METRO Magazine Logo
MenuMENU
SearchSEARCH

NJ TRANSIT Approves Overhaul of 429 Multilevel Railcars

The Multilevel I and II cars, which are approaching 20 years of service, are due for their recommended mid-life overhaul.

November 14, 2025
NJ TRANSIT Approves Overhaul of 429 Multilevel Railcars

In addition to increased mechanical reliability, the new NJ Transit vehicles will offer enhanced seating capacity and accessibility, higher top speeds of up to 110 mph, and improved onboard amenities for customers, including USB charging ports. 

Photo: METRO

2 min to read


NJ TRANSIT advanced its fleet modernization program with board approval of a $917 million investment to overhaul its existing fleet of 429 multilevel railcars.

The Multilevel I and II cars, which are approaching 20 years of service, are due for their recommended mid-life overhaul. 

Ad Loading...

Additionally, as NJ TRANSIT is currently procuring new third-generation Multilevel vehicles, the overhaul will ensure compatibility and interoperability with these new Multilevel III vehicles.

“As I’ve committed to the Governor, modernizing our fleet isn’t just about adding new vehicles — it’s also about keeping our current ones in a state of good repair for the people who ride them every day,” said NJ TRANSIT President/CEO Kris Kolluri. “This overhaul is part of our broader effort to fully modernize NJ TRANSIT’s rail and bus fleets by 2031, ensuring safe, reliable, and modern service for our customers systemwide.”

What's next?

The NJ TRANSIT board authorized funding not to exceed $917,058,512.41, plus 10% for contingencies, to overhaul its fleet of 329 first-generation Multilevel I vehicles, delivered between 2006 and 2009, and 100 Multilevel II vehicles, delivered between 2012 and 2013. 

An Expression of Interest (EOI) process will be used to identify qualified rail vehicle overhaul contractors with proven experience in large-scale commuter railcar mid-life overhaul programs. The EOI process will invite contractors to submit their qualifications, capabilities, and relevant project experience. 

Based on the evaluation of the EOIs received, NJ TRANSIT officials said the agency will develop a list of contractors to be invited to participate in the final procurement and contract award stage. The scope of work includes, but is not limited to:

Ad Loading...
  • Ensuring the cars are in a state of good repair and improving the systems to ensure their reliability and compatibility with new Multilevel III vehicles.

  • Enhancing passenger comfort with upgraded amenities and features to match Multilevel III vehicles, such as USB charging ports.

  • Promoting sustainability with energy-efficient systems and materials where feasible.

Revamping the Fleet

The New Jersey Transit board previously authorized the purchase of 374 new multilevel railcars. These next-generation Multilevel III cars will replace the fleet of single-level vehicles, including the oldest and least reliable Arrow III cars. 

In addition to increased mechanical reliability, the new vehicles will offer enhanced seating capacity and accessibility, higher top speeds of up to 110 mph, and improved onboard amenities for customers, including USB charging ports. 

More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →