as 224 will be installed in passenger cars and 112 units in driver cabins.
The flat, double-sided roof units are designed to be mounted in the middle of cars and have air handling on each side. This design provides additional cooling and heating capacity.
The HVAC order represents the latest chapter in Wabtec’s collaboration with Stadler and marks the first subway order with the car builder in the U.S. In the updated agreement, initially signed in 2019, Stadler will supply 56 CQ400 trainsets with four cars each. The trains will be assembled at the Stadler plant in Salt Lake City.
“Public transport projects in U.S. cities are increasing,” added Cordini. “Wabtec is proud to leverage its global expertise help deliver safe, comfortable transit systems to the metro Atlanta region.”
The MARTA rail network consists of four heavy rail lines. The Blue and Green lines travel east-west, while the Red and Gold lines form a north-south axis. With 38 stations spread across 48 miles (77 km) of lines, the rail line carries 217,000 passengers a day.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →