METRO Magazine Logo
MenuMENU
SearchSEARCH

Jacksonville Celebrates Completion of MobilityWorks Program

With the San Pablo Road Ribbon-Cutting Ceremony, the JTA celebrates the completion of their MobilityWorks 1.0 Program two years ahead of the projected completion date.

MobilityWorks 1.0 before and after

The MobilityWorks 1.0 projects have brought many upgrades to Jacksonville, including the changes that can be seen in this before and after of San Pablo Road.

Photo: JTA

2 min to read


Florida's Jacksonville Transportation Authority (JTA) hosted a ribbon cutting ceremony at River City Science Academy to celebrate the completion of the final MobilityWorks 1.0 project, roadway and transit enhancements along San Pablo Road from Beach Blvd. to Atlantic Blvd.

The San Pablo Road includes almost five miles of new sidewalk, nine new pedestrian crosswalks, 89 new streetlights, over 11,000 linear feet of new storm drainpipe and utility pipe installations, over 22,000 tons of asphalt, and 81 new trees.

Ad Loading...

“MobilityWorks is a shining example of what can be accomplished when we invest in our community’s infrastructure,” said Debbie Buckland, JTA board chair.  “These improvements on San Pablo Road are more than just roadway enhancements — they are investments in safer neighborhoods, improved commutes, and better quality of life. I applaud the JTA team and our partners for delivering on this promise and paving the way for an even brighter future through MobilityWorks 2.0.” 

Overview of MobilityWorks 1.0

The Project began in May 2022 and included reconstruction of the existing roadway from a two-lane to a three-land divided urban section from Beach Boulevard to Crystal Cove Drive and from Osprey Point Drive to Atlantic Boulevard. 

JTA installed raised medians, utility improvements, a closed drainage system, bike lanes, sidewalks, and stormwater ponds.

The roadway was resurfaced with the addition of shoulders, left-turn and right turn lanes, and continuity of the sidewalks from Crystal Cove to Osprey Point Drive.

The project involved a complete overhaul of the stormwater collection and conveyance system on the corridor and realignment adding new turn lanes to reduce queuing and improve traffic flow. 

Ad Loading...

The design for these improvement was based on addressing safety and drainage improvements for motorists, bicyclists, and pedestrians.

JTAMobilityWorks was designed to complete projects funded by the extension of the Local Option Gas Tax in 2014. 

JTA has now completed all 13 roadway projects and mobility corridors initiated under MobilityWorks across Jacksonville.

More Improvements to Come

In March 2023, JTA launched Mobility Works 2.0, another series of 17 projects meant to enhance transportation and mobility through the city while investing $494 million in local option gas tax revenue back into the city’s infrastructure over a 30-year period.

More Management

A subway train stopped at the 48th Street platform in Manhattan.
Managementby Staff and News ReportsApril 1, 2026

Manhattan’s Central Business District Travel Climbs to 6.3 Million Daily Trips as Transit Leads Growth

Although volumes remain below pre-pandemic levels, NYMTC’s latest Hub Bound report shows rising transit use, shifting commute patterns, and continued recovery.

Read More →
frontrunner bus
SponsoredApril 1, 2026

Breaking Accessibility Barriers with the Low Floor Frontrunner Minibus

Accessible transit isn’t a feature—it’s a responsibility. This whitepaper explores how the Low-Floor Frontrunner is redefining mobility with a breakthrough design that removes barriers, empowers riders, and delivers measurable operational advantages for agencies. Discover why this next generation minibus is setting a new standard for inclusive transportation.

Read More →
An MBTA commuter rail at a station.
Railby StaffMarch 31, 2026

Massachusetts Announces Summer Savings for Commuter Rail Riders

With major events and increased travel expected across the state this summer, the Administration is focused on making sure people have a reliable, affordable alternative to driving so we can reduce congestion, support daily commuters, and keep Massachusetts moving.

Read More →
Ad Loading...
A MARTA employee using the new Better Breeze fare ticket machines.
Managementby StaffMarch 30, 2026

Updated: MARTA’s New 'Better Breeze' Fare System Goes Live

The new system introduces tap-to-pay, touchscreen kiosks, and updated Breeze cards, with both old and new systems running through May.

Read More →
ABA Marketplace Report
Motorcoachby StaffMarch 30, 2026

ABA Marketplace Drives $124.9M in Business, New Report Finds

As the American Bus Association marks its 100th year, a new ABA Foundation report highlights the Marketplace’s role as a key revenue engine for the bus and group travel industry.

Read More →
Coach USA, Samsara cover shot
Technologyby Alex RomanMarch 30, 2026

How Coach USA Is Using AI to Prevent Bus Accidents

As motorcoaches navigate increasingly congested urban corridors filled with pedestrians, cyclists, scooters, and distracted drivers, safety leaders across the industry are confronting a growing challenge: visibility.

Read More →
Ad Loading...
Five different gold commemorative Smart Trip card designs.
Managementby StaffMarch 27, 2026

WMATA Proposes Revised FY2027 Budget as System Marks 50 Years of Service

Updated financial plan reflects ridership growth and cost controls as the Washington region’s transit system celebrates five decades of operations.

Read More →
Cover photo for Bus Tech Talk with Cecil Blandon
Managementby Alex RomanMarch 27, 2026

AC Transit’s Cecil Blandon on Leadership, Mentorship, and a Career in Transit

In part 1 of a two-part conversation, AC Transit’s director of maintenance joins co-hosts Alex Roman and Mark Hollenbeck to discuss his journey from the U.S. Marines to public transit and the role mentorship plays in developing the next generation of industry leaders.

Read More →
An AC Transit Tempo bus
Managementby StaffMarch 27, 2026

California's AC Transit Greenlights Development of Service Contingency Plan

In reaching its decision, the board considered the District’s mounting long-term structural deficits, with current projections forecasting annual operating deficits of about $50 million beginning in FY 2027-28 and continuing in the years ahead.

Read More →
Ad Loading...
A CDTA bus
Managementby StaffMarch 27, 2026

New York's CDTA Approves 2027 Operating, Capital Plan

The $143 million spending plan represents a 2.4% reduction from last year’s budget. Increasing expenses, along with depleted federal COVID-19 funds, continue to impact the overall budget, CDTA officials said.

Read More →