METRO Magazine Logo
MenuMENU
SearchSEARCH

Cummins to meet diagnostics, emission regs by 2013

Cummins GM, worldwide bus business, Tom Hodek said the company will meet the OBD as well as the GHG and fuel-efficiency requirements by Jan. 1, 2013, on Monday morning.

October 4, 2011
1 min to read


Cummins Inc. unveiled its complete product portfolio for the transit bus market — diesel, diesel-electric hybrid and natural gas engines designed to meet the 2013 U.S. Environmental Protection Agency (EPA) emissions regulations and new greenhouse gas (GHG) and fuel-efficiency standards — at EXPO 2011 on Monday.

The EPA 2013 emissions regulations call for all on-highway engines to be equipped with On-Board Diagnostics (OBD), which monitors emissions-related engine systems and components and alerts the operator of malfunctions. It is also designed to further enhance the engine and operating system by providing early detection of emissions-related faults.  

Ad Loading...

New regulations for 2014 have recently been finalized by the EPA and the U.S. Department of Transportation, instituting equivalent carbon dioxide (CO2) and fuel-efficiency standards. By burning less fuel in the engine, CO2 is simultaneously reduced.

Cummins GM, worldwide bus business, Tom Hodek said the company will meet the OBD as well as the GHG and fuel-efficiency requirements by Jan. 1, 2013, on Monday morning.

 

Topics:CumminsBus

More Bus

FlixBus vehicles in a parking garage.
ManagementApril 13, 2026

Intercity Bus Industry Outlook: A Mix of Apprehension & Optimism

Industry leaders see both promise and peril ahead as intercity bus travel rebounds, but unpredictable market forces threaten to reshape the sector.

Read More →
Cover Photo for Bus Tech Talk
ManagementApril 9, 2026

Bus Tech Talk: AC Transit’s Cecil Blandon on Leadership, Mentorship, and a Career in Transit

In Part 1, Blandon shares his journey from the U.S. Marines to a leadership role in public transit, along with insights on mentorship and professional growth within the industry.

Read More →
A blurry TransLink R2 rapid bus
Managementby StaffApril 8, 2026

Vancouver's TransLink Fast-Tracks RapidBus Line to Metrotown

Funded through the 2025 Investment Plan, the new R2 Marine–Willingdon RapidBus is expected to begin service in September, more than three months ahead of schedule.

Read More →
Ad Loading...
Complete Parts logo
Busby StaffApril 1, 2026

Complete Coach Works Unveils Reimagined Parts Department with Expanded Capabilities

Complete Parts features new branding with a new logo, a new contact telephone number, a dedicated order desk, enhanced processes and inventory, all designed to provide the parts bus operations need.  

Read More →
frontrunner bus
SponsoredApril 1, 2026

Breaking Accessibility Barriers with the Low Floor Frontrunner Minibus

Accessible transit isn’t a feature—it’s a responsibility. This whitepaper explores how the Low-Floor Frontrunner is redefining mobility with a breakthrough design that removes barriers, empowers riders, and delivers measurable operational advantages for agencies. Discover why this next generation minibus is setting a new standard for inclusive transportation.

Read More →
A shot of ENC's manufacturing facility
Busby StaffMarch 31, 2026

ENC Named 'Partner of Choice' to Support Philadelphia SEPTA’s $43M FTA Grant

SEPTA was awarded $43 million in competitive grant funding from the FTA's FY25 Low and No Emission and Bus and Bus Facilities grant programs to support this procurement.

Read More →
Ad Loading...
Cover photo for Bus Tech Talk with Cecil Blandon
Managementby Alex RomanMarch 27, 2026

AC Transit’s Cecil Blandon on Leadership, Mentorship, and a Career in Transit

In part 1 of a two-part conversation, AC Transit’s director of maintenance joins co-hosts Alex Roman and Mark Hollenbeck to discuss his journey from the U.S. Marines to public transit and the role mentorship plays in developing the next generation of industry leaders.

Read More →
An MBTA bus with a passenger boarding at shelter.
Busby StaffMarch 27, 2026

MBTA Confirms Funding for Upgraded Arborway Bus Facility

When construction is complete, battery-electric buses will operate from the Arborway facility on Day One, providing cleaner, quieter, and more reliable service for riders, the MBTA said. After completion, the old facility will be demolished, and the land will be made available for redevelopment.

Read More →
Nadine S. Lee
Managementby StaffMarch 26, 2026

DART's President/CEO Announces Departure from Agency

Nadine S. Lee, who has served as president/CEO since July 2021, said the decision comes after careful reflection on the agency’s progress and its path forward.

Read More →
Ad Loading...
Assemblywoman Castillo and ENC officials at California facility.
Busby StaffMarch 23, 2026

ENC Hosts California Assemblywoman, Celebrates American Manufacturing and Economic Growth

The visit underscored ENC's role as a major employer in Assembly District 58 and its commitment to American manufacturing and skilled local jobs.

Read More →