METRO Magazine Logo
MenuMENU
SearchSEARCH

Link Light Rail Reaches Seattle’s University District, Other Neighborhoods

The 4.3-mile extension adds three new stations to the system, with one at each of Northgate, Roosevelt, and U District. Trips are 13 minutes from Northgate to downtown Seattle.

by Staff
October 5, 2021
Link Light Rail Reaches Seattle’s University District, Other Neighborhoods

The Link light rail network will nearly triple in reach, from 22 miles to 62 miles, with service to Tacoma’s Hilltop in 2022, East King County in 2023, and Lynnwood, Federal Way, and Downtown Redmond in 2024. 

Photo: Sound Transit

2 min to read


Riders now have more options for travel as Sound Transit opened the Northgate light rail extension. The 4.3-mile extension adds three new stations to the system, with one at each of Northgate, Roosevelt, and U District. Trips are 13 minutes from Northgate to downtown Seattle. 

"This is a historic day and the start of three years that will transform how people get around our region," said Kent Keel, Sound Transit board chair and University Place council member. "Northgate Link will let thousands of riders get to their destinations on time without sitting in horrendous traffic. We are able to celebrate this milestone thanks to support from Federal Transit Administration, our congressional delegation and the regional voters who approved building a world-class transit system for our growing communities." 

Ad Loading...

The Link light rail network will nearly triple in reach, from 22 miles to 62 miles, with service to Tacoma’s Hilltop in 2022, East King County in 2023, and Lynnwood, Federal Way, and Downtown Redmond in 2024. 

"The opening of Northgate Link is a great leap forward for Puget Sound commuters, the first of many leaps forward for Sound Transit in the coming years," said Peter Rogoff. Sound Transit CEO. "As Sound Transit looks to nearly triple our light rail network in just the next three years, we are thankful for the hard work and dedication of staff and the construction workforce in achieving this monumental feat in the middle of a pandemic." 

The baseline budget for the project was $1.9 billion. It includes a $615 million credit agreement under the Transportation Infrastructure Finance and Innovation Act (TIFIA). The project is coming in approximately $50 million under budget. 

"The opening of the Northgate Link Extension will vastly improve travel between North Seattle and downtown," said Nuria Fernandez, FTA administrator. "With a seamless connection to the rest of the Link network, more people can easily reach jobs, schools, and other opportunities throughout the region and replace sitting in traffic with safe, fast and efficient light rail service." 

More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →