METRO Magazine Logo
MenuMENU
SearchSEARCH

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

September 3, 2026
The CATS Gold Line in service with the city skyline in the background.

The CATS Gold Line serves 17 stations along four miles of track, connecting Charlotte’s Historic West End with the Plaza Midwood area.

Credit:

Charlotte Area Transit System

2 min to read


The Charlotte Area Transit System (CATS) is marking five years of passenger service on its Gold Line streetcar as the agency prepares to expand the route.

The Gold Line opened for passenger service on August 30, 2021, and currently operates along four miles of track between French Street Station in Charlotte’s Historic West End and Sunnyside Station near Plaza Midwood.

Ad Loading...

Since opening, the streetcar has carried more than 2.8 million passengers across its 17 stations, according to CATS. Among its busiest stops are CTC Arena, Tryon Street, Johnson & Wales, CPCC, and Sunnyside.

Battery Technology Enables Wire-Free Operation

The Gold Line introduced hybrid Siemens S700 streetcars that can operate on either overhead power or onboard batteries.

The battery system allows the vehicles to operate without overhead wires through Uptown Charlotte, preserving the Tryon Street parade route while also allowing the streetcars to pass beneath low-clearance bridges along the alignment.

“The Gold Line serves some of Charlotte’s most historic and vibrant neighborhoods, and its success reflects the value of investing in communities,” said Brent Cagle, interim CEO of CATS. “As we look ahead, we remain focused on building a system that supports every rider, every day.”

Gold Line Expansion Planned

The streetcar is also slated for expansion under CATS’ 2055 Transit System Plan following Mecklenburg County voters’ approval of a sales tax referendum in November 2025.

Ad Loading...

The proposed extension would add approximately six miles of track and up to 17 stations, creating new connections to the Eastland Community Transit Center and Rosa Parks Community Transit Center.

Plans also call for the Gold Line to connect with the proposed Charlotte Gateway Station and other transit corridors, expanding the streetcar’s role within the region’s broader transit network.

More Rail

New Standard Helps Transit Agencies Address Climate Risks
Security and Safety•by Alex Roman•October 19, 2026

CSA Group Releases Climate Resilience Standard for Transit, Passenger Rail

Developed with support from the Standards Council of Canada, CSA D700 guides assessing climate-related risks and planning adaptation measures for transit and passenger rail systems.

Read More →
Crowd waiting for LA Metro bus
Management•by Staff and News Reports•October 16, 2026

LA Metro September Ridership Climbs 3.9%, Led by Rail Growth

The agency recorded more than 27.2 million boardings, with rail ridership increasing 12.4% year over year and the D Line posting the largest gains.

Read More →
METRO Magazine graphic featuring an aerial view of MetroLink extension construction, with the headline “MetroLink Expansion Completed With $192M Airport Project.”
Rail•by Staff and News Reports•October 14, 2026

First Full MetroLink Rail Expansion Completed in 20 Years with $192M Airport Project

The project links two St. Louis-area airports by light rail while adding roadway and bike trail connections to improve regional access and mobility.

Read More →
Ad Loading...
Taking the Guesswork Out of Fleet Replacement
Management•by Alex Roman•October 14, 2026

Utilimarc Launches SmartReplace to Optimize Fleet Replacement Decisions

AI-powered SmartReplace helps fleets prioritize vehicle replacements, model budget scenarios, and build more defensible long-term strategies.

Read More →
An overhead view of APTA EXPO's show floor.
Management•by Alex Roman•October 9, 2026

Scenes from APTA TRANSform & EXPO 2026

Transit leaders, manufacturers, and industry professionals gathered in Chicago to explore new technologies, share ideas, and discuss the future of public transportation.

Read More →
METRO Magazine graphic featuring officials at a Florida rail funding announcement, with the headline “$416M Awarded for Florida Rail Crossing Upgrades and More.”
Rail•by Staff and News Reports•October 8, 2026

USDOT Awards $416 Million for Florida Rail Crossing Safety Upgrades, New Brightline Station

The projects aim to reduce risks for motorists and pedestrians at rail crossings while expanding passenger rail access along Florida’s Space Coast.

Read More →
Ad Loading...
Coastal railroad tracks run between a steep bluff and the Pacific Ocean in San Clemente, California, with rock barriers protecting portions of the shoreline.
Rail•by Elora Haynes•October 1, 2026

OCTA Declares Emergency to Protect Rail Corridor From Coastal Erosion

The California agency is accelerating shoreline protection and plans to place approximately 690,000 cubic yards of sand along the San Clemente coast to protect a key passenger and freight rail link.

Read More →
DRPA interns with program swag.
Management•by Alex Roman•October 1, 2026

More Than a Summer Job: Building the Next Generation of Transit Talent

The Delaware River Port Authority and PATCO have transformed their internship program into a hands-on professional development experience that introduces students to the breadth of transportation careers — and creates a pipeline for future employees.

Read More →
An Amtrak Airo trainset on the Cascades line
Rail•by Alex Roman•September 30, 2026

Airo Trains Make Their Amtrak Cascades Debut in the Pacific Northwest

Effective immediately, two cutting-edge Airo trainsets will join the Amtrak Cascades route, operating four daily trips between Vancouver, B.C., Seattle, Portland, and Eugene, Oregon, marking the first introduction of Airo trains into passenger service anywhere in the country.

Read More →
Ad Loading...
Rail•by Alex Roman•September 29, 2026

Florida's Brightline Announces Financial Restructuring

Brightline Florida says train operations will continue as normal as certain parent entities enter Chapter 11 and financial stakeholders provide $490 million in new long-term capital.

Read More →