METRO Magazine Logo
MenuMENU
SearchSEARCH

FRA issues new reg limiting consecutive hours of service

The new rule, based on “fatigue science,” will use fatigue modeling tools and data on human alertness factors and guide the scheduling of train crews to reduce the likelihood of a hazardous work schedule. It includes maximum on-duty periods and minimum off-duty periods for passenger train employees.

August 12, 2011
2 min to read


The U.S. Department of Transportation (DOT) issued a final rule limiting the number of consecutive hours passenger railroad workers can be on the job. The new Federal Railroad Administration (FRA) regulation will reduce risk and improve safety for the railroad industry, and for the first time, differentiate between freight and passenger service.

Designed to reduce accidents related to fatigue, the final rule applies “fatigue science” to employee work schedules to determine maximum on-duty periods and minimum off-duty periods. The DOT is engaging in a broad initiative to bring scientific data into work scheduling, and the FRA rule is the first rule in that effort to be completed.

Through the use of fatigue modeling tools and data on human alertness factors, this new rule will guide the scheduling of train crews to reduce the likelihood of a hazardous work schedule. This rule recognizes the difference between work during daylight hours and work during nighttime hours when fatigue is most likely to occur. 

The final rule includes:

• Maximum on-duty periods and minimum off-duty periods for passenger train employees including locomotive engineers, and conductors.

• Requirements for railroads to identify schedule-specific risks of fatigue using an approved, scientifically validated, and calibrated bio-mathematical model of human performance and fatigue.

• Requirements for railroads to develop and carry out plans to mitigate fatigue risks before safety may be compromised.

The final rule also requires railroads to submit certain work schedules of their passenger train employees and fatigue mitigation plans to FRA for approval, and to provide fatigue training.

Fatigue management is also a key part of FRA’s Risk Reduction Program — an industry, labor and agency initiative designed to improve safety and build strong safety cultures. It seeks to identify and correct safety risk factors using predictive data beyond the traditional accident and injury data currently used. Recognizing risk indicators before an accident happens provides one of the greatest opportunities for improved safety and performance.

This final rule is authorized by the Rail Safety Improvement Act of 2008, which, for the first time in history, gives FRA the authority to replace the existing statutory limitations (first enacted in 1907) with a new set of hours of service regulations governing train employees providing passenger rail transportation. The final rule was developed with the assistance of FRA’s Railroad Safety Advisory Committee, which includes representatives from the railroad industry, railroad labor and other stakeholder groups.

Click here for the final rule, which will become effective on October 15, 2011.

More Rail

An overhead rendering of the Austin Transit Partnership rail system.
Railby StaffApril 16, 2026

Austin Transit Partnership Names Contractor for Light Rail Operations Facility

The ATP board’s approval of the KAP team enables ATP to begin pre-construction activities, including advancing design, initiating permitting, and preparing the site for future construction.

Read More →
A Coach USA Van Hool CX 45 delivered by ABC Companies.
Busby StaffApril 15, 2026

ABC Delivers Van Hools to Coach USA and More in Biz Briefs

In METRO's latest installment, we take a look at the latest news from suppliers including Moovit, CAF, and more.

Read More →
A photo of an Amtrak train with a logo
Technologyby StaffApril 15, 2026

Amtrak Advances Plan for New Long-Distance Fleet

The railroad has issued a formal request for proposals to manufacturers for more than 800 new passenger railcars that will serve 14 long-distance routes nationwide.

Read More →
Ad Loading...
A headshot of Inez Evans Benson
Busby Alex RomanApril 15, 2026

Inez Evans Benson on Rethinking Transit Through Customer Experience

The WSP leader discusses why agencies must look beyond satisfaction metrics and take a more holistic, community-driven approach to service.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Technologyby StaffApril 14, 2026

Alstom Delivers First Multilevel III NJ TRANSIT Commuter Railcar

The delivery marks the first car in a 374‑vehicle order and begins the arrival of a new generation of higher‑capacity, more reliable, and more comfortable trains for one of the country’s busiest commuter rail systems.

Read More →
A BART train on the tracks.
Railby StaffApril 13, 2026

San Francisco's BART Breaks Multiple Records for Post-Pandemic Ridership in March

BART recorded 5,403,140 exits in March, making it the highest monthly ridership since the pandemic and surpassing the previous high set in October 2025 (5,346,890 exits).

Read More →
Ad Loading...
Ribbon cutting photo celebrating SEPTA's new Ardmore Station
Railby StaffApril 13, 2026

Philadelphia's SEPTA Celebrates New Ardmore Station

The station was rebuilt as part of SEPTA’s Station Accessibility Program, making it fully ADA accessible with new elevators, ramps, and high-level platforms.

Read More →
Two Metra locomotives on rail tracks.
Railby StaffApril 10, 2026

Metra Reaches New 10-Year Agreement with BNSF

The announcement highlights the long-standing partnership between the Class I railroad and the commuter rail system, dating back to Metra's creation in 1983.

Read More →
Ribbon cutting at Siemens' new North Carolina facility.
Railby StaffApril 9, 2026

Siemens Opens North Carolina Railcar Manufacturing Facility

Site construction is complete, production is underway, and the first locally built passenger coaches are on track for delivery in Summer 2026.

Read More →
Ad Loading...
Two MBTA railcars in station.
Railby StaffApril 9, 2026

MBTA Completes Key Red Line Signal Upgrade Weeks Early

Crews completed a significant portion of the testing required before commissioning the new, digital signaling system, which will bring important upgrades that strengthen Red Line service reliability for riders and provide Red Line Operations the ability to route trains more quickly, turn trains around faster, and recover from unplanned disruptions more efficiently, said MBTA officials. 

Read More →