METRO Magazine Logo
MenuMENU
SearchSEARCH

Long Island RR "Gap Rap" video targets platform gap safety

Other actions include installing more than 121,000 linear feet of one-inch platform edging board at LIRR stations to help reduce the horizontal gap.

July 16, 2010
Long Island RR "Gap Rap" video targets platform gap safety

Dr. John Clarke, LIRR's medical director, leads a group of fifth graders, during a public service video promoting awareness of platform gaps.

2 min to read


[IMAGE]The-Gap-Rap-full-1.jpg[/IMAGE]The MTA Long Island Rail Road (LIRR) recently released a public service video targeting gap safety via an entertaining rap performance.

The public service video features "The Gap Rap", written by and co-starring LIRR’s Medical Director Dr. John Clarke.

During his nearly four-minute video, Dr. Clarke exhorts customers to be aware of their surroundings as they travel on the railroad. The fast moving, LIRR-produced rap video features Dr. Clarke, wearing his physician’s white coat, leading a group of fifth graders from Lindell School in Long Beach as they travel on the LIRR, in Manhattan, and on Long Island, all the while harmonizing to the beat as they remind us to “Look down, step over and watch the gap.”

LIRR President Helena Williams said, “Dr. Clarke’s innovative approach will help the LIRR continue to spread the word about gap safety. I’m hopeful this unique video will keep our gap message fresh and reach a wide audience, especially our younger travelers.”

Dr. Clarke, who captured wide media attention for his award-winning public service announcement H1N1 Flu Rap, was enthusiastic about his new video, “I recognize that gap accidents are quite preventable. I knew that Health-Hop would be a perfect way to spread the message and make an impact.”

So far in 2010 the LIRR has experienced a reduction in year-to-date (January 1-July 1) reported gap incidents of 15 percent (2010-33 gap incidents vs. 2009-39 gap incidents).

Dr. Clarke’s video is the latest effort by the LIRR to raise awareness of the gap and to help assure that the traveling public safely steps over this necessary space between trains and station platforms. Railroad initiatives have included special Be Train Smart brochures, posters, signs, and celebrity gap announcements at stations and by train crews.

The railroad has also made a concerted effort to reduce the gap through engineering and operating solutions. Since 2007, more than 121,000 linear feet of one-inch platform edging board has been installed at LIRR stations to help reduce the horizontal gap. In addition, where necessary, measures to reduce vertical platform gaps an average of three inches have been taken at 42 stations. Some 836 train cars have also been retro-fitted with two-inch threshold plates marked “Watch The Gap,” further reducing the gap space.  

 METRO TV: To watch "The Gap Rap" video, click here.

More Rail

A rendering of Trinity Metro's future station at the Medical Center
Rail•by Alex Roman•October 30, 2026

Trinity Metro Breaks Ground on $270M TEXRail Extension

The 2.1-mile extension will connect Fort Worth’s Medical District and Near Southside to downtown, surrounding communities, and Dallas-Fort Worth International Airport.

Read More →
Austin Light Rail rendering from UT perspective
Rail•by Alex Roman•October 30, 2026

Bringing Austin’s First Light Rail System to Life

Austin Transit Partnership CEO Greg Canally discusses the city's nearly 10-mile light rail project, its collaborative approach to project delivery, the importance of community engagement, and the milestones ahead as construction approaches in 2027.

Read More →
Two Metra locomotives on rail tracks.
Rail•by Alex Roman•October 29, 2026

Metra Draft Plan Outlines Costs, Service Improvements for Regional Rail

The Systemwide Network Plan identifies infrastructure needs and potential investments to expand all-day, bidirectional rail service across the Chicago region.

Read More →
Ad Loading...
METRO Magazine graphic featuring railroad tracks and switches inside a dark tunnel with the headline “Amtrak Completes First Street Tunnel Upgrades, Restores Service.”
Rail•by Elora Haynes•October 29, 2026

Amtrak Completes First Street Tunnel Upgrades, Restores Service

The nine-day construction project included replacing aging track infrastructure and modernizing switch systems near Washington Union Station.

Read More →
FRA Invests $2.3B in Rail Projects Nationwide
Rail•by Alex Roman•October 28, 2026

FRA Announces $2.3B for Passenger, Freight Rail Projects Nationwide

The CRISI Grant Program funding will support rail infrastructure improvements, safety upgrades, and projects aimed at improving freight and passenger rail service across 45 states and Washington, D.C.

Read More →
A Caltrain electric railcar on the tracks
Rail•by Alex Roman•October 27, 2026

Caltrain’s Electrification Drives a New Era of Ridership Growth

The railroad’s shift to electric service has brought more frequent trains, stronger customer satisfaction, and increased ridership, earning it APTA’s Outstanding Public Transportation System award.

Read More →
Ad Loading...
METRO Magazine graphic featuring a dark blue background with abstract curved lines and the headline “FTA Advances $164M Broward County Commuter Rail Project.”
Rail•by Staff and News Reports•October 26, 2026

FTA Advances $164M Broward County Commuter Rail Project

The proposed 10.5-mile commuter rail extension would connect Fort Lauderdale and Aventura, expanding passenger rail options in South Florida.

Read More →
An A line MTA subway car near the soon to be replaced signaling system.
Rail•by Staff and News Reports•October 23, 2026

New York MTA Launches Historic $1.9B Signal, Track Modernization Project

Funded in part by congestion pricing revenue, the project will replace nearly century-old signals along the A and C lines in Brooklyn and Queens.

Read More →
The LA Metro San Fernando Valley light rail extension corridor
Rail•by Alex Roman•October 20, 2026

LA Metro Breaks Ground on East San Fernando Valley Light Rail Project

The 6.7-mile line will add 11 stations along Van Nuys Boulevard, expand access to jobs and regional transit connections, and support Metro’s broader efforts to improve mobility as rail ridership grows.

Read More →
Ad Loading...
New Standard Helps Transit Agencies Address Climate Risks
Security and Safety•by Alex Roman•October 19, 2026

CSA Group Releases Climate Resilience Standard for Transit, Passenger Rail

Developed with support from the Standards Council of Canada, CSA D700 guides assessing climate-related risks and planning adaptation measures for transit and passenger rail systems.

Read More →