METRO Magazine Logo
MenuMENU
SearchSEARCH

WSP to consult for Sound Transit's first BRT system

The high-capacity I-405 BRT project is one of two planned BRT lines for the area.

May 3, 2018
WSP to consult for Sound Transit's first BRT system

WSP USA has been selected to provide consulting services for Sound Transit's first BRT project.

1 min to read


WSP USA has been selected to provide consulting services for Sound Transit's first BRT project.

WSP USA has been selected to provide consulting services to Sound Transit for the I-405 bus rapid transit (BRT) project in the Seattle metropolitan area, which is Sound Transit’s first BRT project and a critical project that is part of ST3 for the Eastside communities.

The high-capacity I-405 BRT project is one of two planned BRT lines for the area. It will connect communities between Lynnwood and Burien with 11 stations along the I-405 corridor. The BRT system will make use of the I-405 Express Toll Lanes to provide improved travel times and will connect to Sound Transit’s light rail system at three locations: the Tukwila International Boulevard Station, the Downtown Bellevue Station and the Lynnwood Transit Center Station.  

Ad Loading...

WSP’s services include planning, environmental and preliminary design for key project elements, including 11 stations and three park-and-rides. The WSP team is also developing the common elements for both Sound Transit’s I-405 and SR 522 BRT projects, which include station architecture, BRT system branding, vehicle selection and a new operations and maintenance base to accommodate both lines.



More Bus

Complete Parts logo
Busby StaffApril 1, 2026

Complete Coach Works Unveils Reimagined Parts Department with Expanded Capabilities

Complete Parts features new branding with a new logo, a new contact telephone number, a dedicated order desk, enhanced processes and inventory, all designed to provide the parts bus operations need.  

Read More →
frontrunner bus
SponsoredApril 1, 2026

Breaking Accessibility Barriers with the Low Floor Frontrunner Minibus

Accessible transit isn’t a feature—it’s a responsibility. This whitepaper explores how the Low-Floor Frontrunner is redefining mobility with a breakthrough design that removes barriers, empowers riders, and delivers measurable operational advantages for agencies. Discover why this next generation minibus is setting a new standard for inclusive transportation.

Read More →
A shot of ENC's manufacturing facility
Busby StaffMarch 31, 2026

ENC Named 'Partner of Choice' to Support Philadelphia SEPTA’s $43M FTA Grant

SEPTA was awarded $43 million in competitive grant funding from the FTA's FY25 Low and No Emission and Bus and Bus Facilities grant programs to support this procurement.

Read More →
Ad Loading...
Cover photo for Bus Tech Talk with Cecil Blandon
Managementby Alex RomanMarch 27, 2026

AC Transit’s Cecil Blandon on Leadership, Mentorship, and a Career in Transit

In part 1 of a two-part conversation, AC Transit’s director of maintenance joins co-hosts Alex Roman and Mark Hollenbeck to discuss his journey from the U.S. Marines to public transit and the role mentorship plays in developing the next generation of industry leaders.

Read More →
An MBTA bus with a passenger boarding at shelter.
Busby StaffMarch 27, 2026

MBTA Confirms Funding for Upgraded Arborway Bus Facility

When construction is complete, battery-electric buses will operate from the Arborway facility on Day One, providing cleaner, quieter, and more reliable service for riders, the MBTA said. After completion, the old facility will be demolished, and the land will be made available for redevelopment.

Read More →
Nadine S. Lee
Managementby StaffMarch 26, 2026

DART's President/CEO Announces Departure from Agency

Nadine S. Lee, who has served as president/CEO since July 2021, said the decision comes after careful reflection on the agency’s progress and its path forward.

Read More →
Ad Loading...
Assemblywoman Castillo and ENC officials at California facility.
Busby StaffMarch 23, 2026

ENC Hosts California Assemblywoman, Celebrates American Manufacturing and Economic Growth

The visit underscored ENC's role as a major employer in Assembly District 58 and its commitment to American manufacturing and skilled local jobs.

Read More →
Cover of METROspectives episode with The Bus Coalition
BusMarch 20, 2026

Inside The Bus Coalition’s Push for Stronger Federal Transit Investment

In this conversation, TBC’s Executive Director Ed Redfern, President Corey Aldridge, and Washington Representative Joel Rubin outline the coalition’s key policy priorities, the challenges facing transit agencies, and how industry stakeholders can work together to strengthen the voice of bus transit at the federal level.

Read More →
County and agency officials break ground in front of a red and yellow King County Metro public transit bus.
Busby StaffMarch 20, 2026

Seattle’s King County Breaks Ground on RapidRide I Line to Expand High-Capacity Transit

The 17-mile RapidRide I Line will bring faster, more frequent service and improved regional connections across South King County.

Read More →
Ad Loading...
paratransit bus
SponsoredMarch 16, 2026

Measuring the True Cost of Paratransit Fleets

What truly drives the cost of a paratransit fleet? Beyond the purchase price, seven operational factors quietly determine maintenance frequency, downtime, and long-term service reliability. This whitepaper explores how these factors shape lifecycle cost and what agencies should evaluate when selecting paratransit vehicles.

Read More →