METRO Magazine Logo
MenuMENU
SearchSEARCH

Alstom receives order for 61 LRVs for Greater Toronto, Hamilton area

The Citadis Spirit is a 100% low-floor vehicle that offers easy accessibility from the street or the curb, and an interior layout featuring a wide central aisle and interior circulation that provide a safer and more enjoyable experience.

May 12, 2017
Alstom receives order for 61 LRVs for Greater Toronto, Hamilton area

Alstom

2 min to read


Alstom

Alstom was awarded a firm order for the supply of 61 Citadis Spirit light rail vehicles for the Greater Toronto and Hamilton area (GTHA) by Metrolinx, an agency of the Government of Ontario. The value of the contract is approximately $387 million. The vehicle supply contract includes an option for additional vehicles.

Alstom will supply Metrolinx a Citadis Spirit, which has a passenger capacity of 321. The Citadis Spirit is a 100% low-floor vehicle that offers easy accessibility from the street or the curb, and an interior layout featuring a wide central aisle and interior circulation that provide a safer and more enjoyable experience.

Ad Loading...

The Citadis Spirit has been designed for the Canadian market, capable of operating in winter conditions up to -38°C. The vehicle is fitted with winterized solutions to ensure vehicle operational performance, as well as preserve passenger comfort and experience, such as reinforced insulation, powerful HVAC, and snow and ice management solutions. All materials used on the vehicles are selected and tested to ensure performances in extreme cold conditions.

Alstom is currently supplying 34 Citadis Spirit vehicles as per a 2013 contract for the City of Ottawa’s O-Train Confederation Line. Alstom has already assembled one-third of the fleet, which are in various stages of dynamic and static testing, from the Belfast Yard Maintenance and Storage facility in Ottawa. In March 2017, the Citadis Spirit vehicle achieved and surpassed commercial speed during dynamic tests along the Confederation Line alignment.

This latest contract with Metrolinx illustrates the success of Alstom’s strategy of customer proximity. Alstom is also supplying Metrolinx with a new Iconis control center to integrate the GO Transit network into a single, centralized facility, and a new signaling system for the Union Station Rail corridor. Furthermore, Alstom is providing a complete Communication-Based Train Control system for Toronto Transit Commission’s Line 1 subway line, including the Toronto-York Spadina Subway Extension.

More Rail

A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →
Ray Melleady and industry leaders on Capitol Hill
Managementby Alex RomanAugust 24, 2026

The Business Voice Behind Public Transportation

As chair of APTA’s Business Members Board of Governors, Ray Melleady explains how more than 850 business members are partnering with transit agencies to advance funding, innovation, and industry-wide collaboration.

Read More →
An Amtrak Cascades Airo Trainset at a station.
Railby Alex RomanAugust 14, 2026

FRA Announces $5.3B in Rail Investments, Including $2B for Amtrak

Funding will support grade-crossing improvements, infrastructure upgrades, and new Amtrak equipment in 23 states.

Read More →
Ad Loading...
Finding the Right Balance: Optimizing Transit Maintenance
ManagementAugust 14, 2026

Finding the ‘Happy Medium’: Optimizing Maintenance Without Sacrificing Reliability

The key to maintenance optimization isn’t doing less work—it’s doing the right work at the right time on the right assets.

Read More →