Maryland Transit Lands $213.6M for Light Rail Vehicle Replacement
The State of Maryland is providing $90 million in matching funds and allocating $127.6 million in federal formula funds to the project to complement the federal grant

The agency’s existing light rail fleet includes standard, 95-foot railcars dating back to the system’s launch in 1992.
Photo: MDOT MTA
The Maryland Transit Administration (MTA) was awarded $213.6 million in grant funding from the Federal Transit Administration’s Rail Vehicle Replacement program. The grant will support the MTA’s efforts to replace all 52 aging light rail vehicles in its fleet with new, modern railcars.
The State of Maryland is providing $90 million in matching funds and allocating $127.6 million in federal formula funds to the project to complement the federal grant, which was made possible by the Infrastructure Investment and Jobs Act (IIJA).
“Safe, reliable, and accessible transit is fundamental to the economic success of the Baltimore region and its people,” said Maryland Transit Administrator Holly Arnold. “This grant will help to ensure that Baltimore and Maryland continue to provide an equitable, modern transit system for years to come.”
MTA’s Need for Railcar Funding
The $450 million light rail vehicle replacement project is identified as a high priority in the agency’s Transit Asset Management Plan and Capital Needs Inventory, and is included in the Baltimore Metropolitan Council’s long-range plan.
The agency’s existing light rail fleet includes standard, 95-foot railcars dating back to the system’s launch in 1992. All vehicles have reached the end of their useful life, or will be reaching the end of their useful life within five years — a timeframe required by the Rail Vehicle Replacement program.
The proposed replacement for each light rail car in the fleet is a modern, low-floor vehicle allowing for easier, more accessible boarding, making the system more efficient and convenient to use for all passengers.
The project will also improve the frequency and reliability of the light rail system by reducing the number of vehicles that are regularly out of service for repairs.
Benefits of the Project
The project’s benefits include:
Improved accessibility and mobility: Elimination of steps up to the railcars will be more accommodating to all riders, including individuals using wheelchairs, mobility devices, or pushing strollers.
Increased frequency: New, more reliable trains will allow for shorter headways, reducing wait times for riders.
Enhanced safety and comfort: The introduction of new trains will avoid safety challenges associated with aging vehicles and provide a more comfortable riding experience for passengers.
Lower maintenance costs, higher performance: Ensuring all light rail vehicles are in a state of good repair will reduce maintenance costs and improve service performance through the increased availability of trains.
Improved equity: Investment in the light rail system will benefit its more than 13,000 daily riders, including those from the 17 stations located in locations designated as Areas of Persistent Poverty.
The IIJA has allocated $1.5 billion through 2026 to create the FTA’s Rail Vehicle Replacement program. To date, that program has invested over $700 million in projects across the country to replace aging railcars and ensure safe and accessible travel to the communities that rely on them.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →