METRO Magazine Logo
MenuMENU
SearchSEARCH

FRA issues new reg limiting consecutive hours of service

The new rule, based on “fatigue science,” will use fatigue modeling tools and data on human alertness factors and guide the scheduling of train crews to reduce the likelihood of a hazardous work schedule. It includes maximum on-duty periods and minimum off-duty periods for passenger train employees.

August 12, 2011
2 min to read


The U.S. Department of Transportation (DOT) issued a final rule limiting the number of consecutive hours passenger railroad workers can be on the job. The new Federal Railroad Administration (FRA) regulation will reduce risk and improve safety for the railroad industry, and for the first time, differentiate between freight and passenger service.

Designed to reduce accidents related to fatigue, the final rule applies “fatigue science” to employee work schedules to determine maximum on-duty periods and minimum off-duty periods. The DOT is engaging in a broad initiative to bring scientific data into work scheduling, and the FRA rule is the first rule in that effort to be completed.

Through the use of fatigue modeling tools and data on human alertness factors, this new rule will guide the scheduling of train crews to reduce the likelihood of a hazardous work schedule. This rule recognizes the difference between work during daylight hours and work during nighttime hours when fatigue is most likely to occur. 

The final rule includes:

• Maximum on-duty periods and minimum off-duty periods for passenger train employees including locomotive engineers, and conductors.

• Requirements for railroads to identify schedule-specific risks of fatigue using an approved, scientifically validated, and calibrated bio-mathematical model of human performance and fatigue.

• Requirements for railroads to develop and carry out plans to mitigate fatigue risks before safety may be compromised.

The final rule also requires railroads to submit certain work schedules of their passenger train employees and fatigue mitigation plans to FRA for approval, and to provide fatigue training.

Fatigue management is also a key part of FRA’s Risk Reduction Program — an industry, labor and agency initiative designed to improve safety and build strong safety cultures. It seeks to identify and correct safety risk factors using predictive data beyond the traditional accident and injury data currently used. Recognizing risk indicators before an accident happens provides one of the greatest opportunities for improved safety and performance.

This final rule is authorized by the Rail Safety Improvement Act of 2008, which, for the first time in history, gives FRA the authority to replace the existing statutory limitations (first enacted in 1907) with a new set of hours of service regulations governing train employees providing passenger rail transportation. The final rule was developed with the assistance of FRA’s Railroad Safety Advisory Committee, which includes representatives from the railroad industry, railroad labor and other stakeholder groups.

Click here for the final rule, which will become effective on October 15, 2011.

More Rail

A rendering of Trinity Metro's future station at the Medical Center
Rail•by Alex Roman•October 30, 2026

Trinity Metro Breaks Ground on $270M TEXRail Extension

The 2.1-mile extension will connect Fort Worth’s Medical District and Near Southside to downtown, surrounding communities, and Dallas-Fort Worth International Airport.

Read More →
Austin Light Rail rendering from UT perspective
Rail•by Alex Roman•October 30, 2026

Bringing Austin’s First Light Rail System to Life

Austin Transit Partnership CEO Greg Canally discusses the city's nearly 10-mile light rail project, its collaborative approach to project delivery, the importance of community engagement, and the milestones ahead as construction approaches in 2027.

Read More →
Two Metra locomotives on rail tracks.
Rail•by Alex Roman•October 29, 2026

Metra Draft Plan Outlines Costs, Service Improvements for Regional Rail

The Systemwide Network Plan identifies infrastructure needs and potential investments to expand all-day, bidirectional rail service across the Chicago region.

Read More →
Ad Loading...
METRO Magazine graphic featuring railroad tracks and switches inside a dark tunnel with the headline “Amtrak Completes First Street Tunnel Upgrades, Restores Service.”
Rail•by Elora Haynes•October 29, 2026

Amtrak Completes First Street Tunnel Upgrades, Restores Service

The nine-day construction project included replacing aging track infrastructure and modernizing switch systems near Washington Union Station.

Read More →
FRA Invests $2.3B in Rail Projects Nationwide
Rail•by Alex Roman•October 28, 2026

FRA Announces $2.3B for Passenger, Freight Rail Projects Nationwide

The CRISI Grant Program funding will support rail infrastructure improvements, safety upgrades, and projects aimed at improving freight and passenger rail service across 45 states and Washington, D.C.

Read More →
A Caltrain electric railcar on the tracks
Rail•by Alex Roman•October 27, 2026

Caltrain’s Electrification Drives a New Era of Ridership Growth

The railroad’s shift to electric service has brought more frequent trains, stronger customer satisfaction, and increased ridership, earning it APTA’s Outstanding Public Transportation System award.

Read More →
Ad Loading...
METRO Magazine graphic featuring a dark blue background with abstract curved lines and the headline “FTA Advances $164M Broward County Commuter Rail Project.”
Rail•by Staff and News Reports•October 26, 2026

FTA Advances $164M Broward County Commuter Rail Project

The proposed 10.5-mile commuter rail extension would connect Fort Lauderdale and Aventura, expanding passenger rail options in South Florida.

Read More →
An A line MTA subway car near the soon to be replaced signaling system.
Rail•by Staff and News Reports•October 23, 2026

New York MTA Launches Historic $1.9B Signal, Track Modernization Project

Funded in part by congestion pricing revenue, the project will replace nearly century-old signals along the A and C lines in Brooklyn and Queens.

Read More →
The LA Metro San Fernando Valley light rail extension corridor
Rail•by Alex Roman•October 20, 2026

LA Metro Breaks Ground on East San Fernando Valley Light Rail Project

The 6.7-mile line will add 11 stations along Van Nuys Boulevard, expand access to jobs and regional transit connections, and support Metro’s broader efforts to improve mobility as rail ridership grows.

Read More →
Ad Loading...
New Standard Helps Transit Agencies Address Climate Risks
Security and Safety•by Alex Roman•October 19, 2026

CSA Group Releases Climate Resilience Standard for Transit, Passenger Rail

Developed with support from the Standards Council of Canada, CSA D700 guides assessing climate-related risks and planning adaptation measures for transit and passenger rail systems.

Read More →