METRO Magazine Logo
MenuMENU
SearchSEARCH

Bombardier, MARTA team for FTA track safety pilot

Aims to mitigate the risks of accidents for passengers and transit system workers in the U.S. According to FTA statistics, between 2003 and 2008, 53% of reported rail transit worker fatalities were right-of-way related incidents.

April 17, 2012
1 min to read


Bombardier Transportation teamed up with the Metropolitan Atlanta Rapid Transit Authority (MARTA) in a demonstration project to enhance the safety of rail transit workers at the track side.

The Bombardier/MARTA project was approved by the Federal Transit Administration (FTA), following a request for proposals specifically aimed at improving right-of-way safety for rail transit workers, through innovative use of new and advanced technologies.

Ad Loading...

With this project, the FTA aims to mitigate the risks of accidents for passengers and transit system workers in the U.S. According to FTA statistics, between 2003 and 2008, 53% of reported rail transit worker fatalities were right-of-way related incidents. The Bombardier/MARTA demonstration project, featuring Bombardier's leading-edge TrackSafe technology, was chosen among eight proposals submitted to the FTA.

TrackSafe is a Bombardier turnkey solution that creates improved location awareness for track workers and train operators through the use of Radio Frequency Identification and other advanced technologies. TrackSafe offers an additional element of protection by providing highly relevant alerts to track workers and train operators in real time.

The equipment will be installed between Ashby and Bankhead stations on MARTA's green line. Some preliminary work such as the installation of power and communications feeds has already begun. The demonstration project will be held later in 2012. The results will be communicated through selected industry forums.

More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →