Bombardier project focuses on 'green train of the future'
The Gröna Tåget ("Green Train") research project is a collection of ideas, proposals and technical solutions aimed at making long distance and fast regional services more attractive to travellers and operators.
New generation trains running on existing track can easily combine higher speeds, lower energy consumption, reduced noise and lower costs. These are the findings reported by Swedish researchers in Stockholm after concluding a four-year project, with Bombardier Transportation as one of three major partners.
The Gröna Tåget ("Green Train") research project is a collection of ideas, proposals and technical solutions aimed at making long distance and fast regional services more attractive to travellers and operators. Gröna Tåget is a fast electric tilting train - based on the Bombardier Regina vehicle - that not only maintains higher-speeds than conventional trains on sections with curves but also 186 miles per hour, or more, on dedicated high-speed lines.
The project was conducted in close cooperation between the Swedish Transport Administration, Bombardier, the Royal Institute of Technology in Stockholm and several other partners. In the report, the project team noted that the concept train had set a Swedish speed record, but emphasized that the development program was not a finished train model but should rather be seen as a smorgasbord of proposals and technical innovations adapted to Nordic conditions.
The concept offers operators and infrastructure managers advantages such as flexible train length, reliability and accessibility even in the demanding Nordic climate. It also reduces costs to ensure profitability in competitive markets, increases track-friendliness with less wear to track and wheels, enables high speeds on standard tracks and lowers noise levels compared to the current generation of trains.
Aerodynamic design and more efficient motors, which generate electricity when braking, enable the Green Train to reduce power consumption by 30% to 35%. Thanks to the Nordic track profiles, trains can be designed with greater width than existing trains, enabling more passenger space while maintaining comfort which means higher operational economy and, potentially, lower ticket prices.
The Gröna Tåget technology has been tested in trial runs in all weather conditions since 2005. Its development has involved a large part of the Swedish rail sector, including manufacturers, infrastructure companies, universities, train operators and research institutes. The findings will be made available to all rail industry companies and train manufacturers.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →